Brownside Farm Mountblairy Banff Aberdeenshire AB45 3YD

Decided Aberdeenshire ENQ/2024/1328 Proposal of Application Notice

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Major Development of a Photovoltaic Electricity Production Facility with Capacity of up to 35MW, Together with a Battery Energy Storage System with Capacity of up to 14.9MW and Associated Infrastructure

As published by the council, reference ENQ/2024/1328

Application record

Reference
ENQ/2024/1328
Type
Proposal of Application Notice
Status
Decided
Decision
PAC Agreed as Specified in Notice
Received
4 Sep 2024
Validated
4 Sep 2024
Decided
15 Nov 2024
Ward
Banff And District
Parish
Alvah & Forglen
Decision by
Delegated
Postcode
AB45 3YD

Site history

Applications at this address on the Aberdeenshire register

This site has had 2 applications since 2024: 1 approved, 0 refused.

  • APP/2025/0205 Granted

    Brownside Farm Mountblairy Banff Aberdeenshire AB45 3YD

    Formation of 35MW Solar Farm, Battery Energy Storage System (BESS) with an Installed Capacity of up to 14.9MW, Substation and Associated Infrastructure

    Decided 18 Jun 2025 Full applications

Timeline

Dates from the published record

  1. 4 Sep 2024

    Received by Aberdeenshire

  2. 15 Nov 2024

    Decision issued: PAC Agreed as Specified in Notice

  3. 1 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

After the decision

Aberdeenshire has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Aberdeenshire's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • Brownside Farm Mountblairy Banff Aberdeenshire AB45 3YD

    APP/2025/0205 Submitted 13 Feb 2025 0m away

    Formation of 35MW Solar Farm, Battery Energy Storage System (BESS) with an Installed Capacity of up to 14.9MW, Substation and Associated Infrastructure

    Granted Full applications 75 docs