Skip to content
PlanIndex Get alerts
Menu

Planning application

Land Surrounding Fallaws Of Arbirlot Arbirlot Arbroath

Decided Angus 24/00432/EIASCR EIA Screening

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

49.9MW Solar Farm Development

As published by the council, reference 24/00432/EIASCR

Application record

Reference
24/00432/EIASCR
Type
EIA Screening
Status
EIA Not Required
Decision
EIA NOT Required
Received
5 Jul 2024
Validated
8 Jul 2024
Decided
20 Sep 2024
Ward
Arbroath West And Letham
Parish
Royal Burgh Of Arbroath

Site history

Applications at this address on the Angus register

This site has had 4 applications since 2024: 1 approved, 0 refused.

  • 26/00422/EIASCR Awaiting decision

    Land Surrounding Fallaws Of Arbirlot Arbirlot Arbroath

    CONSTRUCTION AND OPERATION OF A SOLAR FARM DEVELOPMENT WITH A MAXIMUM GENERATION CAPACITY OF 49.9MW AND ASSOCIATED INFRASTRUCTURE AND GRID CONNECTION

    Submitted 17 Jul 2026
  • 25/00339/FULM Awaiting decision

    Land Surrounding Fallaws Of Arbirlot Arbirlot Arbroath

    Construction of a solar farm of up to 49.9MW, substation buildings, access tracks, security measures, associated infrastructure and works, and landscape and biodiversity enhancements

    Submitted 9 Jun 2025 Full applications
  • 24/00367/PAN Granted

    Land Surrounding Fallaws Of Arbirlot Arbirlot Arbroath

    Construction and operation of a solar farm of up to 49.9MW output and its associated infrastructure

    Decided 14 Aug 2024

Timeline

Dates from the published record

  1. 5 Jul 2024

    Received by Angus

  2. 8 Jul 2024

    Validated

    Checked as complete and ready for consideration.

  3. 20 Sep 2024

    Decision issued: EIA NOT Required

  4. 1 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

After the decision

Angus has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Land Surrounding Fallaws Of Arbirlot Arbirlot Arbroath

    24/00367/PAN Submitted 10 Jun 2024 250 yards away

    Construction and operation of a solar farm of up to 49.9MW output and its associated infrastructure

    Granted 2 docs
  • Land Surrounding Fallaws Of Arbirlot Arbirlot Arbroath

    25/00339/FULM Submitted 9 Jun 2025 350 yards away

    96% historically approved · decision due ~30 Sep

    Construction of a solar farm of up to 49.9MW, substation buildings, access tracks, security measures, associated infrastructure and works, and landscape and biodiversity enhancements

    Awaiting decision Full applications 204 docs
    Major scheme

In Angus

  • 26/00388/PPPL Granted

    2 Woodside Road Letham Forfar DD8 2QD

    Residential development and associated works including access, landscaping and open space

    Received 29 Jun, published by the council 28 Jul 2026 Outline
  • 26/00037/PPPL Granted

    Farm Building 30M North Of Westfield House Duntrune

    Planning Permission in Principle for the Demolition of a Redundant Farm Building and Erection of a Dwellinghouse

    Received 26 Jan, published by the council 28 Jul 2026 Outline
  • 26/00460/EIASCR Awaiting decision

    Cable Route From Lunanhead To Montreathmont Montreathmont Forfar

    Underground cable route to connect the consented solar farm and BESS development at Montreathmont (Angus Council ref: 22/00460/FULM) to the point of connection (PoC) at Lunanhead substation. The length of the cable will be approximately 12.8 kilometres.

    Received 6 Aug, published by the council 8 Aug 2026 Outline
  • 26/00442/PPPM Awaiting decision

    Westfield Development Westfield Loan Forfar

    Planning Permission in Principle for residential development, associated infrastructure, open space and landscaping, including the associated access arrangements

    Received 4 Aug, published by the council 19 Aug 2026 Outline
  • 26/00223/PPPL Granted

    Land 35M South West Of Mains Of Craichie Craichie Forfar

    Planning permission in principle for the erection of a single dwellinghouse, including the formation of vehicular access and associated infrastructure

    Received 20 Apr, published by the council 28 Jul 2026 Outline