Planning application
Land 200M North West Of William Wallace House Orchard Loan Orchardbank Business Park Forfar
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Proposed development of a clean refuelling hub for commercial vehicles (incorporating EV charging) for: full planning permission for enabling works including access, ground works, hard landscaping, lighting, levels, drainage, infrastructure and associated works; and Planning Permission in Principle for on-site structures, clean fuel pumps, clean fuel storage compounds; additional lighting; and soft landscaping
As published by the council, reference 26/00203/FULM
Application record
- Reference
- 26/00203/FULM
- Type
- Full Major Application
- Status
- Awaiting decision
- Received
- 1 Apr 2026
- Validated
- 29 Apr 2026
- Ward
- Forfar & District
- Parish
- Royal Burgh Of Forfar
Site history
Applications at this address on the Angus register
This site has had 3 applications since 2025: 1 approved, 0 refused.
-
26/00202/EIASCR Decided
Land 200M North West Of William Wallace House Orchard Loan Orchardbank Business Park Forfar
Clean refuelling hub for commercial vehicles (incorporating EV charging) for: full planning permission for enabling works including access, ground works, hard landscaping, lighting, levels, drainage, infrastructure and associated works; and Planning Permission in Principle for on-site structures, clean fuel pumps, clean fuel storage compounds; additional lighting; and soft landscaping
-
25/00655/PAN Granted
Land 200M North West Of William Wallace House Orchard Loan Orchardbank Business Park Forfar
Clean refuelling hub development including bio Compressed Natural Gas supply and an EV charging hub, with access, landscaping, drainage and associated works
Timeline
Dates from the published record
-
1 Apr 2026
Received by Angus
-
29 Apr 2026
Validated
Checked as complete and ready for consideration.
-
28 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 29 July 2026, 13 weeks from validation under the statutory target. Extensions of time are common and are agreed case by case.
Angus took a median of 66 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
- Application: 25/00655/PAN (Approved Subject to Conditions)
- Application: 26/00202/EIASCR (EIA Not Required)
Documents
The council's own list, drawings first
38 documents on file for this application
Drawings (8)
- Proposed site layout
- Proposed contour plan
- Proposed site wite utilities
- Electrical services external lighting plan
- Electrical services external lighting results
- Preliminary landscape design
- Location plan
- Existing site plan
Everything on file (34)
- ROADS - TRAFFIC
- ENVIRONMENTAL HEALTH
- MR GRAEME HAY
- NATURESCOT
- LANDSCAPE SERVICES
- ARCHAEOLOGY
- ROADS (TRAFFIC)
- SCOTTISH WATER
- TRANSPORT SCOTLAND
- NEIGHBOUR NOTIFICATION PLAN
- EMAIL ACKNOWLEDGEMENT
- DESIGN AND ACCESS STATEMENT
- AIR QUALITY ASSESSMENT
- ENERGY STATEMENT AND SUSTAINABILITY STRATEGY
- EXISTING SITE PLAN
- ELECTRICAL SERVICES EXTERNAL LIGHTING PLAN
- HISTORIC ENVIRONMENT ASSESSMENT
- LANDSCAPE AND VISUAL TECHNICAL NOTE
- INDICATIVE PLANTING SPECIFICATION
- LIGHTING REPORT
- ELECTRICAL SERVICES EXTERNAL LIGHTING RESULTS
- LOCATION PLAN
- NOISE IMPACT ASSESSMENT
- APPLICATION PDF
- PRE APPLICATION CONSULTATION REPORT
- PRELIMINARY LANDSCAPE DESIGN
- PROPOSED CONTOUR PLAN
- PROPOSED SITE LAYOUT
- PROPOSED SITE WITE UTILITIES
- TRANSPORT STATEMENT
- PHASE 2 GROUND INVESTIGATION REPORT
- APPLICATION COVERING LETTER
- DRAINAGE STRATEGY
- PRELIMINARY ECOLOGICAL APPRAISAL
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you the drawings on every job in your area. 14 days free.
What happens while it is decided
This application is with Angus for determination, against a statutory target of thirteen weeks. Over the last year Angus decided full applications in a median of 73 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land 200M North West Of William Wallace House Orchard Loan Orchardbank Business Park Forfar
Clean refuelling hub development including bio Compressed Natural Gas supply and an EV charging hub, with access, landscaping, drainage and associated works
-
St Margarets House Orchard Loan Orchardbank Business Park Forfar DD8 1WS
Advertisement of the following types : Fascia Sign
Granted Advertising 4 docs -
Forfar Loch Country Park Craig O'loch Road Forfar
Proposed installation of replacement bridge and associated works
-
The Dunnichen Stone 2 Berrymoss Lane Orchardbank Business Park Forfar DD8 1GY
Installation of three rapid electric vehicle chargers and associated electrical feeder pillar
-
Starbucks Silvie Way Orchardbank Business Park Forfar DD8 1BF
Erection of 13 signs, 11 illuminated and 2 non-illuminated
Granted Advertising 4 docs -
Land Opposite Angus House Silvie Way Orchardbank Business Park Forfar
Advertisement of the following types Various Sign Boxes, Built up letters and free standing (Totem) sign
Granted Advertising 7 docs
Other full applications
In Angus
-
26/00590/FULL Granted
Carnoustie Links Hotel Links Parade Carnoustie DD7 7JE
Proposed Installation of External Plant and Erection of Enclosure Screen
-
26/00363/FULL Granted
Ogilvy Cottage Folda Glen Isla Blairgowrie PH11 8QN
Proposed rear and side extensions to house
-
26/00526/FULL Granted
53 Arbroath Road Carnoustie DD7 6BH
Construction of single storey rear extension, alterations to garden to create new parking area to side of house. New rear fence
-
26/00520/FULL Granted
Victoria Bar 13 Catherine Street Arbroath DD11 1RL
Paint mural on external gable wall
-
26/00317/FULL Granted
Glencadam House 40 Trinity Road Brechin DD9 7RT
External alterations to outbuilding to form ancillary accommodation