Planning application

New Substation At Emmock Near Tealing And An Existing Substation At Kintore Aberdeenshire

Granted Angus 25/00512/S37 Overhead Power Line Consent

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Operate and keep installed approximately 105.2 kilometre (km) 400 kV Overhead Line (OHL), supported on steel lattice tower structures including downleads, between a proposed new substation named Emmock near to Tealing in Angus and an existing substation at Kintore, Aberdeenshire

As published by the council, reference 25/00512/S37

Application record

Reference
25/00512/S37
Type
Overhead Power Line Consent
Status
Awaiting decision
Decision
Granted As published: Permitted
Received
19 Sep 2025
Validated
19 Sep 2025
Decided
19 Nov 2025
Ward
Monifieth & Sidlaw
Parish
Tealing

Timeline

Dates from the published record

  1. 19 Sep 2025

    Received by Angus

  2. 19 Nov 2025

    Decision issued: Permitted

  3. 28 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

325 documents on file for this application

  • OBJECTION LETTER Decision Notice · 19 Nov 2025
  • VOLUME 5 - CHAPTER 6 APPENDIX 6.1 SCOPING REPORT P1 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - CHAPTER 6 APPENDIX 6.1 SCOPING REPORT P2 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - CHAPTER 6 APPENDIX 6.1 SCOPING REPORT P3 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - CHAPTER 6 APPENDIX 6.1 SCOPING REPORT P4 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - CHAPTER 6 APPENDIX 6.1 SCOPING REPORT P5 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - CHAPTER 6 APPENDIX 6.1 SCOPING REPORT P6 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - CHAPTER 6 APPENDIX 6.1 SCOPING REPORT P7 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - CHAPTER 6 APPENDIX 6.1 SCOPING REPORT P8 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - CHAPTER 6 APPENDIX 6.1 SCOPING REPORT P9 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - CHAPTER 6 APPENDIX 6.1 SCOPING REPORT P10 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - CHAPTER 6 APPENDIX 6.1 SCOPING REPORT P11 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - CHAPTER 6 APPENDIX 6.1 SCOPING REPORT P12 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - CHAPTER 6 APPENDIX 6.1 SCOPING REPORT P13 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - CHAPTER 6 APPENDIX 6.1 SCOPING REPORT P14 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - CHAPTER 6 APPENDIX 6.1 SCOPING REPORT P15 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - CHAPTER 6 APPENDIX 6.1 SCOPING REPORT P16 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - CHAPTER 6 APPENDIX 6.2 SCOPING REPORT P1 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - CHAPTER 6 APPENDIX 6.2 SCOPING REPORT P2 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - CHAPTER 6 APPENDIX 6.3 CONSULTATION MATRIX Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - CHAPTER 6 APPENDIX 6.4 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - CHAPTER 6 APPENDIX 6.4 GATE CHECK P2 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - CHAPTER 6 APPENDIX 6.4 GATE CHECK P3 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - CHAPTER 6 APPENDIX 6.4 GATE CHECK P4 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - CHAPTER 6 APPENDIX 6.4 GATE CHECK P5 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - CHAPTER 6 APPENDIX 6.5 PCEA Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 7.1 OUTLINE OUTDOOR ACCESS MANAGEMENT PLAN Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 7.2 AVIATION IMPACT ASSESSMENT Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.1 COMPENSATORY PLANTING MANAGEMENT STRATEGY Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.1 BALKEMBACK FARM Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.10 DURRIS CHURCH WOODLAND Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.11 SMALL WOODLANDS RESORT Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.12 LOCHTY WOOD Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.13 DUNS WOOD Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.14 QUARTAINS WOODLAND Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.15 COLDSTREAM PLANTATION Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.16 BOGGIE WOOD Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.17 KING'S SEAT WOOD Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.18 DRUM HILL Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.19 BALROWNIE Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.2 LADY JANE'S PLANTATION Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.20 DEN WOOD Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.21 JUSTINHAUGH Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.22 RICKARTON ESTATE Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.23 KINTORE GARAGE WOODS Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.24 WOOD OF REDHALL Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.25 INVERISCANDYE WOOD Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.27 SOUTH KIRKTON WOOD AND MARKETMUIR WOOD Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.26 NORTH KIRKTON WOOD Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.28 BOGGENDINNIE, CORSKIE WOOD AND KINNERNIE BURN WOOD Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.29 NETHERPARK QUARRY WOODLAND Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.3 INCHES, BURN OF GUINEA WOOD, BURNHEAD WOODLAND Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.30 FETTERESSO Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.31 CAPO PLANTATION Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.32 DURRIS Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.33 FREE CHURCH WOOD Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.34 INVERURY FOREST Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.4 LOCH OF PARK Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.5 WESTER LETTER FOREST Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.6 BELLIEHILL WOOD Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.7 FORESTMUIR WOOD Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.8 BALLINSHOE WOOD Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.2.9 TILLYBRIGG, TILLYFODDIE, SCAUR, CULFOSIE, BARMEKIN AND Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 8.3 NATIVE BROADLEAFED WOODLAND MANAGEMENT STRATEGY Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 9.1 LANDSCAPE ASSESSMENT Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 9.2 VISUAL ASSESSMENT Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 9.3 RESIDENTIAL VISUAL AMENITY ASSESSMENT Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 9.4 CUMULATIVE LANDSCAPE AND VISUAL ASSESSMENT Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 9.5 LVIA AND VISUALISATIONS METHOD Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 9.6 OUTLINE LANDSCAPE MITIGATION DESIGN GUIDE P1 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 9.6 OUTLINE LANDSCAPE MITIGATION DESIGN GUIDE P2 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 9.6 OUTLINE LANDSCAPE MITIGATION DESIGN GUIDE P3 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 9.6 OUTLINE LANDSCAPE MITIGATION DESIGN GUIDE P4 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 9.6 OUTLINE LANDSCAPE MITIGATION DESIGN GUIDE P5 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 9.6 OUTLINE LANDSCAPE MITIGATION DESIGN GUIDE P6 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 9.6 OUTLINE LANDSCAPE MITIGATION DESIGN GUIDE P7 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 9.6 OUTLINE LANDSCAPE MITIGATION DESIGN GUIDE P8 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 9.6 OUTLINE LANDSCAPE MITIGATION DESIGN GUIDE P9 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 9.6 OUTLINE LANDSCAPE MITIGATION DESIGN GUIDE P10 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 10.1 BASELINE CHARACTERISATION METHODOLGY Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 10.10 DETAILED ASSESSMENT OF DESIGNATED HERITAGE ASSETS IN O Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 10.11 DETAILED ASSESSMENT OF DESIGNATED HERITAGE ASSETS IN O Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 10.12 STONE CIRCLES MITIGATION RESPONSE Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 10.2 CULTURAL HERITAGE CONSULTATION RESPONSES Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 10.3 CULTURAL HERITAGE VIEWPOINT INFORMATION Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 10.4 CULTURAL HERITAGE BASELINE CONDITIONS Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 10.5 CULTURAL HERITAGE ASSETS WITHIN THE INNER STUDY AREA Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 10.6 INNER STUDY AREA PREDICTED EFFECTS Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 10.7 DESIGNATED HERITAGE ASSETS IN OUTER STUDY AREA Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 10.8 LISTED BUILDINGS IN CONSERVATION AREAS AND TOWNSCAPES Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 10.9 DESIGNATED HERITAGE ASSETS OUTWITH THE OUTER STUDY AREA Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 11.1 DESK STUDY AND LEGAL CONTEXT Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 11.2 HABITAT AND VEGETATION SURVEY REPORT Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 11.3 PROTECTED SPECIES SURVEY REPORT Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 11.4 BAT SURVEY REPORT Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 11.5 OUTLINE BIODIVERSITY ENHANCEMENT PLAN Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 12.1 ORNITHOLOGY TECHNICAL REPORT Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 14.1 TRANSPORT ASSESSMENT P1 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 14.1 TRANSPORT ASSESSMENT P2 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 14.1 TRANSPORT ASSESSMENT P3 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 14.1 TRANSPORT ASSESSMENT P4 Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 15.1 NOISE SENSITIVE RECEPTORS (NSRS) Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 15.2 CONSTRUCTION ACTIVITY Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 15.3 CONSTRUCTION NOISE IMPACT ASSESSMENT Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 5 - APPENDIX 15.4 OPERATIONAL NOISE IMPACT ASSESSMENT Environmental Impact Assessment · 29 Sep 2025
  • VOLUME 4 - COVER AND CONTENTS PAGE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 1 MYRETON OF CLAVERHOUSE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 2 NORTH OF BALNUITH Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT3 CAIRNS BALKELLO HILL Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 4 NEAR LUMLEY DEN Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 5 MILTON OF OGILVIE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 6 DOUGLASTOWN Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 7 MAINS OF GLAMIS Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 8 BALMASHANNER HILL Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 9 PADANARAM Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 10 NEAR KIRRIEMUIR Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 11 A90 NEAR BASE OF CARSE HILL Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 12 B957 NEAR CAIRNHILL Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 13 TANNADICE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 14 ANGUS HILL LAYBY B9134 Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 15 MINOR ROAD EAST OF CARESTON Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 16 BALHALL CRESCENT Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 17 WESTERN EDGE OF LITTLE BRECHIN Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 18 WHITE CATERTHUN Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 19 INCHBARE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 20 INVERISCANDYE ROAD SOUTHEASTERN EDGE OF EDZELL Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 21 HILL OF GARVOCK Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 22 B9120 WESTERN EDGE OF LAURENCEKIRK Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 23 MINOR ROAD WEST OF MAINS OF BALNAKETTLE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 24 MINOR ROAD NORTHWEST OF FORDOUN Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 25 FOOTPATH OF HILL VIEW ROAD AUCHENBLAE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 26 GLENBERVIE ROAD WEST OF GLENBERVIE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 27 MINOR ROAD NEAR JACKSBANK Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 28 NETHER WYNDINGS Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 29 SLUG ROAD (A957) WEST OF ROADSIDE COTTAGE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 30 DURRIS BRIDGE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 31 COUPER'S ROAD Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 32 DRUM CASTLE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 33 LITTLE EDDIESTON Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 34 MEIKLE TAP Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 35 FOOTPATH NORTH OF ECHT Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 36 BARMEKIN HILL Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 37 DUNECHT NEAR THE PRIMARY SCHOOL Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINT 38 NORTH LEYLODGE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 FIGURE A9 3.74 Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 FIGURE A9 3.10 Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 FIGURE A9 3.17 Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 FIGURE A9 3.23 Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 FIGURE A9 3.29 Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 FIGURE A9 3.2 Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 FIGURE A9 3.34 Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 FIGURE A9 3.40 Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 FIGURE A9 3.46 Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 FIGURE A9 3.50 Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 FIGURE A9 3.56 Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 FIGURE A9 3.62 Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 FIGURE A9 3.69 Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 FIGURE A9 3.70 Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH1 CRAIG HILL, FORT AND BROCH Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH2 BALKEMBACK COTTAGES STONE CIRCLE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH3 CARLUNIE HILL CAIRN Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH4 ARNIEFOUL CAIRN Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH5 GLAMIS CASTLE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH6 GLAMIS CASTLE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH7 ST ORLANDS STONE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH8 ST ORLANDS STONE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH9 BALLINSHOE CASTLE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH10 BATTLEDYKES CAIRN Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH11 LAW OF BALDOUKIE, BARROW Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH12 FINAVON FORT Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH13 LAW OF WINDSOR CAIRN Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH14 CARESTON CASTLE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH15 STRACATHRO HOSPITAL Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH16 STRACATHRO ROMAN CAMP Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH17 WITCH HILLOCK BURIAL MOUND Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH18 BALBEGNO CASTLE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH19 PHESDO HOUSE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH20 GLENBERVIE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH21 GLENBERVIE HOUSE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH22 DROOP HILL Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH23 CAIRN O MOUNT CAIRNS Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH24 RAEDYKES ROMAN CAMP Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH25 CAIRN-MON-EARN-CAIRN Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH26 PARK HOUSE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH27 PARK HOUSE (IN FRONT OF HOUSE) Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH28 PARK HOUSE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH29 NORMANDYKES ROMAN CAMP Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH30 DRUM CASTLE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH31 TILLYORN MOATED HOMESTEAD Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH32 EAST FINNERCY CAIRN Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH33 DUNECHT HOUSE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH34 DUNECHT HOUSE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH35 BARMEKIN HILL Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH36 NEW WESTER ECHT STONE CIRCLE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH37 UPPER CORSKIE STONE CIRCLE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH38 GLACK CAIRN Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH39 SOUTH FORNET Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 4 - CHAPTER 9 VIEWPOINTCH40 SOUTH LEYLODGE STEADING Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 5 - COVER AND CONTENTS PAGE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 5 - CHAPTER 3 APPENDIX 3.1 TOWER SCHEDULE Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 5 - CHAPTER 3 APPENDIX 3.2 (GEMP Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 5 - CHAPTER 3 APPENDIX 3.3 OUTLINE SITE RESTORATION PLAN Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 5 - CHAPTER 3 APPENDIX 3.4 OUTLINE CEMP Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 5 - CHAPTER 3 APPENDIX 3.5 PUBLIC ROAD IMPROVEMENT WORKS Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 5 - CHAPTER 3 APPENDIX 3.6 OUTLINE DECOMMISSIONING MITIGATION STRATEGY Environmental Impact Assessment · 25 Sep 2025
  • VOLUME 5 - CHAPTER 5 APPENDIX 5.1 THE EIA TEAM Environmental Impact Assessment · 25 Sep 2025
  • PLANNING STATEMENT Supporting Information · 22 Sep 2025
  • SOCIO-ECONOMIC ASSESSMENT Supporting Information · 22 Sep 2025
  • NON-TECHNICAL SUMMARY Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 1 - CONTENTS PAGE Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 1 - CHAPTER 1 INTRODUCTION AND BACKGROUND Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 1 - CHAPTER 2 ESTABLISHED NEED FOR PROPOSED DEVELOPMENT Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 1 - CHAPTER 3 PROJECT DESCRIPTION Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 1 - CHAPTER 4 ALTERNATIVES AND THE ROUTEING PROCESS Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 1 - CHAPTER 5 EIA PROCESS AND METHODOLOGY Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 1 - CHAPTER 6 SCOPE AND CONSULTATION Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 2 - COVER AND CONTENTS PAGE Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 2 - CHAPTER 7 LAND USE AND PRIME AGRICULTURAL LAND Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 2 - CHAPTER 8 FORESTRY Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 2 - CHAPTER 9 LANDSCAPE AND VISUAL AMENITY Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 2 - CHAPTER 10 CULTURAL HERITAGE Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 2 - CHAPTER 11 ECOLOGY Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 2 - CHAPTER 12 ORNITHOLOGY Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 2 - CHAPTER 13 HYDROLOGY, HYDROGEOLOGY, GEOLOGY AND SOILS Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 2 - CHAPTER 14 TRAFFIC AND TRANSPORT Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 2 - CHAPTER 15 NOISE AND VIBRATION Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 2 - CHAPTER 16 CUMULATIVE EFFECTS Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 2 - CHAPTER 17 SCHEDULE OF MITIGATION Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 2 - CHAPTER 18 SUMMARY OF SIGNIFICANT EFFECTS Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CONTENTS PAGE Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 1 FIGURE 1.1 OVERVIEW OF THE PROPOSED DEVELOPMENT Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 3 FIGURE 3.2 OVERVIEW OF THE PROPOSED DEVELOPMENT Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 3 FIGURE 3.5A INDICATIVE CABLE SEALING END COMPOUN Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 3 FIGURE 3.7 TYPICAL BELLMOUTH LAYOUT INDICATIVE Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 3 FIGURE 3.10 TYPICAL WATERCOURSE AND GAS MAIN CRO Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 3 FIGURE 3.3.1 TO 3.3.29 OVERVIEW OF THE LOD VARIA Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 3 FIGURE 3.3.1 TO 3.3.29 OVERVIEW OF THE LOD VARIA Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 3 FIGURE 3.4.1 TOWER DESIGN Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 3 FIGURE 3.6.1 TYPICAL ACCESS TRACK CROSS SECTIONS Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 3 FIGURE 3.8.1 INDICATIVE PUBLIC ROAD IMPROVEMENT Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 3 FIGURE 3.8.1 INDICATIVE PUBLIC ROAD IMPROVEMENT Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 3 FIGURE 3.9.1 PASSING PLACES INDICATIVE DESIGN Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 4 FIGURE 4.14 PREFERRED CORRIDOR Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 4 FIGURE 4.2.8 PREFFERED ROUTE PRIOR TO MAY 2023 Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 4 FIGURE 4.2.9 PREFERRED ROTE FOLLOWING MAY 2023 Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 4 FIGURE 4.3.2 NEW ROUTE OPTIONS SECTION Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 4 FIGURE 4.3.1 OVERVIEW OF NEW ROUTE OPTIONS Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 4 FIGURE 4.3.3 NEW ROUTE OPTIONS Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 4 FIGURE 4.3.4 NEW ROUTE OPTIONS Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 4 FIGURE 4.3.5 PROPOSED OPTIONS FLOLLOWING MARCH 2 Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 4 FIGURE 4.4.1 OVERVIEW OF POTENTIAL ALIGNMNET AND Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 4 FIGURE 4.4.2 POTENTIAL ALIGNMENTS AND ALTERNATIV Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 4 FIGURE 4.4.8 DESIGN DEVELOPMENT LOCATIONS Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 4 FIGURE 4.4.9 PROPOSED ALIGNMENTS Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 4 FIGURE 4.1.1 OVERVIEW OF CORRIDOR OPTIONS Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 4 FIGURE 4.2.2 OVERVIEW OF ROTE OPTIONS PART 1 OF Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 4 FIGURE 4.2.2 OVERVIEW OF ROUTE OPTIONS PART 2 OF Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 5 FIGURE 5.1.1 CUMULATIVE DEVELOPMENTS Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 7 FIGURE 7.2.1 RECREATIONAL ASSETS Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 7 FIGURE 7.1.1 LAND CAPABILITY FOR AGRICULTURE Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 8 FIGURE 8.11 FORESTRY STUDY AREA PART 1 OF 2 Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 8 FIGURE 8.11 FORESTRY STUDY AREA PART 2 OF 2 Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 8 FIGURE 8.2.1 BASELINE AGE CLASS STRUCTURE PART 1 Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 8 FIGURE 8.2.1 BASELINE AGE CLASS STRUCTURE PART 2 Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 8 FIGURE 8.3.1 BASELINE SPECIES COMPOSITION PART 1 Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 8 FIGURE 8.3.1 BASELINE SPECIES COMPOSITION PART 2 Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 8 FIGURE 8.3.1 BASELINE SPECIES COMPOSITION PART 3 Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 8 FIGURE 8.3.1 BASELINE SPECIES COMPOSITION PART 4 Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 8 FIGURE 8.4.1 PROPOSED DEVELOPMENT FELLING PLAN P Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 8 FIGURE 8.4.1 PROPOSED DEVELOPMENT FELLING PLAN P Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 8 FIGURE 8.5.1 PROPOSED DEVELOPMENT RESTOCKING PLA Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 8 FIGURE 8.5.1 PROPOSED DEVELOPMENT RESTOCKING PLA Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 9 FIGURE 9.1 LANDSCAPE AND VISUAL IMPACT ASSESSMEN Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 9 FIGURE 9.2A LANDSCAPE CHARACTER TYPES OVERVIEW Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 9 FIGURE 9.2B.1 LANDSCAPE CHARACTER TYPES Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 9 FIGURE 9.3A OVERHEAD LINE WITH VIEWPOINT LOCATIO Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 9 FIGURE 9.4A.1 DESIGNATED LANDSCAPES Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 9 FIGURE 9.4B DESIGNATED LANDSCAPES WITH ZTV Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 9 FIGURE 9.3.1A RESIDENTIAL PROPERTIES WITHIN 225M Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 10 FIGURE 10.1.1 HERITAGE ASSETS INNER STUDY AREA Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 10 FIGURE 10.1.1 HERITAGE ASSETS INNER STUDY AREA Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 10 FIGURE 10.2.1 DESIGNATED HERITAGE ASSETS OUTER Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 11 FIGURE 11.7.1 BAT SURVEY RESULTS PART 1 OF 3 Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 11 FIGURE 11.7.1 BAT SURVEY RESULTS PART 2 OF 3 Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 11 FIGURE 11.7.1 BAT SURVEY RESULTS PART 3 OF 3 Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 11 FIGURE 11.1.1 THE PROPOSED DEVELOPMENT AND ECOL Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 11 FIGURE 11.1.1 THE PROPOSED DEVELOPMENT AND ECOL Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 11 FIGURE 11.1.1 THE PROPOSED DEVELOPMENT AND ECOL Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 11 FIGURE 11.2.1 DESIGNATED SITES WITHIN 10KM, 5KM Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 11 FIGURE 11.3.1 HABITAT SURVEY RESULTS PART 1 OF Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 11 FIGURE 11.3.1 HABITAT SURVEY RESULTS PART 2 OF Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 11 FIGURE 11.3.1 HABITAT SURVEY RESULTS PART 3 OF Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 11 FIGURE 11.4.1 NATIONAL VEGETATION CLASSIFICATIO Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 11 FIGURE 11.4.1 NATIONAL VEGETATION CLASSIFICATIO Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 11 FIGURE 11.5.1 AREAS OF GUIDANCE STATED POTENTIA Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 11 FIGURE 11.6.1 PROTECTED SPECIES SURVEY RESULTS Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 11 FIGURE 11.6.1 PROTECTED SPECIES SURVEY RESULTS Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 11 FIGURE 11.5.1A BASELINE HABITATS USED IN ASSESS Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 11 FIGURE 11.5.1A BASELINE HABITATS USED IN ASSESS Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 11 FIGURE 11.5.1A BASELINE HABITATS USED IN ASSESS Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 12 FIGURE 12.1.1 THE PROPOSED DEVELOPMENT AND ORNI Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 12 FIGURE 12.2.1 ORNITHOLOGY DESIGNATED SITES WITH Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 12 FIGURE 12.3.1 BREEDING BIRD SURVEYS Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 12 FIGURE 12.4.1 FLIGHT ACTIVITY SURVEYS Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 12 FIGURE 12.5.1 WINTER GOOSE FORAGING SURVEYS Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 14 FIGURE 14.1 TRANSPORT ASSESSMENT SURVEY LOCATIO Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 15 FIGURE 15.1.1 NOISE SENSITIVE RECEPTORS PART 1 Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 15 FIGURE 15.1.1 NOISE SENSITIVE RECEPTORS PART 2 Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 16 FIGURE 16.1.1 CUMULATIVE ASSESSMENT Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 13 FIGURE 13.1 HYDROLOGY OVERVIEW Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 13 FIGURE 13.4 BEDROCK GEOLOGY Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 13 FIGURE 13.5 SUPERFICIAL GEOLOGY Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 13 FIGURE 13.2.1 HYDROLOGY FLOOD RISK AND BUFFERS Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 13 FIGURE 13.2.1 HYDROLOGY FLOOD RISK AND BUFFERS Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 13 FIGURE 13.2.1 HYDROLOGY FLOOD RISK AND BUFFERS Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 13 FIGURE 13.6.1 SOIL CLASSIFICATION Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 13 FIGURE 13.8.1 PROBE EPTHS PART 1 OF 3 Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 13 FIGURE 13.8.1 PROBE DEPTHS PART 2 OF 3 Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 13 FIGURE 13.8.1 PROBE DEPTHS PART 3 OF 3 Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 13 FIGURE 13.3.1 GROUNDWATER ABSTRACTIONS WATER SU Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 13 FIGURE 13.3.1 GROUNDWATER ABSTRACTIONS WATER SU Environmental Impact Assessment · 22 Sep 2025
  • EIA REPORT VOLUME 3 - CHAPTER 13 FIGURE 13.3.1 GROUNDWATER ABSTRACTIONS WATER SU Environmental Impact Assessment · 22 Sep 2025
  • LOCATION PLAN Drawing · 19 Sep 2025
  • COVERING LETTER Application Form · 19 Sep 2025
  • ELECTRIC AND MAGNETIC FIELD (EMF) STUDY REPORT Supporting Information · 19 Sep 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Angus granted permission on 19 November 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About less common application types

This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.

In Angus

  • 25/00564/S37 Granted

    Emmock & Tealing Overhead Line Tie-ins Tealing

    ECU consultation on Emmock and Tealing OHL tie-ins. The proposed development comprises the diversion of short sections of the Alyth to Tealing and Westfield to Tealing 275kv OHL. An opinion is also sought under the same submission for the installation of two short sections of parallel 275kv OHL tiebacks between the proposed Emmock substation and Tealing substation.

    Received 16 Oct, published by the council 28 Jul 2026 Other
  • 25/00374/HAZ Granted

    Drambond Sir William Smith Road Kirkton Industrial Estate Arbroath DD11 3RD

    Use of warehouse for storage of whisky casks

    Received 3 Jul, published by the council 22 Aug 2026 Other
  • 24/00598/S37 Granted

    Field 490M North East Of Airlie Lodge Cortachy Kirriemuir

    Relocation of 1 x Pole, Installation of 4 x Poles, Removal of 4 x Poles and Realignment of 11kV Overhead Line and Ancillary Works (Retrospective)

    Received 18 Jun, published by the council 1 Sep 2026 Other