Planning application
Land Surrounding Fallaws Of Arbirlot Arbirlot Arbroath
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
49.9MW Solar Farm Development
As published by the council, reference 24/00432/EIASCR
Application record
- Reference
- 24/00432/EIASCR
- Type
- EIA Screening
- Status
- EIA Not Required
- Decision
- EIA NOT Required
- Received
- 5 Jul 2024
- Validated
- 8 Jul 2024
- Decided
- 20 Sep 2024
- Ward
- Arbroath West And Letham
- Parish
- Royal Burgh Of Arbroath
Site history
Applications at this address on the Angus register
This site has had 4 applications since 2024: 1 approved, 0 refused.
-
26/00422/EIASCR Awaiting decision
Land Surrounding Fallaws Of Arbirlot Arbirlot Arbroath
CONSTRUCTION AND OPERATION OF A SOLAR FARM DEVELOPMENT WITH A MAXIMUM GENERATION CAPACITY OF 49.9MW AND ASSOCIATED INFRASTRUCTURE AND GRID CONNECTION
-
25/00339/FULM Awaiting decision
Land Surrounding Fallaws Of Arbirlot Arbirlot Arbroath
Construction of a solar farm of up to 49.9MW, substation buildings, access tracks, security measures, associated infrastructure and works, and landscape and biodiversity enhancements
-
24/00367/PAN Granted
Land Surrounding Fallaws Of Arbirlot Arbirlot Arbroath
Construction and operation of a solar farm of up to 49.9MW output and its associated infrastructure
Timeline
Dates from the published record
-
5 Jul 2024
Received by Angus
-
8 Jul 2024
Validated
Checked as complete and ready for consideration.
-
20 Sep 2024
Decision issued: EIA NOT Required
-
1 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsAfter the decision
Angus has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land Surrounding Fallaws Of Arbirlot Arbirlot Arbroath
Construction and operation of a solar farm of up to 49.9MW output and its associated infrastructure
Granted 2 docs -
Land Surrounding Fallaws Of Arbirlot Arbirlot Arbroath
96% historically approved · decision due ~30 Sep
Construction of a solar farm of up to 49.9MW, substation buildings, access tracks, security measures, associated infrastructure and works, and landscape and biodiversity enhancements
Awaiting decision Full applications 204 docsMajor scheme
Other outline applications
In Angus
-
26/00388/PPPL Granted
2 Woodside Road Letham Forfar DD8 2QD
Residential development and associated works including access, landscaping and open space
-
26/00037/PPPL Granted
Farm Building 30M North Of Westfield House Duntrune
Planning Permission in Principle for the Demolition of a Redundant Farm Building and Erection of a Dwellinghouse
-
26/00460/EIASCR Awaiting decision
Cable Route From Lunanhead To Montreathmont Montreathmont Forfar
Underground cable route to connect the consented solar farm and BESS development at Montreathmont (Angus Council ref: 22/00460/FULM) to the point of connection (PoC) at Lunanhead substation. The length of the cable will be approximately 12.8 kilometres.
-
26/00442/PPPM Awaiting decision
Westfield Development Westfield Loan Forfar
Planning Permission in Principle for residential development, associated infrastructure, open space and landscaping, including the associated access arrangements
-
26/00223/PPPL Granted
Land 35M South West Of Mains Of Craichie Craichie Forfar
Planning permission in principle for the erection of a single dwellinghouse, including the formation of vehicular access and associated infrastructure