Skip to content
PlanIndex Get alerts
Menu

Planning application

From the south of 237 Bangor Road on the southbound side of the A21 Bangor Road to Green Road Bangor between Breezemount Grove and Greenways Industrial Estate

Granted Ards and North Down LA06/2024/0757/DC Discharge of Condition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Discharge of condition 4 of planning approval LA06/2021/0885/F which states .... "No development activity, including ground preparation or vegetation clearance, shall take place until a full Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Council with noise/vibration and air quality mitigation / control measures specifically agreed with the Environmental Health Department.

As published by the council, reference LA06/2024/0757/DC

Application record

Reference
LA06/2024/0757/DC
Type
Discharge of Condition
Status
Determined
Decision
Granted As published: Condition Discharged
Received
3 Sep 2024
Validated
10 Sep 2024
Decided
9 Oct 2024
Ward
Glen

Timeline

Dates from the published record

  1. 3 Sep 2024

    Received by Ards and North Down

  2. 10 Sep 2024

    Validated

    Checked as complete and ready for consideration.

  3. 9 Oct 2024

    Decision issued: Condition Discharged

  4. 27 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Charles Brand Group Limited Agent, registered in Belfast

Active · incorporated 2013 · Belfast

3 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

2 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Ards and North Down granted permission on 9 October 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 105 Main Street Conlig BT23 7PT

    LA06/2026/0445/F Submitted 21 May 2026 300 yards away

    New dwelling to replace former American Diner (Route 66 - to be demolished) Amended Plans

    Granted Full applications New dwelling Demolition 34 docs
    Domestic
  • Adjacent to & North of 120 Main Street, Conlig, BT23 7PT

    LA06/2025/0653/F Submitted 25 Jul 2025 400 yards away

    Creation of memorial park, with alterations to access, introduction of gates, car park and retrospective storage container (amended description).

    Granted Full applications 29 docs
  • 1 Old Bangor Road, Newtownards, BT23 7PU

    LA06/2026/0720/F Submitted 5 Aug 2026 400 yards away

    98% historically approved · decision due ~30 Sep

    Use of land for parking of sanctuary vehicles, with two shipping containers to store food and machinery/equipment (Retrospective) with one proposed shed building (Amended description and plans) Request to vary condition 3 of previously approved LA06/2022/0508/F From -The shipping containers hereby permitted shall be removed and the land restored to its former condition within 3 years of this permission being granted. Reason: This type of temporary storage is such that its permanent retention would harm the character and amenity of the area. To -The shipping containers hereby permitted shall be removed and the land restored to its former condition within 6 years of the original permission being granted, i.e. by 25th January 2029. Reason: This type of temporary storage is such that its permanent retention would harm the character and amenity of the area.

    Awaiting decision Full applications 6 docs
    Small domestic
  • Lands immediately South of 2 Old Bangor Road, Newtownards.

    LA06/2026/0260/O Submitted 27 Mar 2026 0.3 miles away

    Two infill dwellings with associated site works.

    Granted Outline Extension 20 docs

In Ards and North Down

  • LA06/2026/0884/DC Awaiting decision

    Vacant site North of Balloo Road, West of Bangor Grammar sports pitches and to the rear of nos 1-13 Rowan Glen, Balloo Road, Bangor, BT19 7UU

    Discharge of Condiition 10 of previously approved application LA06/2022/0873/F which states - Prior to the construction of the drainage network, the applicant shall submit a Drainage Assessment, compliant with Policy FLD 3 & Annex D of PPS 15, to be agreed in writing with the Council, which demonstrates the safe management of any out of sewer flooding emanating from the surface water drainage network, agreed under Article 161 under the Water and Sewerage Services Act (Northern Ireland) 2016, in a 1 in 100 year event. Reason: In order to safeguard against surface water flood risk

    Received 25 Sep, published by the council 1 Oct 2026 Conditions
  • LA06/2026/0887/DC Awaiting decision

    Former Juvenile Justice Services Centre site (169 Rathgael Road) and surrounding lands which lie to the north of the Rathgael Road and west of the Rathgael Road/Balloo Road/Newtownards Road roundabout junction Bangor

    Discharge of Condition 9 of previously approved application LA06/2016/0596/F which states - Prior to the occupation of the proposed development, the applicant shall provide to the Council, for approval, a Verification Report. This report must demonstrate that all the measures outlined in Section 10 of the RPS report entitled Proposed Residential Development, Rathgael Road, Bangor, Remedial Strategy referenced IBR0736 and bearing the Council date stamp 17th June 2016 have been fully implemented. The Verification Report shall demonstrate the successful completion of the remediation works and that the site is now fit for end-use. It must demonstrate that the identified potential pollutant linkages are effectively broken. The Verification Report shall be in accordance with current best practice and guidance as outlined by the Environment Agency. In particular, this Verification Report must demonstrate: a) Full Details of the installation and depths of the clean cover barriers have been confirmed as per layout. b) All fuel transfer lines and all associated pipework have been traced and removed in accordance with PPG 2 Above Ground Oil Storage Tanks. All remaining soils (or base and side-walls of all excavations) have been sampled and proven suitable for the proposed end-use. c) The hotspots of heavy metal and hydrocarbon contamination have been removed by excavation to a depth of 0.5m below the depth of the exceedance. All remaining soils (or base and side-walls of all excavations) have been sampled and demonstrably proven suitable for the proposed end-use. d) All imported soil brought on to the site has been accompanied by traceability documentation and has been demonstrably proven to be suitable for the end use. Reason: In the interests of living conditions of residents of the proposed development. Remedial Verification Report

    Received 25 Sep, published by the council 1 Oct 2026 Conditions
  • LA06/2026/0879/DC Awaiting decision

    Royal Hotel and Windsor Bar, 22-28 Quay Street, Bangor, BT20 5ED

    Discharge of Condition 6 of previously approved application LA06/2021/1477/F which states - Prior to the construction of the drainage network, a Drainage Assessment, compliant with FLD 3 & Annex D of PPS 15, shall be submitted to and agreed in writing by the Council which demonstrates the safe management of any out of sewer flooding emanating from the surface water drainage network, in a 1 in 100 year event with an additional allowance for climate change. Reason: To safeguard against flood risk to the development and from the development to elsewhere. Drainage Assessment produced by Design ID ref 19053-DID-ZZ-XX-RP-0002

    Received 23 Sep, published by the council 1 Oct 2026 Conditions
  • LA06/2026/0878/DC Awaiting decision

    Royal Hotel and Windsor Bar, 22-28 Quay Street, Bangor, T20 5ED

    Discharge of Condition 5 of previously approved application LA06/2021/1477/F which states - No development shall take place on-site until the method of sewage disposal has been agreed in writing with Northern Ireland Water (NIW) or a consent to discharge has been granted under the terms of the Water (NI) Order 1999. Reason: To ensure there will be no adverse impact on the environment. NI Water agreement

    Received 23 Sep, published by the council 1 Oct 2026 Conditions
  • LA06/2026/0873/DC Awaiting decision

    Lands South of 37-77 Court Street and 1-11 Canal Row, situated within Bawn Wall and bounded by the canal, Newtowards

    Discharge of Condition 15 of previously approved application LA06/2023/2434/F which states - On completion of the remediation and prior to the occupation of any dwelling hereby approved, the applicant shall provide to the Council, for approval in writing, a Verification Report. This report shall demonstrate that the remediation measures outlined in the report titled; ‘Contaminated Land Assessment (Phase 1 PRA, Phase 2 GQRA and Outline Remediation Strategy) Lands within the Bawn Wall, Newtownards, referenced P3098-1 and dated November 2023, have been fully implemented. This report shall demonstrate the successful completion of remediation works and demonstrate that the site is now fit for end-use and include details of: • Capping system • The methodology and programme of the capping system • Photographs and records of any excavation works within the source area including photographs showing depths to accommodate the capping layer • Photographs of the clean material being used and placed on the source area, also showing depths being placed • Records and photographs showing the depth of the capping system as required • Details of the materials that were used for the capping system along with laboratory certificates and results which confirm that the materials are suitable for use. Reason: Protection of human health. VERIFICATION REPORT FOR PHASE 5 (UNITS 1-6 AND 34-41)

    Received 23 Sep, published by the council 1 Oct 2026 Conditions