Discharge of Conditions 9 and 10 of previously approved application LA06/2022/1076/F, in relation to plots 61-67. Condition 9 - Prior to the occupation of the proposed development, a Verification Report shall be submitted to and agreed in writing by the Council. This report shall demonstrate the successful completion of remediation works and demonstrate that the site is now fit for end-use, including details of: a) Capping system • The report shall demonstrate that an appropriate capping system has been installed within the garden and landscaped areas. This must comprise a 600mm capping system with a minimum of 200mm crushed stone capillary break in the base overlain with 400mm of clean material above subsoil and topsoil. The report must include details of the methodology and programme of the capping system. • Photographs and records of any excavation works within the source area including photographs showing depths to accommodate the capping layer. • Records and photographs of the clean material being used and placed on the source area, also showing depths being placed. • Details of the materials that were used for the capping system along with laboratory certificates and results which confirm that the materials are suitable for use. b) Gas Protection measures • The measures must demonstrate compliance with the requirements of CS2 as prescribed in guidance within CIRIA C665 and attain a gas protection score of at least 3.5 with the report including. • Final designs of building gas protection measures • Details of any specific products used. • Records from the installation process including photographic records of: • The installation of the under-floor void • The construction of the concrete floor • Membrane installation works and • Records of inspection of installed gas protection measures Reason: Protection of human health. Condition 10 - If during the development works, new contamination or risks are encountered which have not previously been identified, works shall cease and the Council shall be notified immediately. This new contamination shall be fully investigated in accordance with the Model Procedures for the Management of Land Contamination (CLR11). In the event of unacceptable risks being identified, a remediation strategy shall be agreed with the Council in writing, and subsequently implemented and verified to its satisfaction. Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other off site receptors. PLOTS 61-62-63-64-65-66-67 ONLY RSK REPORT FOR PLOTS 61-62-63-64-65-66-67 ONLY

As published by the council, reference LA06/2025/0740/DC

Timeline

Dates from the published record

  1. 19 Aug 2025

    Received by Ards and North Down

  2. 8 Oct 2025

    Decision issued: Condition Partially Discharged

  3. 29 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • 50 Main Street and lands to rear of 38-48 Main Street Carrowdore

    Discharge of Conditions 12 and 13 of LA06/2022/0881/F, in relation to plots 1 - 13 - Condition 12 - Prior to the occupation of the proposed development, a Verification Report shall be submitted to and agreed in writing by the Council. This report shall demonstrate the successful completion of remediation works and demonstrate that the site is now fit for end-use, including details of: a) Capping system • An appropriate capping system shall be installed within the garden and landscaped areas. A 600mm capping system is required in garden and landscaping areas with a minimum of 200mm crushed stone capillary break in the base overlain with 400mm of clean material above subsoil and topsoil. The report must include details of the methodology and programme of the capping system. • Photographs and records of any excavation works within the source area including photographs showing depths to accommodate the capping layer. • Records and photographs of the clean material being used and placed on the source area, also showing depths being placed. • Details of the materials that were used for the capping system along with laboratory certificates and results which confirm that the materials are suitable for use. b) Gas Protection measures • The measures must demonstrate compliance with the requirements of CS2 as prescribed in guidance within CIRIA C665 and attain a gas protection score of at least 3.5 with the report including. • Final designs of building gas protection measures • Details of any specific products used. • records from the installation process including photographic records of: • the installation of the under-floor void • the construction of the concrete floor • membrane installation works and • Records of inspection of installed gas protection measures Reason: Protection of human health Condition 13 - If during the development works, new contamination or risks are encountered which have not previously been identified, works shall cease and the Council shall be notified immediately. This new contamination shall be fully investigated in accordance with the Model Procedures for the Management of Land Contamination (CLR11). In the event of unacceptable risks being identified, a remediation strategy shall be agreed with the Council in writing, and subsequently implemented and verified to its satisfaction. Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.

    19 Aug 2025 92m away Conditions
  • 18 McBriar Park, Carrowdore

    1.5-storey garage extension to side, dormer to rear, and second-floor window on gable.

    15 Aug 2025 133m away Full applications
  • la06/2025/0707/S54 Awaiting decision

    Strangford Integrated College Abbey Road, Carrowdore BT22 2GB

    Variation of Condition 2 of planning approval LA06/2019/1207/F re vehicular access and sight splays (Full Description available on Planning Portal)

    12 Aug 2025 471m away
  • LA06/2025/0707/F Awaiting decision

    Strangford Integrated College Abbey Road, Carrowdore BT22 2GB

    Retrospecive vehicular access and sight splays (Full Description available on Planning Portal) (Amended Application Form)

    12 Aug 2025 471m away Full applications
  • LA06/2026/0448/RM Awaiting decision

    Land East of 17 New Road Carrowdore BT22 2JJ

    Two storey dwelling and associated road entrance

    22 May 2026 495m away Reserved matters
  • 17 New Road, Carrowdore, BT22 2JJ

    Two storey dwelling and associated road entrance

    22 Sep 2025 496m away Outline

In Ards and North Down

  • Lands to the rear of 23-61 Castle Street, Comber, BT23 5EA

    Discharge of Condition 6 of previously approved application LA06/2021/1220/F which states - Prior to the occupation of the proposed development, a Verification Report shall be submitted to and agreed in writing by the Council. This report shall demonstrate that the remediation measures outlined in the Pentland Macdonald report; Contamination Assessment and remediation strategy, Castle Lane, Comber referenced PM19- 1137 and dated December 20219 have been implemented. The Verification Report shall demonstrate the successful completion of remediation works and that the site is now fit for end-use (Residential with Plant Uptake). It must demonstrate that the identified potential pollutant linkages are effectively broken. The Verification Report shall be in accordance with current guidance and best practice. In particular, this Verification Report must demonstrate that: • The final site layout including areas of hardstandlng, gardens and soft landscaped areas are as specified in the Site Plan Proposed Drawing No. 03A. • The emplacement of capping layers across gardens and landscaped areas is as specified: In garden areas- 1m capping layer comprising a capillary break layer of a minimum of 300mm of granular material; overlain by 700mm of clean subsoil and topsoil and in soft landscaped areas- the emplacement of a 0.5m thick capping layer of glean gravel/ subsoil topsoil. All material used in the capping layers must be demonstrably proven suitable for use. • Gas protection measures have been installed in line with a Characteristic Situation 2 scenario which attain a gas protection score of 3.5 (Table 4, B88485) and shall include two or more of the following measures: • Concrete floor slabs; • A proprietary gas resistant membrane installed across the entire footprint of the buildings; • A passively ventilated under floor void. The verification of the gas protection measures shall follow CIRIA C735 Good Practice on the testing and verification of protection systems for buildings against hazardous ground gases. Information Submitted: Verification Report

    11 Jun 2026 Conditions
  • LA06/2026/0656/DC Awaiting decision

    Lands to and South of Nos 37-77 Court Street and Nos 1-11 Canal Row, situated within Bawn Wall and bounded by the Canal, Newtownards

    Discharge of condition 15 of planning approval LA06/2023/2434/F Which States: "On completion of the remediation and prior to the occupation of any dwelling hereby approved, the applicant shall provide to the Council, for approval in writing, a Verification Report. This report shall demonstrate that the remediation measures outlined in the report titled; ‘Contaminated Land Assessment (Phase 1 PRA, Phase 2 GQRA and Outline Remediation Strategy) Lands within the Bawn Wall, Newtownards, referenced P3098-1 and dated November 2023, have been fully implemented. This report shall demonstrate the successful completion of remediation works and demonstrate that the site is now fit for end-use and include details of: • Capping system • The methodology and programme of the capping system • Photographs and records of any excavation works within the source area including photographs showing depths to accommodate the capping layer • Photographs of the clean material being used and placed on the source area, also showing depths being placed • Records and photographs showing the depth of the capping system as required • Details of the materials that were used for the capping system along with laboratory certificates and results which confirm that the materials are suitable for use."

    20 Jul 2026 Conditions
  • Lands to the rear of Nos. 23-61 Castle Street, Comber, BT23 5EA

    Discharge of Condition 12 of previously approved application LA06/2021/1220/F which states:- No residential units shall be occupied until a Landscape Management and Maintenance Plan has been submitted to and approved by the Council in writing. The plan shall set out the period of the plan, long term objectives, management responsibilities, performance measures and maintenance schedules for all areas of landscaping and open space. The landscape management plan shall be carried out as approved in perpetuity. Landscape Management & Maintenance Plan Condition and Discharge of Condition 13. which states:- The long term management and maintenance of the open space, as indicated in blue on Drawing No. 19 shall be undertaken by a management company commissioned by the developer. Details of the arrangements to be put in place to establish the management company and details of the alternative measures which will take effect in the event that the management arrangements break down, must be submitted to and agreed in writing with the Council prior to the occupation of any part of the development hereby permitted Radius Housing letter

    11 Jun 2026 Conditions
  • Lands to the NW of Kiltonga Industrial Estate SW of Belfast Road and South of Milecross Road Newtownards

    Discharge of Condition 20 of previously approved application LA06/2021/1476/F which states:- Prior to the occupation of any dwelling, details of the proposed phased implementation of hard and soft landscaping works must be submitted to and agreed in writing by the Council. The hard and soft landscaping works shall be implemented in accordance with the details and timings agreed in the approved phasing plan. Phase plan to show when we plan to have landscaped areas completed

    10 Jun 2026 Conditions
  • LA06/2026/0645/DC Awaiting decision

    Lands at 21 Bridge Road South Helen's Bay

    Discharge of Condition 13 of previously approved application LA06/2022/0701/F which states: Prior to any development works commencing on site, the applicant shall submit to the Council for approval in writing an updated Contaminated Land Risk Assessment that has considered and incorporated all available site investigations, data and assessments conducted on this site, and all current and previous correspondence issued by the Environmental Health, Protection and Development Service and the Northern Ireland Environment Agency in relation to land contamination matters present on this site. Reason: In the interests of public health to ensure the site is suitable for use.