Planning application
59 Upper Hightown Road, Belfast, BT14 8RR
Works: Extension
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Proposed extension of existing hard rock quarry and inert landfill on previously worked lands approximately 200m south west of existing quarry/landfill (approved by U/2014/0096/F). Proposed site operations involve quarrying of bedrock (including blasting) to a maximum depth of 260mOD and concurrent landfilling of void space created by the quarrying with inert wastes, and associated activities, with land restoration to create a sympathetic final profile across the wider site including realignment of haul roads, new site office/welfare facilities, drainage control measures and environmental monitoring systems.
As published by the council, reference LA03/2025/0436/F
Application record
- Reference
- LA03/2025/0436/F
- Type
- Full
- Status
- Consultation Open
- Received
- 24 May 2025
- Validated
- 17 Jun 2025
- Ward
- Legoniel
- Postcode
- BT14 8RR
Comment by 16 September 2026
The council is taking comments on this application until then. Comments go to Antrim and Newtownabbey through their own planning portal.
Site history
Applications at this address on the Antrim and Newtownabbey register
This site has had 2 applications since 2024.
-
LA03/2024/0819/PAN Decided
59 Upper Hightown Road, Belfast, BT14 8RR
Proposed extension of existing hard rock quarry and inert landfill on previously worked lands approximately 200m south west of existing quarry/landfill (approved by U/2014/0096/F). Proposed site operations involve quarrying of bedrock (including blasting) to a maximum depth of 260mOD and concurrent landfilling of void space created by the quarrying with inert wastes, and associated activities, with land restoration to create a sympathetic final profile across the wider site including realignment of haul roads, new site office/welfare facilities, drainage control measures and environmental monitoring systems.
Timeline
Dates from the published record
-
24 May 2025
Received by Antrim and Newtownabbey
-
17 Jun 2025
Validated
Checked as complete and ready for consideration.
-
7 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 12 August 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Antrim and Newtownabbey took a median of 79 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file
6 applications on PlanIndex · across 5 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
59 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Antrim and Newtownabbey for determination, against a statutory target of eight weeks. Over the last year Antrim and Newtownabbey decided full applications in a median of 82 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
59 Upper Hightown Road, Belfast, BT14 8RR
Proposed extension of existing hard rock quarry and inert landfill on previously worked lands approximately 200m south west of existing quarry/landfill (approved by U/2014/0096/F). Proposed site operations involve quarrying of bedrock (including blasting) to a maximum depth of 260mOD and concurrent landfilling of void space created by the quarrying with inert wastes, and associated activities, with land restoration to create a sympathetic final profile across the wider site including realignment of haul roads, new site office/welfare facilities, drainage control measures and environmental monitoring systems.
Decided Extension 2 docs
Other full applications
In Antrim and Newtownabbey
-
LA03/2026/0539/F Granted
18 Church Road, Randalstown, Antrim, BT41 3AW
Alterations and extension to existing dwelling to include a front porch, side extension and dormer windows
-
LA03/2026/0391/F Granted
Lands 20m SW of 177 Moneynick Road, Toomebridge, Antrim, BT41 3QZ
Proposed storage unit for mechanical and electrical equipment to support business needs, provision of parking and use the existing access onto the Moneynick Road
-
LA03/2026/0395/F Granted
83 Tildarg Road, KELLS, Ballymena, BT42 3NY
Domestic garage with stables
-
LA03/2026/0208/F Refused
Taylor Business Park, 17 Carnanee Road, Templepatrick, BT39 0BZ
Extension of curtilage to provide 14nr self storage container units - existing units within the business park to be re-located here
-
LA03/2025/0848/F Refused
Approx. 18m north of 1 Carntall Road, Ballyclare, (No. 1A Carntall Road), BT39 9NS
Proposed change of use/adaption of a redundant building to a single dwelling