Skip to content
PlanIndex Get alerts
Menu

Planning application

LA06/2025/0734/F

23 Crawfordsburn Road, Bangor, BT19 1BG

Granted Ards and North Down Full

Proposal

Single storey rear extension

As published by the council, reference LA06/2025/0734/F

Timeline

Dates from the published record

  1. 18 Aug 2025

    Received by Ards and North Down

  2. 5 Dec 2025

    Decision issued: Granted

  3. 29 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • LA06/2026/0347/F Awaiting decision

    Lands immediately north of 14-18 Crawforsdsburn Road and immediately southeast of Carnalea Care Home, 20 Crawfordsburn Road, Bangor, BT19 1BE.

    New online stormwater storage facility comprising underground tank, with associated sewer infrastructure, including extension to existing culvert, new flow control and overflow outfall with headwall; installation of ancillary above-ground infrastructure (wash water booster, and telemetry kiosk), access road and retaining wall; boundary treatments, soft landscaping and all associated site works.

    23 Apr 2026 87m away Full applications
  • 9 Springhill Avenue, Bangor, BT20 3NT

    Single storey rear extension (amended plan)

    2 Dec 2025 207m away Full applications
  • 8 Maryville Park, Bangor, BT20 3RJ

    Single storey extension with raised patio to the rear and side dormer

    3 Oct 2025 208m away Full applications
  • 2 Innisfayle Crescent, Bangor, BT19 1DT

    Internal re-configuration with changes to windows front and rear, and increase in height of side return.

    27 Nov 2025 255m away Full applications
  • LA06/2026/0177/F Awaiting decision

    5 Crawfordsburn Lane, Carnalea, Bangor, BT19 1ZR

    Two storey side and rear extension (revised drawings)

    27 Feb 2026 257m away Full applications
  • 36 Bryansglen Park, Bangor, BT20 3RS

    Single storey rear extension, front level access and raised rear patio.

    19 Dec 2025 267m away Full applications

In Ards and North Down

  • 389 Old Holywood Road Holywood BT18 9QH

    Two-storey and single-storey extensions to front

    29 Dec 2025 Full applications
  • 9-15 Crawfords Farm Grove, Bangor, BT19 1PL

    Retention of 5 dwellings, access and parking, and erection of new dwelling (Change of house type to approval LA06/2017/0877/RM) (Amended Plans)

    13 Oct 2025 Full applications
  • Cordners, 13 Conway Square & 4 Lower Mary Street, Newtownards, BT23 4DA

    Replacement of fire damaged shop unit, raise roof level to rear of no 13, raise roof ridge level and facade alterations to no 4.

    2 Dec 2025 Full applications
  • 18a Old Seahill Road, Holywood, BT18 0EG

    Front and side extension (including front balcony, elevational changes and use of garage to habitable room)

    25 May 2026 Full applications
  • 21 Cambourne Park Newtownards BT23 4WE

    Extension of domestic curtilage and erection of fence (retrospective)

    2 Mar 2026 Full applications