LA06/2026/0619/O Awaiting decision
Land between 34 and 36 Rubane Road, Kircubbin BT22 1AT
Dwelling & Garage
-
LA06/2026/0616/F Granted
50m SE of 84 Ballygelagh Road, Kircubbin
One and a half storey dwelling
-
LA06/2026/0613/F Granted
Within curtilage of 22 Ravara Road, Ballygowan (adjacent and southwest of No.22A)
Doube garage wih gym (to replace fire-damaged stables)
-
LA06/2026/0611/F Awaiting decision
25 Hamilton Road Bangor BT20 4LF
Change of Use from dental surgery (B1) to residential (C1)
-
LA06/2026/0610/DC Granted
Lands adjacent to and west of 7 and 8 Roseville Park, Bangor, BT19 1BY
Discharge of Condition 9 of previously approved application LA06/2022/1059/F which states:- No development shall take place on-site until the method of sewage disposal has been agreed in writing with Northern Ireland Water or a Consent to discharge has been granted under the terms of the Water (Northern Ireland) Order 1999 by the relevant authority NI Water planning consultation dated 21/4/23 stating approved with standard planning conditions
-
LA06/2026/0612/RM Granted
54 Ballybarnes Road, Newtownards, BT23 4UE
Replacement dwelling and garage
-
LA06/2026/0609/DC Awaiting decision
Lands to West of Nos. 110 & 110A-110D Movilla Road; North of Nos. 6-10 (evens) Cloverhill Park Nos 1 3 & 10 Cloverhill Crescent Nos 5 7 & 8 Deanswood Crescent Nos 12-26 (evens) Edenvale Crescent Nos 58 & 87 Stratheden Heights Nos 7 8 10 & 12 Kensington Park & Nos 2 2A & 4 Earlswood Drive; East of Nos 15-27 (odds) Cronstown Cottage Avenue; South of No 8 Cronstown Lane & North of Phase Two of "Rivenwood" Newtownards
A final Construction Environmental Management Plan (CEMP) to discharge condition 10 of previous approval LA06/2021/0061/F: A final Construction Environmental Management Plan (CEMP) shall be submitted to and agreed by the Council prior to any development activity including ground preparation or vegetation clearance. The final CEMP must identify the perceived risks to the aquatic environment, potential pollution pathways and mitigation measures to negate such risks. The final CEMP must, as a minimum, include the mitigation measures included within the outline CEMP as well as: a) Construction Method Statement(s) - including details of construction and excavation and timing of works; b) Pollution Prevention Plan – including details of a suitable buffer of 10m between the location all construction works, refuelling, storage of excavated spoil/oil/fuel/substrate/construction materials/machinery, concrete mixing and washing areas and any watercourses or any surface drains present on or adjacent to the site. c) Site Drainage Plan; including details of Sustainable Drainage Systems (SuDS), foul waste disposal, surface water disposal/treatment and silt management measures; d) Spoil Management Plan; including location of spoil storage areas outwith the 10m buffer zone, management and handling of spoil and details of the reinstatement of excavated spoil; e) Environmental Emergency Plan; including details of emergency spill procedures and regular inspections of machinery onsite; f) Water Quality Monitoring Plan; g) Details of mitigation measures to protect badgers; h) Details of the appointment of an Ecological Clerk of Works and their roles and responsibilities. The final approved CEMP shall be fully implemented and adhered to during the construction phase to the reasonable satisfaction of the Council. Reason: To ensure effective avoidance and mitigation measures have been planned for the protection of the water environment and designated sites.
-
LA06/2026/0606/F Awaiting decision
Approximately 450m SE of Florida Manor 12 - 14 Florida Road, Killinchy, BT23 6RU
Gravel hardstanding & paths and 8No. hot tubs to serve existing glamping pods previously approved under application LA06/2021/0148/F (Retrospective)
-
LA06/2026/0608/F Granted
Shelleven House, 61 Princetown Road, Bangor, BT20 3TA
Change of use and extension of guesthouse to form 1no. dwelling house and 4no. apartments, with associated ancillary works & demolition.
-
LA06/2026/0603/F Awaiting decision
Woburn House, 120 Ballywalter Road, Millisle and adjacent lands bound by Drumfad Road to the SE and Ballywalter Road to the North located to the West and SW of 26 & 27 Woburn Drive and approximately 215m NE of 25 Drumfad Road, Millisle, BT22
Refurbishment and conversion of existing Grade B2 listed Woburn House to 8no. apartments, including demolition to rear of existing building, installation of two new dormer windows to rear . Erection of 4no. dwellings to rear (SW) within new walled garden; Erection of 186no. dwellings on lands SE of Woburn House and associated car parking, works to existing site access onto A2 Ballywalter Road, landscaping, open space, playparks, wastewater pumping station, electricity substation, stabilisation of existing Fort George and all other ancillary works
-
LA06/2026/0604/F Awaiting decision
33 Cultra Avenue, Holywood, BT18 0AY
Two storey detached dwelling (accessed from Cultra Avenue)
-
LA06/2026/0600/F Granted
6a Maxwell Lane, Bangor, BT20 3RR
Retrospective change of use from 2 storey barn to dwelling, with external alterations to include rendered finish and additional fenestration (Amended Plan/Description)
-
LA06/2026/0602/F Granted
175 Church Road, Holywood, BT18 9RN
Replacement two storey detached dwelling, existing entrance maintained (Amended Plans)
- Page 1
- Page 2
Other months in 2026
- January 2026 64
- February 2026 58
- March 2026 74
- April 2026 67
- May 2026 69
- June 2026 103
- July 2026 63
- August 2026 67
- September 2026 28