Planning application

AVA/2026/0092

114 Bridge Street Belper Derbyshire DE56 1AZ

Awaiting decision Amber Valley

Proposal

Listed Building Consent for repair and replacement of windows, refurbishment of existing roof lantern, installation of insulation, secondary glazing, solar panels, roof insulation & membrane, internal electrical alterations, Internal plumbing installations, exterior stone cleaning and refurbishment of internal panelling and floor

As published by the council, reference AVA/2026/0092

Timeline

Dates from the published record

  1. 16 Feb 2026

    Received by Amber Valley

  2. 19 Feb 2026

    Validated

    Checked as complete and ready for consideration.

  3. 22 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Amber Valley for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About this record

Reading the register

This page mirrors an entry on the statutory planning register that Amber Valley is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.

Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.

Nearby applications

Within 500 metres

  • AVA/2026/0091 Awaiting decision

    114 Bridge Street Belper Derbyshire DE56 1AZ

    Repair and replacement of windows, refurbishment of existing roof lantern, installation of insulation, secondary glazing, solar panels, roof insulation & membrane, internal electrical alterations, Internal plumbing installations, exterior stone cleaning and refurbishment of internal panelling and floor

    16 Feb 2026 0m away
  • TRE/2022/0179 Decided

    EAST MIDLANDS RFCA Cadet Training Centre Cluster Road Belper Derbyshire DE56 1DQ

    1nr Ash tree causing wall to bulge. Recommend fell & eco-plug Repair wall

    1 Dec 2022 45m away Trees
  • TRE/2026/0935 Decided

    The Hollies 105 Bridge Street Belper Derbyshire DE56 1BA

    Common Beech - tip back a portion of the tree over the property and neighbouring property by up to 2-3m. Tipping back to draw the crown away from buildings and roofs. Common Horse Chestnut - Crown lift to provide 5.2m clearance from ground level road side and 4m over property side. Tip back from neighbouring property for 2m clearance.

    23 Jun 2026 47m away Trees
  • TRE/2026/0917 Decided

    99 Bridge Street Belper Derbyshire DE56 1BA

    See attached "260602 Mr Wilson Schedule"

    2 Jun 2026 76m away Trees
  • TRE/2022/0063 Decided

    37 George Street Belper Derbyshire DE56 1DL

    Felling of Silver Birch and Lime

    24 May 2022 88m away Trees
  • AVA/2025/0757 Awaiting decision

    76 Bridge Street Belper Derbyshire DE56 1AZ

    Conversion of ground floor to 3 residential flats at 76 and 78 Bridge Street (may affect the character and appearance of the Conservation Area)

    27 Oct 2025 95m away