Planning application
Former Pipeyard Portlethen Aberdeenshire AB12 4RX
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Change of Use of Land to (Class 6) Storage and Distribution, Widening of Road and Formation of Vehicular Access
As published by the council, reference APP/2025/1436
Application record
- Reference
- APP/2025/1436
- Type
- Full Planning Permission
- Status
- Awaiting decision
- Received
- 29 Aug 2025
- Validated
- 16 Sep 2025
- Ward
- North Kincardine
- Parish
- North Kincardine Rural
- Postcode
- AB12 4RX
Timeline
Dates from the published record
-
29 Aug 2025
Received by Aberdeenshire
-
16 Sep 2025
Validated
Checked as complete and ready for consideration.
-
5 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 11 November 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Aberdeenshire took a median of 64 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
22 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Aberdeenshire for determination, against a statutory target of eight weeks. Over the last year Aberdeenshire decided full applications in a median of 72 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Pipeyard At Pinewood Nigg Aberdeenshire
Installation of Petrol Fueling Station
Granted Full applications 11 docs -
A And M Smith Skip Hire Portlethen AB12 4RX
Erection of Welfare Facilities Building
Granted Full applications 11 docs -
Site At Pinewood Charleston Portlethen Aberdeenshire
Erection of Dwellinghouse and Formation of Sunken Garden
Withdrawn Full applications 16 docsDomestic -
AMS Group Ltd Portlethen Aberdeenshire AB12 4RX
Erection of Wind Turbine (Hub Height 59m, Total Height 89.5m) Upgrading of Access Track and Associated Infrastructure
Granted Full applications 101 docs -
A And M Smith Recycling Centre Ltd Portlethen Aberdeenshire AB12 4RX
Erection of Woodshed
Granted Full applications 13 docs -
Bankhead Recycling & Waste Management Duffshill Road Portlethen Aberdeenshire AB12 4RX
Installation of 3MWp Solar PV Array, 5MW Battery Energy Storage System, Hydrogen Production Facility and Associated Infrastructure
Granted Full applications 45 docs
Other full applications
In Aberdeenshire
-
APP/2026/1621 Awaiting decision
Base Station Tullich Invercauld Estate Pass Of Ballater Aberdeenshire
Installation Of Generator
-
APP/2026/1506 Awaiting decision
Surfside Caravan Park Harbour Road Fraserburgh AB43 9TB
Extension to Caravan Site Operating Times (March to January)
-
APP/2026/1489 Awaiting decision
3 Gean Court Balmedie AB23 8ST
Extension to Dwellinghouse and Installation of Flue
-
APP/2026/1494 Awaiting decision
18 David Mclean Drive Alford Aberdeenshire AB33 8PW
Erection of Garden Room (Retrospective)
-
APP/2026/1476 Awaiting decision
Huntly Hotel 18 The Square Huntly Aberdeenshire AB54 8BR
Alterations to Hotel Including Replacement Doors