Planning application
50 Belfast Road Holywood
Works: Extension Demolition Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolition of existing conservatory and provision of new single storey rear extension to existing day nursery
As published by the council, reference LA06/2021/0142/F
Application record
- Reference
- LA06/2021/0142/F
- Type
- Full
- Status
- Determined
- Decision
- Granted
- Received
- 9 Feb 2021
- Validated
- 9 Feb 2021
- Decided
- 23 Jul 2021
- Ward
- Loughview
Timeline
Dates from the published record
-
9 Feb 2021
Received by Ards and North Down
-
23 Jul 2021
Decision issued: Granted
-
27 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice registered in Holywood
6 applications on PlanIndex · across 2 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
27 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Roadside verge adjoining Jacksons Road and Belfast Road, Holywood
Sponsorship signage (Retrospective)
Granted Advertising 15 docs -
Roadside verge adjoining Belfast Road and A2 Belfast Road, Holywood
2x - Sponsorship Signage (Retrospective)
Granted Advertising 14 docs -
Small domestic
-
16 Carn End Holywood BT18 9TX
Single-storey rear extension
Granted Full applications Extension 18 docsSmall domestic -
46 Jackson's Road, Holywood, BT18 9EZ
Full-width dormer to rear;new first-floor rear windows
Granted Full applications Loft or dormer Windows or glazing 15 docs -
62 Jackson's Road, Holywood, BT18 9EZ
Roofspace conversion including rear dormer
Granted Full applications Loft or dormer 9 docs
Other full applications applications
In Ards and North Down
-
LA06/2026/0644/F Granted
31 Kensington Park, Bangor, BT20 3RF
Demolition of side integral garage with single storey rear extension.
-
LA06/2026/0631/F Granted
17 Maralin Avenue, Bangor, BT20 4RQ
Single-storey side extension (facing road); enlarged rear dormer
-
LA06/2026/0493/F Granted
8 Rhanbuoy Park, Holywood, BT18 0DX
Single-storey rear extension (replacing sunroom); alteration to materials/re-tile roof; dormer to front and rear; raised patio to rear.
-
LA06/2026/0630/F Granted
10 Dromena Gardens, Newtownards, BT23 4PX
Single-storey side extension; ramped access at rear. New vehicular access
-
LA06/2026/0613/F Granted
Within curtilage of 22 Ravara Road, Ballygowan (adjacent and southwest of No.22A)
Doube garage wih gym (to replace fire-damaged stables)