Proposal
ECU consultation on Emmock and Tealing OHL tie-ins. The proposed development comprises the diversion of short sections of the Alyth to Tealing and Westfield to Tealing 275kv OHL. An opinion is also sought under the same submission for the installation of two short sections of parallel 275kv OHL tiebacks between the proposed Emmock substation and Tealing substation.
As published by the council, reference 25/00564/S37
Application record
- Reference
- 25/00564/S37
- Type
- Overhead Power Line Consent
- Status
- No Objection
- Decision
- Granted As published: No Objection
- Received
- 16 Oct 2025
- Validated
- 20 Oct 2025
- Decided
- 24 Mar 2026
- Ward
- Monifieth & Sidlaw
- Parish
- Tealing
- Decision by
- Delegated
Timeline
Dates from the published record
-
16 Oct 2025
Received by Angus
-
20 Oct 2025
Validated
Checked as complete and ready for consideration.
-
24 Mar 2026
Decision issued: No Objection
-
28 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
93 documents on file for this application
- APP B: CONSULTATION BANNERS AND MAPS
- APP C: PAC ADVERTS
- APP E: CONSULTATION BOOKLET
- APP F PART A
- APP F PART B
- APP F PART C
- APP A: PAC CONSULTATION BOOKLET
- APPENDIX B PAC REPORT
- APPENDIX C PAC REPORT
- APPENDIX D OF THE PAC REPORT - REDACTED
- APPENDIX D PAC REPORT
- APPENDIX E PAC REPORT
- APPENDIX F PART A PAC REPORT
- APPENDIX F PART B PAC REPORT
- APPENDIX F PART C PAC REPORT
- CONTENTS PAGE - VOLUME 2
- CONTENTS PAGE - VOLUME 3
- CONTENTS PAGE - VOLUME 4
- COVER LETTER
- EIA REPORT GLOSSARY AND ABBREVIATIONS MASTER LIST
- EMMOCK AND TEALING TIE-INS BNG ASSESSMENT REPORT
- PLANNING STATEMENT
- LT455 EMMOCK AND TEALING OHL TIE INS_S37 PAC REPORT AUGUST 2025 UPDATED
- TEALING TIE-INS MD-SEDD ANNEX 1 CHECKLIST
- VOLUME 1 - NON TECHNICAL SUMMARY
- VOLUME 2 - CHAPTER 1 - INTRODUCTION AND BACKGROUND
- VOLUME 2 - CHAPTER 2 - ESTABLISHED NEED FOR THE PROPOSED DEVELOPMENT
- VOLUME 2 - CHAPTER 3 - PROJECT DESCRIPTION
- VOLUME 2 - CHAPTER 4 - CONSIDERATION OF ALTERNATIVES
- VOLUME 2 - CHAPTER 5 - EIA PROCESS AND METHODOLOGY
- VOLUME 2 - CHAPTER 6 - SCOPE AND CONSULTATION
- VOLUME 2 - CHAPTER 7 - LANDSCAPE AND VISUAL AMENITY
- VOLUME 2 - CHAPTER 8 - CULTURAL HERITAGE
- VOLUME 2 - CHAPTER 9 - ORNITHOLOGY
- VOLUME 2 - CHAPTER 10 - NOISE AND VIBRATION
- VOLUME 2 - CHAPTER 12 - SUMMARY OF EFFECTS (1)
- LOCATION PLAN
- VOLUME 3 - CHAPTER 3 - FIGURE 3.1 - PROPOSED DEVELOPMENT
- VOLUME 3 - CHAPTER 3 - FIGURE 3.2 - TOWER DESIGN
- VOLUME 3 - CHAPTER 3 - FIGURE 3.3 - TYP... TRACK CROSS SECTIONS (INDICATIVE)
- VOLUME 3 - CHAPTER 3 - FIGURE 3.4 - TYPICAL BELLMOUTH LAYOUT (INDICATIVE)
- VOLUME 3 - CHAPTER 3 - FIGURE 3.5 - INDICATIVE PUBLIC ROAD IMPROVEMENT WORKS
- VOLUME 3 - CHAPTER 3 - FIGURE 3.5 - INDICATIVE PUBLIC ROAD IMPROVEMENT WORKS
- VOLUME 3 - CHAPTER 3 - FIGURE 3.6 - TYP...RSE CROSSING SECTIONS (INDICATIVE)
- VOLUME 3 - CHAPTER 5 - FIGURE 5.1 - CUMULATIVE DEVELOPMENTS (1)
- VOLUME 3 - CHAPTER 7 - FIGURE 7.1 - LAN...ISUAL IMPACT ASSESSMENT STUDY AREA
- VOLUME 3 - CHAPTER 7 - FIGURE 7.2 - VIS...CATIONS AND OTHER VISUAL RECEPTORS
- VOLUME 3 - CHAPTER 7 - FIGURE 7.3A - LANDSCAPE CHARACTER TYPES
- VOLUME 3 - CHAPTER 7 - FIGURE 7.3B - LA...NE OF THEORETICAL VISIBILITY (ZTV)
- VOLUME 3 - CHAPTER 7 - FIGURE 7.4A - DESIGNATED LANDSCAPES
- VOLUME 3 - CHAPTER 7 - FIGURE 7.4B - DE...NE OF THEORETICAL VISIBILITY (ZTV)
- VOLUME 3 - CHAPTER 7 - FIGURE 7.5 - VIE... CLAVERHOUSE, SOUTHWEST OF TEALING
- VOLUME 3 - CHAPTER 7 - FIGURE 7.6 - VIE...R NEWLANDHEAD AND NORTH BALLUDERON
- VOLUME 3 - CHAPTER 7 - FIGURE 7.7 - VIEWPOINT 3 CAIRNS, BALKELLO HILL
- VOLUME 3 - CHAPTER 7 - FIGURE A7.4.1 - ...ROPERTIES INCLUDED WITHIN THE RVAA
- VOLUME 3 - CHAPTER 7 - FIGURES A7.4.2 TO A7.4.4 - WIRELINES
- VOLUME 3 - CHAPTER 8 - FIGURE 8.1 - CULTURAL HERITAGE INNER STUDY AREA
- VOLUME 3 - CHAPTER 8 - FIGURE 8.2 - CULTURAL HERITAGE OUTER STUDY AREA
- VOLUME 3 - CHAPTER 8 - FIGURE 8.3 - CUL...K COTTAGES, STONE CIRCLE (SM 2868)
- VOLUME 3 - CHAPTER 9 - FIGURE 9.1 - THE...NT AND ORNITHOLOGY SURVEY AREA (1)
- VOLUME 3 - CHAPTER 9 - FIGURE 9.2 - ORN...ED SITES WITHIN 20 KM AND 5 KM (1)
- VOLUME 3 - CHAPTER 9 - FIGURE 9.4 - WINTER GOOSE FORAGING SURVEYS (1)
- VOLUME 4 - APPENDIX 3.2 - GENERAL ENVIR...AND SPECIES PROTECTED PLANS (SPPS)
- VOLUME 4 - APPENDIX 3.3 - OUTLINE SITE RESTORATION PLAN
- VOLUME 4 - APPENDIX 3.4 - OUTLINE CONST...ENVIRONMENT MANAGEMENT PLAN (CEMP)
- VOLUME 4 - APPENDIX 3.6 - OUTLINE DECOMMISSIONING MITIGATION STRATEGY
- VOLUME 4 - APPENDIX 3.7 - OUTLINE OUTDOOR ACCESS MANAGEMENT PLAN
- VOLUME 4 - APPENDIX 3.8 - OUTLINE CONSTRUCTION TRAFFIC MANAGEMENT PLAN
- VOLUME 4 - APPENDIX 6.2 - SCOPING OPINION
- VOLUME 4 - APPENDIX 6.4 - PRIVATE WATER...ROUNDWATER ABSTRACTIONS ASSESSMENT
- VOLUME 4 - APPENDIX 7.1 - LVIA AND VIS METHOD
- VOLUME 4 - APPENDIX 8.3 - DESIGNATED AS...THIN URBAN SETTINGS AND TOWNSCAPES
- VOLUME 4 - APPENDIX 8.4 - BALKEMBACK STONE CIRCLE TECHNICAL CONSTRAINTS
- VOLUME 4 - APPENDIX 9.1 - ORNITHOLOGY TECHNICAL REPORT
- VOLUME 4 - APPENDIX 10.3 - CONSTRUCTION NOISE IMPACT ASSESSMENT
- VOLUME 4 - APPENDIX 6.1 - SCOPING AND SCREENING REPORT_REDACTED 1 OF 2
- VOLUME 4 - APPENDIX 6.1 - SCOPING AND SCREENING REPORT_REDACTED 2 OF 2
- APPENDIX A PAC REPORT
- VOLUME 2 - CHAPTER 11 - CUMULATIVE EFFECTS
- VOLUME 4 - APPENDIX 10.1 - NOISE SENSITIVE RECEPTORS
- VOLUME 4 - APPENDIX 10.2 - CONSTRUCTION ACTIVITIES
- VOLUME 4 - APPENDIX 10.4 - OPERATIONAL NOISE IMPACT ASSESSMENT
- VOLUME 4 - APPENDIX 3.1 - TOWER SCHEDULE
- VOLUME 4 - APPENDIX 3.5 - INDICATIVE PUBLIC ROAD IMPROVEMENT WORKS
- VOLUME 4 - APPENDIX 5.1 - THE EIA TEAM
- VOLUME 4 - APPENDIX 6.3 - CONSULTATION MATRIX
- VOLUME 4 - APPENDIX 7.2 - LANDSCAPE ASSESSMENT
- VOLUME 4 - APPENDIX 7.3 - VISUAL ASSESSMENT
- VOLUME 4 - APPENDIX 7.4 - RESIDENTIAL VISUAL AMENITY ASSESSMENT
- VOLUME 4 - APPENDIX 7.5 - CUMULATIVE LVIA
- VOLUME 4 - APPENDIX 8.1 - CULTURAL HERITAGE ASSETS WITHIN INNER STUDY AREA
- VOLUME 4 - APPENDIX 8.2 - CULTURAL HERITAGE ASSETS WITHIN OUTERSTUDY AREA
- VOLUME 4 - APPENDIX 8.4 - BALKEMBACK STONE CIRCLE MITIGATION STRATEGY
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Angus granted permission on 24 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About less common application types
This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.
Other less common application types
In Angus
-
25/00374/HAZ Granted
Drambond Sir William Smith Road Kirkton Industrial Estate Arbroath DD11 3RD
Use of warehouse for storage of whisky casks
-
25/00512/S37 Granted
New Substation At Emmock Near Tealing And An Existing Substation At Kintore Aberdeenshire
Operate and keep installed approximately 105.2 kilometre (km) 400 kV Overhead Line (OHL), supported on steel lattice tower structures including downleads, between a proposed new substation named Emmock near to Tealing in Angus and an existing substation at Kintore, Aberdeenshire
-
24/00598/S37 Granted
Field 490M North East Of Airlie Lodge Cortachy Kirriemuir
Relocation of 1 x Pole, Installation of 4 x Poles, Removal of 4 x Poles and Realignment of 11kV Overhead Line and Ancillary Works (Retrospective)