Planning application
Land 500M SE Of Balwyllo Farm Dun Montrose
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
The creation of an energy storage facility, associated highway access, boundary treatments and landscaping
As published by the council, reference 23/00014/PAN
Application record
- Reference
- 23/00014/PAN
- Type
- Proposal of Application Notice
- Status
- Approved Subject to Conditions
- Decision
- Granted As published: Approved with Conditions
- Received
- 10 Jan 2023
- Validated
- 10 Jan 2023
- Decided
- 17 May 2023
- Ward
- Montrose & District
- Parish
- Hillside, Dun & Logie Pert
- Decision by
- Committee
Site history
Applications at this address on the Angus register
This site has had 2 applications since 2023: 2 approved, 0 refused.
-
23/00754/FULM Granted
Land 500M SE Of Balwyllo Farm Dun Montrose
The construction and operation of a Battery Energy Storage System with a maximum storage capacity of up to 49.99 megawatts (MW) consisting of up to 40 containerised battery units, associated power conversion units, two switch rooms and other associated equipment sited within a fenced compound with perimeter landscaping.
Timeline
Dates from the published record
-
10 Jan 2023
Received by Angus
-
17 May 2023
Decision issued: Approved with Conditions
-
11 Oct 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Angus granted permission on 17 May 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Angus's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Land 500M SE Of Balwyllo Farm Dun Montrose
The construction and operation of a Battery Energy Storage System with a maximum storage capacity of up to 49.99 megawatts (MW) consisting of up to 40 containerised battery units, associated power conversion units, two switch rooms and other associated equipment sited within a fenced compound with perimeter landscaping.
Granted Full applications 24 docsMajor scheme -
Land 300M NE Of Bridge Of Dun Substation Dun Montrose
Installation of 49.9MW, 2 hour duration Battery Energy Storage System
Granted 3 docs