Planning application
56 SILVERSTREAM DRIVE BANGOR BT20 3LW
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Single storey side & rear extension
As published by the council, reference LA06/2023/1397/F
Application record
- Reference
- LA06/2023/1397/F
- Type
- Full
- Status
- Determined
- Decision
- Granted
- Received
- 26 Jan 2023
- Validated
- 3 Feb 2023
- Decided
- 6 Apr 2023
- Ward
- Silverstream
- Postcode
- BT20 3LW
Timeline
Dates from the published record
-
26 Jan 2023
Received by Ards and North Down
-
3 Feb 2023
Validated
Checked as complete and ready for consideration.
-
6 Apr 2023
Decision issued: Granted
-
7 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice
18 applications on PlanIndex · across 2 councils · 94% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
21a Silverstream Gardens, Bangor, BT20 3LS
Two-storey side extension
Granted Full applications Extension 12 docs -
8 Silverstream Crescent, Bangor, BT20 3NF
Single-storey extension to rear
Granted Full applications Extension 10 docsSmall domestic -
Bangor Football & Athletic Club Ltd 1a Hawthorne Court, Bangor, BT20 3HR
New LED floodlight luminaires on existing masts (removal of existing fittings, and fitting 4 new LED luminaire fittings on each of the existing 8 masts)
Granted Full applications 23 docs -
Bangor Football & Athletic Club Ltd,1a Hawthorne Court, Bangor, BT20 3HR
12x Hoarding Signs (Reterospective)
Granted Advertising 5 docs -
22 Grange Avenue Bangor BT20 3QF
Demolition of garage, replacement two storey extension and single storey front porch
Granted Full applications Extension Demolition 11 docsSmall domestic
Other full applications applications
In Ards and North Down
-
LA06/2026/0644/F Granted
31 Kensington Park, Bangor, BT20 3RF
Demolition of side integral garage with single storey rear extension.
-
LA06/2026/0631/F Granted
17 Maralin Avenue, Bangor, BT20 4RQ
Single-storey side extension (facing road); enlarged rear dormer
-
LA06/2026/0493/F Granted
8 Rhanbuoy Park, Holywood, BT18 0DX
Single-storey rear extension (replacing sunroom); alteration to materials/re-tile roof; dormer to front and rear; raised patio to rear.
-
LA06/2026/0630/F Granted
10 Dromena Gardens, Newtownards, BT23 4PX
Single-storey side extension; ramped access at rear. New vehicular access
-
LA06/2026/0613/F Granted
Within curtilage of 22 Ravara Road, Ballygowan (adjacent and southwest of No.22A)
Doube garage wih gym (to replace fire-damaged stables)