Emmock & Tealing Overhead Line Tie-ins Tealing

Granted Angus 25/00564/S37 Overhead Power Line Consent

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

ECU consultation on Emmock and Tealing OHL tie-ins. The proposed development comprises the diversion of short sections of the Alyth to Tealing and Westfield to Tealing 275kv OHL. An opinion is also sought under the same submission for the installation of two short sections of parallel 275kv OHL tiebacks between the proposed Emmock substation and Tealing substation.

As published by the council, reference 25/00564/S37

Application record

Reference
25/00564/S37
Type
Overhead Power Line Consent
Status
No Objection
Decision
Granted As published: No Objection
Received
16 Oct 2025
Validated
20 Oct 2025
Decided
24 Mar 2026
Ward
Monifieth & Sidlaw
Parish
Tealing
Decision by
Delegated

Timeline

Dates from the published record

  1. 16 Oct 2025

    Received by Angus

  2. 20 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 24 Mar 2026

    Decision issued: No Objection

  4. 28 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

93 documents on file for this application

  • APP B: CONSULTATION BANNERS AND MAPS Supporting Information · 20 Oct 2025
  • APP C: PAC ADVERTS Supporting Information · 20 Oct 2025
  • APP E: CONSULTATION BOOKLET Supporting Information · 20 Oct 2025
  • APP F PART A Supporting Information · 20 Oct 2025
  • APP F PART B Supporting Information · 20 Oct 2025
  • APP F PART C Supporting Information · 20 Oct 2025
  • APP A: PAC CONSULTATION BOOKLET Supporting Information · 20 Oct 2025
  • APPENDIX B PAC REPORT Supporting Information · 20 Oct 2025
  • APPENDIX C PAC REPORT Supporting Information · 20 Oct 2025
  • APPENDIX D OF THE PAC REPORT - REDACTED Supporting Information · 20 Oct 2025
  • APPENDIX D PAC REPORT Supporting Information · 20 Oct 2025
  • APPENDIX E PAC REPORT Supporting Information · 20 Oct 2025
  • APPENDIX F PART A PAC REPORT Supporting Information · 20 Oct 2025
  • APPENDIX F PART B PAC REPORT Supporting Information · 20 Oct 2025
  • APPENDIX F PART C PAC REPORT Supporting Information · 20 Oct 2025
  • CONTENTS PAGE - VOLUME 2 Environmental Impact Assessment · 20 Oct 2025
  • CONTENTS PAGE - VOLUME 3 Environmental Impact Assessment · 20 Oct 2025
  • CONTENTS PAGE - VOLUME 4 Environmental Impact Assessment · 20 Oct 2025
  • COVER LETTER Supporting Information · 20 Oct 2025
  • EIA REPORT GLOSSARY AND ABBREVIATIONS MASTER LIST Environmental Impact Assessment · 20 Oct 2025
  • EMMOCK AND TEALING TIE-INS BNG ASSESSMENT REPORT Environmental Impact Assessment · 20 Oct 2025
  • PLANNING STATEMENT Supporting Information · 20 Oct 2025
  • LT455 EMMOCK AND TEALING OHL TIE INS_S37 PAC REPORT AUGUST 2025 UPDATED Supporting Information · 20 Oct 2025
  • TEALING TIE-INS MD-SEDD ANNEX 1 CHECKLIST Supporting Information · 20 Oct 2025
  • VOLUME 1 - NON TECHNICAL SUMMARY Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 2 - CHAPTER 1 - INTRODUCTION AND BACKGROUND Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 2 - CHAPTER 2 - ESTABLISHED NEED FOR THE PROPOSED DEVELOPMENT Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 2 - CHAPTER 3 - PROJECT DESCRIPTION Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 2 - CHAPTER 4 - CONSIDERATION OF ALTERNATIVES Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 2 - CHAPTER 5 - EIA PROCESS AND METHODOLOGY Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 2 - CHAPTER 6 - SCOPE AND CONSULTATION Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 2 - CHAPTER 7 - LANDSCAPE AND VISUAL AMENITY Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 2 - CHAPTER 8 - CULTURAL HERITAGE Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 2 - CHAPTER 9 - ORNITHOLOGY Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 2 - CHAPTER 10 - NOISE AND VIBRATION Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 2 - CHAPTER 12 - SUMMARY OF EFFECTS (1) Environmental Impact Assessment · 20 Oct 2025
  • LOCATION PLAN Drawing · 20 Oct 2025
  • VOLUME 3 - CHAPTER 3 - FIGURE 3.1 - PROPOSED DEVELOPMENT Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 3 - CHAPTER 3 - FIGURE 3.2 - TOWER DESIGN Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 3 - CHAPTER 3 - FIGURE 3.3 - TYP... TRACK CROSS SECTIONS (INDICATIVE) Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 3 - CHAPTER 3 - FIGURE 3.4 - TYPICAL BELLMOUTH LAYOUT (INDICATIVE) Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 3 - CHAPTER 3 - FIGURE 3.5 - INDICATIVE PUBLIC ROAD IMPROVEMENT WORKS Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 3 - CHAPTER 3 - FIGURE 3.5 - INDICATIVE PUBLIC ROAD IMPROVEMENT WORKS Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 3 - CHAPTER 3 - FIGURE 3.6 - TYP...RSE CROSSING SECTIONS (INDICATIVE) Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 3 - CHAPTER 5 - FIGURE 5.1 - CUMULATIVE DEVELOPMENTS (1) Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 3 - CHAPTER 7 - FIGURE 7.1 - LAN...ISUAL IMPACT ASSESSMENT STUDY AREA Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 3 - CHAPTER 7 - FIGURE 7.2 - VIS...CATIONS AND OTHER VISUAL RECEPTORS Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 3 - CHAPTER 7 - FIGURE 7.3A - LANDSCAPE CHARACTER TYPES Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 3 - CHAPTER 7 - FIGURE 7.3B - LA...NE OF THEORETICAL VISIBILITY (ZTV) Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 3 - CHAPTER 7 - FIGURE 7.4A - DESIGNATED LANDSCAPES Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 3 - CHAPTER 7 - FIGURE 7.4B - DE...NE OF THEORETICAL VISIBILITY (ZTV) Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 3 - CHAPTER 7 - FIGURE 7.5 - VIE... CLAVERHOUSE, SOUTHWEST OF TEALING Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 3 - CHAPTER 7 - FIGURE 7.6 - VIE...R NEWLANDHEAD AND NORTH BALLUDERON Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 3 - CHAPTER 7 - FIGURE 7.7 - VIEWPOINT 3 CAIRNS, BALKELLO HILL Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 3 - CHAPTER 7 - FIGURE A7.4.1 - ...ROPERTIES INCLUDED WITHIN THE RVAA Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 3 - CHAPTER 7 - FIGURES A7.4.2 TO A7.4.4 - WIRELINES Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 3 - CHAPTER 8 - FIGURE 8.1 - CULTURAL HERITAGE INNER STUDY AREA Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 3 - CHAPTER 8 - FIGURE 8.2 - CULTURAL HERITAGE OUTER STUDY AREA Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 3 - CHAPTER 8 - FIGURE 8.3 - CUL...K COTTAGES, STONE CIRCLE (SM 2868) Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 3 - CHAPTER 9 - FIGURE 9.1 - THE...NT AND ORNITHOLOGY SURVEY AREA (1) Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 3 - CHAPTER 9 - FIGURE 9.2 - ORN...ED SITES WITHIN 20 KM AND 5 KM (1) Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 3 - CHAPTER 9 - FIGURE 9.4 - WINTER GOOSE FORAGING SURVEYS (1) Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 4 - APPENDIX 3.2 - GENERAL ENVIR...AND SPECIES PROTECTED PLANS (SPPS) Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 4 - APPENDIX 3.3 - OUTLINE SITE RESTORATION PLAN Supporting Information · 20 Oct 2025
  • VOLUME 4 - APPENDIX 3.4 - OUTLINE CONST...ENVIRONMENT MANAGEMENT PLAN (CEMP) Supporting Information · 20 Oct 2025
  • VOLUME 4 - APPENDIX 3.6 - OUTLINE DECOMMISSIONING MITIGATION STRATEGY Supporting Information · 20 Oct 2025
  • VOLUME 4 - APPENDIX 3.7 - OUTLINE OUTDOOR ACCESS MANAGEMENT PLAN Supporting Information · 20 Oct 2025
  • VOLUME 4 - APPENDIX 3.8 - OUTLINE CONSTRUCTION TRAFFIC MANAGEMENT PLAN Supporting Information · 20 Oct 2025
  • VOLUME 4 - APPENDIX 6.2 - SCOPING OPINION Supporting Information · 20 Oct 2025
  • VOLUME 4 - APPENDIX 6.4 - PRIVATE WATER...ROUNDWATER ABSTRACTIONS ASSESSMENT Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 4 - APPENDIX 7.1 - LVIA AND VIS METHOD Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 4 - APPENDIX 8.3 - DESIGNATED AS...THIN URBAN SETTINGS AND TOWNSCAPES Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 4 - APPENDIX 8.4 - BALKEMBACK STONE CIRCLE TECHNICAL CONSTRAINTS Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 4 - APPENDIX 9.1 - ORNITHOLOGY TECHNICAL REPORT Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 4 - APPENDIX 10.3 - CONSTRUCTION NOISE IMPACT ASSESSMENT Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 4 - APPENDIX 6.1 - SCOPING AND SCREENING REPORT_REDACTED 1 OF 2 Supporting Information · 20 Oct 2025
  • VOLUME 4 - APPENDIX 6.1 - SCOPING AND SCREENING REPORT_REDACTED 2 OF 2 Supporting Information · 20 Oct 2025
  • APPENDIX A PAC REPORT Supporting Information · 20 Oct 2025
  • VOLUME 2 - CHAPTER 11 - CUMULATIVE EFFECTS Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 4 - APPENDIX 10.1 - NOISE SENSITIVE RECEPTORS Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 4 - APPENDIX 10.2 - CONSTRUCTION ACTIVITIES Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 4 - APPENDIX 10.4 - OPERATIONAL NOISE IMPACT ASSESSMENT Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 4 - APPENDIX 3.1 - TOWER SCHEDULE Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 4 - APPENDIX 3.5 - INDICATIVE PUBLIC ROAD IMPROVEMENT WORKS Supporting Information · 20 Oct 2025
  • VOLUME 4 - APPENDIX 5.1 - THE EIA TEAM Supporting Information · 20 Oct 2025
  • VOLUME 4 - APPENDIX 6.3 - CONSULTATION MATRIX Supporting Information · 20 Oct 2025
  • VOLUME 4 - APPENDIX 7.2 - LANDSCAPE ASSESSMENT Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 4 - APPENDIX 7.3 - VISUAL ASSESSMENT Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 4 - APPENDIX 7.4 - RESIDENTIAL VISUAL AMENITY ASSESSMENT Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 4 - APPENDIX 7.5 - CUMULATIVE LVIA Supporting Information · 20 Oct 2025
  • VOLUME 4 - APPENDIX 8.1 - CULTURAL HERITAGE ASSETS WITHIN INNER STUDY AREA Supporting Information · 20 Oct 2025
  • VOLUME 4 - APPENDIX 8.2 - CULTURAL HERITAGE ASSETS WITHIN OUTERSTUDY AREA Environmental Impact Assessment · 20 Oct 2025
  • VOLUME 4 - APPENDIX 8.4 - BALKEMBACK STONE CIRCLE MITIGATION STRATEGY Environmental Impact Assessment · 20 Oct 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Angus granted permission on 24 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About less common application types

This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.

In Angus

  • 25/00374/HAZ Granted

    Drambond Sir William Smith Road Kirkton Industrial Estate Arbroath DD11 3RD

    Use of warehouse for storage of whisky casks

    Received 3 Jul, published by the council 22 Aug 2026 Other
  • 25/00512/S37 Granted

    New Substation At Emmock Near Tealing And An Existing Substation At Kintore Aberdeenshire

    Operate and keep installed approximately 105.2 kilometre (km) 400 kV Overhead Line (OHL), supported on steel lattice tower structures including downleads, between a proposed new substation named Emmock near to Tealing in Angus and an existing substation at Kintore, Aberdeenshire

    Received 19 Sep, published by the council 28 Jul 2026 Other
  • 24/00598/S37 Granted

    Field 490M North East Of Airlie Lodge Cortachy Kirriemuir

    Relocation of 1 x Pole, Installation of 4 x Poles, Removal of 4 x Poles and Realignment of 11kV Overhead Line and Ancillary Works (Retrospective)

    Received 18 Jun, published by the council 1 Sep 2026 Other