Planning application

Land 300M NE Of Bridge Of Dun Substation Dun Montrose

Granted Angus 23/00539/PAN Proposal of Application Notice

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of 49.9MW, 2 hour duration Battery Energy Storage System

As published by the council, reference 23/00539/PAN

Application record

Reference
23/00539/PAN
Type
Proposal of Application Notice
Status
Approved Subject to Conditions
Decision
Approved with Conditions
Received
7 Aug 2023
Validated
11 Aug 2023
Decided
22 Sep 2023
Ward
Montrose & District
Parish
Hillside, Dun & Logie Pert
Decision by
Committee
Postcode
DD10 9LH

Site history

Applications at this address on the Angus register

This site has had 3 applications since 2023: 2 approved, 0 refused.

  • 24/00038/FULM Granted

    Land 300M NE Of Bridge Of Dun Substation Dun Montrose

    Installation of an energy storage facility (with a capacity of up to 49.9MW) including battery enclosures, power conversion units, transformers, substations, grid connection infrastructure, vehicular access, and associated works

    Decided 13 Aug 2024 Full applications
  • 23/00758/EIASCR Decided

    Land 300M NE Of Bridge Of Dun Substation Dun Montrose

    49.9MW battery energy storage system

    Decided 25 Oct 2023 Outline

Timeline

Dates from the published record

  1. 7 Aug 2023

    Received by Angus

  2. 11 Aug 2023

    Validated

    Checked as complete and ready for consideration.

  3. 22 Sep 2023

    Decision issued: Approved with Conditions

  4. 1 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Angus granted permission on 22 September 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Angus's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • Land 300M NE Of Bridge Of Dun Substation Dun Montrose

    24/00038/FULM Submitted 29 Jan 2024 315m away

    Installation of an energy storage facility (with a capacity of up to 49.9MW) including battery enclosures, power conversion units, transformers, substations, grid connection infrastructure, vehicular access, and associated works

    Granted Full applications 50 docs
    Major scheme
  • Mill Of Dun Dun Montrose DD10 9LQ

    23/00744/LBC Submitted 10 Oct 2023 447m away

    Proposed Replacement Windows

    Granted Heritage and listed buildings Windows or glazing 5 docs
  • Land 500M SE Of Balwyllo Farm Dun Montrose

    23/00754/FULM Submitted 13 Oct 2023 496m away

    The construction and operation of a Battery Energy Storage System with a maximum storage capacity of up to 49.99 megawatts (MW) consisting of up to 40 containerised battery units, associated power conversion units, two switch rooms and other associated equipment sited within a fenced compound with perimeter landscaping.

    Granted Full applications 24 docs
    Major scheme