Phase 1A (Zero C, Plots B1 - B5) Quarryline Street Chapelton Newtonhill Aberdeenshire

Granted Aberdeenshire APP/2021/1359 Approval of Matters Specified in Conds

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Conditions 3 a) (Level and Cross Sections), c) (Connection to Existing Scottish Water) and j) (Layout, Siting, Design and Finish), 4 (Phasing), 8) (Street Design) of Planning Permission in Principle Reference APP/2011/3100 for New Settlement Comprising Residential (up to 4045 Dwellinghouses), Commercial, Retail and Community Facilities, with Associated Landscaping, Open Space, Drainage and Roads Infrastructure and Services

As published by the council, reference APP/2021/1359

Application record

Reference
APP/2021/1359
Type
Approval of Matters Specified in Conds
Status
Decided
Decision
Approved
Received
9 Jun 2021
Validated
15 Jun 2021
Decided
20 Aug 2021
Ward
North Kincardine
Parish
North Kincardine Rural
Decision by
Local Member Delegated

Timeline

Dates from the published record

  1. 9 Jun 2021

    Received by Aberdeenshire

  2. 15 Jun 2021

    Validated

    Checked as complete and ready for consideration.

  3. 20 Aug 2021

    Decision issued: Approved

  4. 4 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

26 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Aberdeenshire granted permission on 20 August 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 29 Quarryline Street Chapelton Stonehaven Aberdeenshire AB39 8BT

    APP/2022/2661 Submitted 21 Dec 2022 62m away

    Painting of Shop Front

    Granted Full applications Windows or glazing 8 docs
  • 29 Quarryline Street Chapelton Stonehaven Aberdeenshire AB39 8BT

    APP/2022/2269 Submitted 26 Oct 2022 62m away

    Erection of Signage

    Granted Advertising 6 docs
  • Site C, Tranche 1, Plots 108-115 Liddell Place Land To West Of Chapelton Newtonhill Stonehaven

    APP/2016/3379 Submitted 16 Dec 2016 76m away

    Conditions 3a, b, c, e, f, g, h, j and l (Levels Survey, Drainage Plan, Foul Water Drainage Network, Cut out & Fill Operations, Details of Roads, Footpaths and Cycleways, Screen Walls/Fencing, Landscaping, Layout, Siting, and Design, Waste/Recycling Collection Points) 4 (Phasing of Development), 6 a,b,c,d,e,f,g,h,i,j (Existing and Proposed Finished Ground Levels, Existing Landscape Features to be Retained, Existing and Proposed Services, Landscaping, Schedule of Plants, Hard Landscaping, Existing Landscaping to be Removed, Biodiversity Action Plan, Management Plan, Programme for Completion and Maintenance of Landscaping), 7a, b, c, d, e, f (Inspection Regime for Offlets/Inlets, Frequency/Method for Cleaning Filter Trenches, Cutting/Weeding of Swales, Access for Future Maintenance, Planting not to be Undertaken over Perforated Pipes, Contact Parties for Factoring/Maintenance of Scheme), 8 (Street Design - Parking, Road Junctions, Visibility Splays, Gradients, Level Details, Finishing/Surfacing Materials, Crossing Points), 14 (Public Transport Strategy, 15 (Joint Condition Survey), 17 (Construction Method Statement), 19 (Site Investigation), 20 (Remediation Scheme), 21 (Badger Survey), 22 (Bat Survey), 24 (Archaeology Works), 25a, b (Energy Efficient Measures, SAP/SBEM Calculations), 27 (Soil Audit), 30 (Flood Risk Assessment), 33 (Walking and Cycling Strategy to Connection to Newtonhill and Portlethen), 36 (Site Waste Management Plan) and 37 (Site Specific Environmental Management Plan) of Planning Permission in Principle Reference APP/2011/3100 for New Settlement Comprising Residential (up to 4045 Dwellinghouses), Commercial, Retail and Community Facilities, with Associated Landscaping, Open Space, Drainage and Roads Infrastructure and Services in relation to Planning Permission APP/2011/3100 (for erection of 8 dwellinghouses)

    Granted Conditions 149 docs
    Major scheme
  • Phase 1A Stage 2, Liddell Park And Hut Land To West Of Chapelton Newtonhill Stonehaven

    APP/2016/3361 Submitted 15 Dec 2016 94m away

    Conditions 3a, b, c, e, f, g, h, k and l (Levels Survey, Drainage Plan, Foul Water Drainage Network, Cut out & Fill Operations, Details of Roads, Footpaths and Cycleways, Screen Walls/Fencing, Landscaping, Layout, Siting, and Design, Waste/Recycling Collection Points) 4 (Phasing of Development), 6 a, b,c,d,e,f,g,h,i,j, (Existing and Proposed Finished Ground Levels, Existing Landscape Features to be Retained, Existing and Proposed Services, Landscaping, Schedule of Plants, Hard Landscaping, Existing Landscaping to be Removed, Biodiversity Action Plan, Management Plan, Programme for Completion and Maintenance of Landscaping), 7a, b, c, d, e, f (Inspection Regime for Offlets/Inlets, Frequency/Method for Cleaning Filter Trenches, Cutting/Weeding of Swales, Access for Future Maintenance, Planting not to be Undertaken over Perforated Pipes, Contact Parties for Factoring/Maintenance of Scheme), 8 (Street Design - Parking, Road Junctions, Visibility Splays, Gradients, Level Details, Finishing/Surfacing Materials, Crossing Points), 14 (Public Transport Strategy, 15 (Joint Condition Survey), 17 (Construction Method Statement), 19 (Site Investigation), 20 (Remediation Scheme), 21 (Badger Survey), 22 (Bat Survey), 24 (Archaeology Works), 25a, b (Energy Efficient Measures, SAP/SBEM Calculations), 27 (Soil Audit), 30 (Flood Risk Assessment), 33 (Walking and Cycling Strategy to Connection to Newtonhill and Portlethen), 36 (Site Waste Management Plan) and 37 (Site Specific Environmental Management Plan) of Planning Permission in Principle Reference APP/2011/3100 for New Settlement Comprising Residential (up to 4045 Dwellinghouses), Commercial, Retail and Community Facilities, with Associated Landscaping, Open Space, Drainage and Roads Infrastructure and Services in relation to Planning Permission APP/2011/3100 (Phase 1a, Stage 2 - Liddell Park and Hut)

    Granted Conditions 139 docs
    Major scheme
  • Retirement Village Chapelton Of Elsick Newtonhill

    APP/2017/1823 Submitted 14 Jul 2017 106m away

    Erection of 6 Flag Poles and 1 Post-Mounted Sign

    Granted Advertising 8 docs
  • Phase 1A, Stage 2 Retirement Village Land To West Of Chapelton Newtonhill Stonehaven

    APP/2017/1676 Submitted 28 Jun 2017 113m away

    Conditions 3a (Existing and Proposed Ground/Floor Levels), 3b (Drainage Plan), 3c (Connection to Scottish Water Foul Water Drainage Network), 3e (Cut and Fill Operations), 3f (Roads, Footpaths and Cycleways), 3g (Screen Walls/Fencing), 3h (Landscaping), 3j (Layout, Siting, Design and Finish of Residential Properties), 3k (Layout, Siting, Design and Finish of Non-Residential Properties), 3l (Waste/Recycling Points), 4 (Phasing of Development), 6a (Existing and Proposed Ground Levels), 6b (Landscaping/Vegetation to be Retained), 6c (Existing and Proposed Services), 6d (Location of New Landscape Features), 6e (Schedule of Plants), 6f (Hard Landscaping Works), 6g (Landscaping to be Removed), 6h (Biodiversity Action Plan), 6i (Management Plan for Watercourse Buffer Strips), 6j (Maintenance of Landscaping), 8 (Street Design) and 25 (Energy Statement) to create retirement village, of Previously Approved Planning Application APP/2011/3100 for New Settlement Comprising Residential (up to 4045 Dwellinghouses), Commercial, Retail and Community Facilities with Associated Landscaping, Open Space, Drainage and Roads Infrastructure and Services

    Granted Conditions 33 docs
    Major scheme

In Aberdeenshire

  • APP/2026/0311 Granted

    Land At Mains Of Greens Cuminestown Aberdeenshire AB53 5YQ

    Discharge of Conditions 7 (Habitat Management Plan), 21 (Site Investigation/Remediation Strategy) and 28 (Landscaping Scheme) of Planning Permission Reference APP/2024/1927 for National for Erection of 400kV AC Substation and Associated Infrastructure

    16 Feb 2026 Conditions
  • APP/2026/0463 Granted

    Land At Mains Of Greens Cuminestown Aberdeenshire AB53 5YQ

    Discharge of Condition 23 (Private Water Supply) of Application Reference APP/2024/1927 for National for Erection of 400kV AC Substation and Associated Infrastructure

    18 Mar 2026 Conditions
  • APP/2025/2024 Granted

    Netherton Hub Land West Of Parkhills Farm Blackhills Peterhead

    Discharge of Planning Conditions 3 (Demolition), 4 (Private Water), 7 (CTMP), 8 (CEMP) 12 (Schedule of Mitigation) and 13 (Socio-economic strategy) of Planning Permission Reference APP/2024/1714 for National for Erection of a Strategic Electricity Transmission Hub Including 400kV AC Substation, 132kV AC Substation, 2 HVDC Converter Stations, Transmission Hall, Spares Warehouse, Operations Base and Associated Works

    8 Dec 2025 Conditions
  • APP/2026/0071 Granted

    Netherton Hub Land West Of Parkhills Farm Blackhills Peterhead

    Discharge of Planning Conditions 5 (Offsite Landscaping), 6 (PMO), 9 (ECoW), 10 (BEMP) and 11 (Archaeology) of Planning Permission Reference APP/2024/1714 for National for Erection of a Strategic Electricity Transmission Hub Including 400kV AC Substation, 132kV AC Substation, 2 HVDC Converter Stations, Transmission Hall, Spares Warehouse, Operations Base and Associated Works

    16 Jan 2026 Conditions
  • APP/2025/1754 Granted

    Netherton Hub Land West Of Parkhills Farm Blackhills Peterhead

    Approval of Matters Specified in Conditions 2a)i, 2a)ii, 2a)iii, 2a)iv, 2a)v, 2a)vi, 2a)vii, 2a)viii, 2a)ix, 2a)x, 2a)xi, 2a)xii, 2a)xiii, 2a)xiv, 2a)xv and 2a)xvi (Lot 1 Civils) of Planning Permission ref: APP/2024/1714 for Erection of a Strategic Electricity Transmission Hub Including 400kV AC Substation, 132kV AC Substation, 2 HVDC Converter Stations, Transmission Hall, Spares Warehouse, Operations Base and Associated Works

    27 Oct 2025 Conditions