Planning application
Boyndie Bay To New Deer
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Onshore Transmission Infrastructure for Caledonia Offshore Wind Farm including Formation of Onshore Landfall Point, Laying of Underground Cables, Erection of 2 Co-Located Substations, and Associated Works to connect to the Transmission Grid
As published by the council, reference APP/2024/1812
Application record
- Reference
- APP/2024/1812
- Type
- Planning Permission in Principle
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 7 Nov 2024
- Validated
- 12 Nov 2024
- Decided
- 4 Jul 2025
- Ward
- Turriff And District
- Parish
- Turriff & District
- Decision by
- Committee
Timeline
Dates from the published record
-
7 Nov 2024
Received by Aberdeenshire
-
12 Nov 2024
Validated
Checked as complete and ready for consideration.
-
4 Jul 2025
Decision issued: Approved
-
1 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
176 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Aberdeenshire granted permission on 4 July 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Site Adjacent To Craig Alvah Lodge Banff
Change of Use of Woodland to Garden Ground and Siting of 2 Glamping Pods
Granted Full applications 17 docs -
Site Adjacent To Craig Alvah Lodge Banff Aberdeenshire
Erection of Holiday Lodge
Granted Full applications 29 docs
Other outline applications
In Aberdeenshire
-
APP/2026/1510 Awaiting decision
Land To North Of Scatterburn Farm Ardoe AB12 5XX
Erection of Dwellinghouse
-
APP/2026/1482 Awaiting decision
Site Adjacent To Fielding Oyne Insch Aberdeenshire
Demolition of Redundant Agricultural Building and Erection of Dwellinghouse
-
ENQ/2026/0828 Decided
Land At Overhill Rothienorman Aberdeenshire AB51 8YN
Erection of Synchronous Condenser Facility and Associated Infrastructure including Associated High Voltage Underground Cable Connection to Rothienorman Substation
-
ENQ/2026/0208 Decided
Cromlet Farm St Katherines Aberdeenshire AB51 8SP
Erection of Free Range Poultry Building, 4 Silos and Associated Infrastructure
-
ENQ/2026/0898 Decided
Plots 4, 5, 6, 7, 8, 9, 10 And 11 Former Aviation Fuel Distribution Centre Millmoss Station Road Turriff Aberdeenshire AB53 4ER
Erection of 8 Dwellinghouses