Planning application

Land West Of Nether Drumgley Haughs Of Cossans Forfar

Granted Angus 25/00337/S36 Energy Consent Consultation

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Construct and operate Cossans Solar and BESS with a total generating capacity of 84.9MW

As published by the council, reference 25/00337/S36

Application record

Reference
25/00337/S36
Type
Energy Consent Consultation
Status
No Objection
Decision
Granted As published: No Objection
Received
11 Jun 2025
Validated
11 Jun 2025
Decided
14 Nov 2025
Ward
Kirriemuir & Dean
Parish
Glamis

Timeline

Dates from the published record

  1. 11 Jun 2025

    Received by Angus

  2. 14 Nov 2025

    Decision issued: No Objection

  3. 22 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

SLR Consulting Limited Agent, registered in London

Active · incorporated 1999 · London

253 applications on PlanIndex · across 70 councils · 96% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

TRIO Power Ltd Applicant, registered in London

Active · incorporated 2023 · London

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

107 documents on file for this application

  • ST ORLAND'S STONE VISUALISATIONS Supporting Information · 29 Oct 2025
  • VOLUME 3 - CHAPTER 9 - TECHNICAL APPENDIX 9.2 - THIRD OCTAVE PREDICATED NOISE LE Supporting Information · 15 Jul 2025
  • VOLUME 3 - CHAPTER 9 - TECHNICAL APPENDIX 9.1 - BASELINE DATA AND ANALYSIS Supporting Information · 15 Jul 2025
  • VOLUME 3 - CHAPTER 8 - TECHNICAL APPENDIX 8.4 - AERIAL PHOTOGRAPHY REFERENCES Supporting Information · 15 Jul 2025
  • VOLUME 3 - CHAPTER 5 - TECHNICAL APPENDIX 5.3 - LANDSCAPE SENSITIVITY Supporting Information · 15 Jul 2025
  • VOLUME 3 - CHAPTER 5 - TECHNICAL APPENDIX 5.2 - VISUAL AIDS Supporting Information · 15 Jul 2025
  • VOLUME 3 - CHAPTER 3 - TECHNICAL APPENDIX 3.1 - OUTLINE CONSTRUCTION ENVIRONMENT Supporting Information · 15 Jul 2025
  • VOLUME 2A - CHAPTER 8 - FIGURE 8.9 - EXTRACT FROM AN ORDNANCE SURVEY MAP, 1900 Supporting Information · 15 Jul 2025
  • VOLUME 2A - CHAPTER 8 - FIGURE 8.8 - EXTRACT FROM AN ORDNANCE SURVEY MAP, 1861 Supporting Information · 15 Jul 2025
  • VOLUME 2A - CHAPTER 8 - FIGURE 8.7 - EXTRACT FROM A MAP BY THOMSON, 1825 Supporting Information · 15 Jul 2025
  • VOLUME 2A - CHAPTER 8 - FIGURE 8.6 - EXTRACT FROM A MAP BY ROY, 1747-1752 Supporting Information · 15 Jul 2025
  • VOLUME 2A - CHAPTER 8 - FIGURE 8.5 - EXTRACT FROM A MAP BY BLAEU, 1662 Supporting Information · 15 Jul 2025
  • VOLUME 2A - CHAPTER 8 - FIGURE 8.4 - NON-DESIGNATED HERITAGE ASSETS WITHIN 1KM O Supporting Information · 15 Jul 2025
  • VOLUME 2A - CHAPTER 8 - FIGURE 8.14 - SATELLITE IMAGERY SHOWING THE PROPOSED DEV Supporting Information · 15 Jul 2025
  • VOLUME 2A - CHAPTER 8 - FIGURE 8.11 - LIDAR - SIMPLE LOCAL RELIEF MODEL Supporting Information · 15 Jul 2025
  • VOLUME 2A - CHAPTER 8 - FIGURE 8.10 - EXTRACT FROM AN ORDNANCE SURVEY MAP, 1955- Supporting Information · 15 Jul 2025
  • VOLUME 2A - CHAPTER 5 - FIGURE 5.2 - LANDSCAPE CHARACTER Supporting Information · 15 Jul 2025
  • VOLUME 2A - CHAPTER 5 - FIGURE 5.1 - LANDSCAPE CONTEXT Supporting Information · 15 Jul 2025
  • VOLUME 2A - CHAPTER 3 - FIGURE 3.17 - CUMULATIVE SITES WITHIN 5 KM Supporting Information · 15 Jul 2025
  • VOLUME 2A - CHAPTER 3 - FIGURE 3.1 - CONSTRAINTS WITHIN 5 KM Supporting Information · 15 Jul 2025
  • VOLUME 3 - TECHNICAL APPENDIX - COVER PAGE Supporting Information · 15 Jul 2025
  • VOLUME 2B - LANDSCAPE AND VISUAL IMPACT ASSESSMENT VISUALISATION - COVER PAGE Supporting Information · 15 Jul 2025
  • VOLUME 2A - FIGURES - COVER PAGE Supporting Information · 15 Jul 2025
  • VOLUME 1 - WRITTEN STATEMENT - COVER PAGES Supporting Information · 15 Jul 2025
  • CHAPTER 1 - INTRODUCTION Environmental Impact Assessment · 17 Jun 2025
  • CHAPTER 2 - SITE SELECTION AND DESIGN ITERATION Environmental Impact Assessment · 17 Jun 2025
  • CHAPTER 3 - PROPOSED DEVELOPMENT DESCRIPTION Environmental Impact Assessment · 17 Jun 2025
  • CHAPTER 4 - APPROACH TO ENVIRONMENTAL IMPACT ASSESSMENT Environmental Impact Assessment · 17 Jun 2025
  • CHAPTER 5 - LANDSCAPE AND VISUAL IMPACT ASSESSMENT Environmental Impact Assessment · 17 Jun 2025
  • CHAPTER 6 - ECOLOGY AND ORNITHOLOGY Environmental Impact Assessment · 17 Jun 2025
  • PLANNING STATEMENT Supporting Information · 17 Jun 2025
  • EIA REPORT NON-TECHNICAL SUMMARY Environmental Impact Assessment · 17 Jun 2025
  • CHAPTER 7 - FLOOD RISK AND HYDROLOGY Environmental Impact Assessment · 17 Jun 2025
  • CHAPTER 8 - CULTURAL HERITAGE Environmental Impact Assessment · 17 Jun 2025
  • CHAPTER 9 - NOISE Environmental Impact Assessment · 17 Jun 2025
  • CHAPTER 10 - TRANSPORT AND ACCESS Environmental Impact Assessment · 17 Jun 2025
  • CHAPTER 11 - GLINT Environmental Impact Assessment · 17 Jun 2025
  • CHAPTER 12 - SCHEDULE OF MITIGATION AND RESIDUAL EFFECTS Environmental Impact Assessment · 17 Jun 2025
  • FIGURE 1.1 - SITE LOCATION Drawing · 17 Jun 2025
  • FIGURE 2.1 - PROPOSED SITE LAYOUT 1 Drawing · 17 Jun 2025
  • FIGURE 2.2 - PROPOSED SITE LAYOUT 2 Drawing · 17 Jun 2025
  • FIGURE 2.3 - PROPOSED SITE LAYOUT 3 Drawing · 17 Jun 2025
  • FIGURE 3.2 - TYPICAL ARRAY ELEVATION Drawing · 17 Jun 2025
  • FIGURE 3.3 - TYPICAL AUXILIARY TRANSFORMER Drawing · 17 Jun 2025
  • FIGURE 3.4 - TYPICAL TRANSFORMER STATION Drawing · 17 Jun 2025
  • FIGURE 3.5 - TYPICAL BATTERY ENERGY STORAGE SYSTEM CONTAINER Drawing · 17 Jun 2025
  • FIGURE 3.6 - TYPICAL POWER CONVERSION SYSTEM STATION Drawing · 17 Jun 2025
  • FIGURE 3.7 - TYPICAL DISTRIBUTION NETWORK OPERATOR SUBSTATION Drawing · 17 Jun 2025
  • FIGURE 3.8 -TYPICAL PRIVATE (CUSTOMER) SUBSTATION Drawing · 17 Jun 2025
  • FIGURE 3.9 - TYPICAL COMMUNICATIONS AND SPARES CONTAINERS Drawing · 17 Jun 2025
  • FIGURE 3.10 - TYPICAL ADDITIONAL SPARES CONTAINER Drawing · 17 Jun 2025
  • FIGURE 3.11 - TYPICAL TRENCH SECTIONS Drawing · 17 Jun 2025
  • FIGURE 3.12 - TYPICAL WELFARE CONTAINER Drawing · 17 Jun 2025
  • FIGURE 3.13 - TYPICAL WATER TANKS AND PUMPHOUSE Drawing · 17 Jun 2025
  • FIGURE 3.14 - TYPICAL ACCESS GATE AND FENCE ELEVATIONS Drawing · 17 Jun 2025
  • FIGURE 3.15 - TYPICAL CCTV ELEVATIONS Drawing · 17 Jun 2025
  • FIGURE 3.16 - ACCESS TRACK CROSS SECTION Drawing · 17 Jun 2025
  • FIGURE 5.3 - ZONE OF THEORETICAL VISIBILITY WITH SCREENING EFFECTS FROM WOODLAND Drawing · 17 Jun 2025
  • FIGURE 5.4 - CUMULATIVE ZONE OF THEORETICAL VISIBILITY WITH CONSENTED SOLAR FARM Drawing · 17 Jun 2025
  • FIGURE 5.5A - INDICATIVE LANDSCAPE MASTERPLAN A Drawing · 17 Jun 2025
  • FIGURE 5.5B - INDICATIVE LANDSCAPE MASTERPLAN B Drawing · 17 Jun 2025
  • FIGURE 6.1 - SITE LOCATION Drawing · 17 Jun 2025
  • FIGURE 6.2A - DESIGNATED SITES WITHIN 2KM Drawing · 17 Jun 2025
  • FIGURE 6.2B - EUROPEAN DESIGNATIONS WITHIN 20 KM Drawing · 17 Jun 2025
  • FIGURE 6.3 - EXTENDED UK HABITAT RESULTS 2KM Drawing · 17 Jun 2025
  • FIGURE 8.1 - SITE LOCATION PLAN Drawing · 17 Jun 2025
  • FIGURE 7.1 - HYDROLOGICAL OVERVIEW Drawing · 17 Jun 2025
  • FIGURE 8.2 - DESIGNATED HERITAGE ASSTS WITHIN 3KM OF THE SITE Drawing · 17 Jun 2025
  • FIGURE 8.3 - DESIGNATED HERITAGE ASSETS WITHIN GLAMIS CASTLE GARDEN Drawing · 17 Jun 2025
  • FIGURE 8.4 - NON-DESIGNATED HERITAGE ASSETS WITHIN 1KM OF THE SITE Drawing · 17 Jun 2025
  • FIGURE 8.12 - LIDAR - VISUALISATION FOR ARCHAEOLOGICAL TOPOGRAPHY Drawing · 17 Jun 2025
  • FIGURE 8.13 - DESIGNED HERITAGE ASSETS AND ZONE OF THEORETICAL VISIBILITY WITHIN Drawing · 17 Jun 2025
  • FIGURE 9.1 - SITE LOCATION, NOISE MONITORING POSITIONS AND NOISE SENSITIVE RECEP Drawing · 17 Jun 2025
  • FIGURE 10.1 - PASSING PLACE REVIEW Drawing · 17 Jun 2025
  • FIGURE 5.6A - VIEWPOINT 1A - CORE PATH 272, NORTH OF SITE EXISTING VIEW Drawing · 17 Jun 2025
  • FIGURE 5.6B - VIEWPOINT 1A - CORE PATH 272, NORTH OF SITE PHOTOMONTAGE YEAR 1 Drawing · 17 Jun 2025
  • FIGURE 5.6C - VIEWPOINT 1A - CORE PATH 272, NORTH OF SITE PHOTOMONTAGE YEAR 10 Drawing · 17 Jun 2025
  • FIGURE 5.6D - VIEWPOINT 1B - CORE PATH 272, NORTH OF SITE EXISTING VIEW Drawing · 17 Jun 2025
  • FIGURE 5.6F - VIEWPOINT 1B - CORE PATH 272, NORTH OF SITE PHOTOMONTAGE YEAR 10 Drawing · 17 Jun 2025
  • FIGURE 5.6F - VIEWPOINT 1B - CORE PATH 272, NORTH OF SITE PHOTOMONTAGE YEAR 10 Drawing · 17 Jun 2025
  • FIGURE 5.7A - VIEWPOINT 2 - CORE PATH 272 EXISTING VIEW Drawing · 17 Jun 2025
  • FIGURE 5.7B - VIEWPOINT 2 - CORE PATH 272 PHOTOMONTAGE YEAR 1 Drawing · 17 Jun 2025
  • FIGURE 5.7C - VIEWPOINT 2 - CORE PATH 272 PHOTOMONTAGE YEAR 10 Drawing · 17 Jun 2025
  • FIGURE 5.8 - VIEWPOINT 3- MINOR ROAD WEST OF MAINS OF BALLINDARG EXISTING VIEW Drawing · 17 Jun 2025
  • FIGURE 5.9 - VIEWPOINT 4 - A94 WEST INGLISTON EXISTING VIEW Drawing · 17 Jun 2025
  • FIGURE 5.10 - VIEWPOINT 5 - DOUGLASTOWN EXISTING VIEW Drawing · 17 Jun 2025
  • FIGURE 5.11 - VIEWPOINT 6 - MAINS OF GLAMIS AND A94 EXISTING VIEW Drawing · 17 Jun 2025
  • FIGURE 5.12 - VIEWPOINT 7 - FORFAR- DUNDEE ROAD EXISTING VIEW Drawing · 17 Jun 2025
  • VOLUME 2C - CULTURAL HERITAGE WIRELINES - COVER AND CONTENTS PAGES Drawing · 17 Jun 2025
  • FIGURE 8.15 - VIEWPOINT 1 - GLAMIS CASTLE GARDEN AND DESIGNED LANDSCAPE WIRELINE Drawing · 17 Jun 2025
  • FIGURE 8.16 - VIEWPOINT 2A - ST ORLANDS STONE SCHEDULED MONUMENT WIRELINE Drawing · 17 Jun 2025
  • FIGURE 8.17 - VIEWPOINT 2B - ST ORLANDS STONE SCHEDULED MONUMENT WIRELINE Drawing · 17 Jun 2025
  • TECHNICAL APPENDIX 3.2 - BATTERY SAFETY STATEMENT Supporting Information · 17 Jun 2025
  • TECHNICAL APPENDIX 5.1 - LANDSCAPE AND VISUAL IMPACT ASSESSMENT METHODOLOGY AND Supporting Information · 17 Jun 2025
  • TECHNICAL APPENDIX 5.4 - VIEWPOINTS Supporting Information · 17 Jun 2025
  • TECHNICAL APPENDIX 6.1 - PRELIMINARY ECOLOGICAL APPRAISAL Supporting Information · 17 Jun 2025
  • TECHNICAL APPENDIX 6.3 - BREEDING BIRD SURVEY REPORT Supporting Information · 17 Jun 2025
  • TECHNICAL APPENDIX 6.4 - SHADOW HABITAT REGULATIONS APPRAISAL Supporting Information · 17 Jun 2025
  • TECHNICAL APPENDIX 6.5 - OUTLINE BIODIVERSITY ENHANCEMENT AND MANAGEMENT PLAN Supporting Information · 17 Jun 2025
  • TECHNICAL APPENDIX 7.1 - FLOOD RISK AND DRAINAGE ASSESSMENT Supporting Information · 17 Jun 2025
  • TECHNICAL APPENDIX 7.2 - FIREWATER MANAGEMENT PLAN REPORT Supporting Information · 17 Jun 2025
  • TECHNICAL APPENDIX 8.1 - GAZETTEER OF HERITAGE ASSETS AND EVENTS Supporting Information · 17 Jun 2025
  • TECHNICAL APPENDIX 8.2 - SETTING ASSESSMENT Supporting Information · 17 Jun 2025
  • TECHNICAL APPENDIX 8.3 - CULTURAL HERITAGE PLATES Supporting Information · 17 Jun 2025
  • TECHNICAL APPENDIX 10.1 - TRANSPORT STATEMENT Supporting Information · 17 Jun 2025
  • TECHNICAL APPENDIX 10.2 - CONSTRUCTION TRAFFIC MANAGEMENT PLAN Supporting Information · 17 Jun 2025
  • FIGURE 8.4 - NON-DESIGNATED HERITAGE ASSETS WITHIN 1KM OF THE SITE Drawing · 17 Jun 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Angus granted permission on 14 November 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

In Angus

  • 26/00388/PPPL Granted

    2 Woodside Road Letham Forfar DD8 2QD

    Residential development and associated works including access, landscaping and open space

    Received 29 Jun, published by the council 28 Jul 2026 Outline
  • 26/00037/PPPL Granted

    Farm Building 30M North Of Westfield House Duntrune

    Planning Permission in Principle for the Demolition of a Redundant Farm Building and Erection of a Dwellinghouse

    Received 26 Jan, published by the council 28 Jul 2026 Outline
  • 26/00460/EIASCR Awaiting decision

    Cable Route From Lunanhead To Montreathmont Montreathmont Forfar

    Underground cable route to connect the consented solar farm and BESS development at Montreathmont (Angus Council ref: 22/00460/FULM) to the point of connection (PoC) at Lunanhead substation. The length of the cable will be approximately 12.8 kilometres.

    Received 6 Aug, published by the council 8 Aug 2026 Outline
  • 26/00442/PPPM Awaiting decision

    Westfield Development Westfield Loan Forfar

    Planning Permission in Principle for residential development, associated infrastructure, open space and landscaping, including the associated access arrangements

    Received 4 Aug, published by the council 19 Aug 2026 Outline
  • 26/00223/PPPL Granted

    Land 35M South West Of Mains Of Craichie Craichie Forfar

    Planning permission in principle for the erection of a single dwellinghouse, including the formation of vehicular access and associated infrastructure

    Received 20 Apr, published by the council 28 Jul 2026 Outline