Skip to content
PlanIndex Get alerts
Menu

Planning application

AVA/2024/0720

69 Mill Street Belper Derbyshire DE56 1DU

Decided Amber Valley

Proposal

Non material amendment to AVA/2024/0332 to change cladding material from Siberian Larch Timber to Thermowood Pine

As published by the council, reference AVA/2024/0720

Timeline

Dates from the published record

  1. 16 Oct 2024

    Received by Amber Valley

  2. 22 Oct 2024

    Validated

    Checked as complete and ready for consideration.

  3. 31 Oct 2024

    Decision issued: PER

  4. 22 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About this record

Reading the register

This page mirrors an entry on the statutory planning register that Amber Valley is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.

Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.

Nearby applications

Within 500 metres

  • AVA/2021/0649 Decided

    10 Charnwood Avenue Belper Derbyshire DE56 1EA

    Single storey extension to rear and side elevation with materials to match existing, plus porch to front elevation with new safe stepped access.

    4 Jun 2021 104m away
  • TRE/2026/0900 Awaiting decision

    Street Record Jaeger Close Belper Derbyshire

    Re-pollard 9 Lime trees to previous points

    29 Apr 2026 262m away Trees
  • TRE/2022/0039 Decided

    4 Church View Belper Derbyshire DE56 1JB

    T2 [Beech] Reduce by three meters to aid in minimizing potential failure to limbs and branches. removal of deadwood throughout. T1 [Ash] Crown lift and reduce by one meter due to excessive shading.

    14 Mar 2022 288m away Trees
  • AVA/2026/0356 Awaiting decision

    31 Short Row Belper Derbyshire DE56 1DJ

    Listed building consent for the removal of non-original latex paint from the brickwork of the front and rear upper of the property and the repointing of damaged joints with Hot Lime Mortar.

    1 Jun 2026 294m away
  • AVA/2026/0361 Awaiting decision

    7 Field Row Belper Derbyshire DE56 1DH

    Listed building consent for replacement of lead flashing on a wall between 7 Field Row and Belper Unitarian Chapel (Grade II* Listed). Repointing of stone copings and gable end.

    3 Jun 2026 297m away
  • TRE/2022/0169 Decided

    Pingle House Pingle Lane Belper Derbyshire DE56 1DW

    Proposal of two sycamore trees to be reduced on the north side by 3-4 meters Reason for works: The applicant is concerned that the heavy exposed lateral limbs of both T1&T2 may fail and fall onto the narrow strip of garden space to which young children use to play. overall the trees are in good health and show no signs of disease, die-back, large cavities or weak unions. However i feel that as the trees are very mature and situated in a residential area, a sensible reduction to growth points would ensure safety and visual aesthetics.

    16 Nov 2022 313m away Trees