Kintore To Tealing Overhead Line Aberdeenshire

Awaiting decision Aberdeen City 251044/S37 Consultation (S.37 Electricity Act)

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Installation of 105.2km of new double circuit 400 kilovolt (kV) overhead line (OHL), supported by steel lattice towers and ancillary overhead line works

As published by the council, reference 251044/S37

Application record

Reference
251044/S37
Type
Consultation (S.37 Electricity Act)
Status
Pending
Received
19 Sep 2025
Validated
19 Sep 2025

Timeline

Dates from the published record

  1. 19 Sep 2025

    Received by Aberdeen City

  2. 22 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 14 November 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Aberdeen City took a median of 53 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Aberdeen City for determination, against a statutory target of eight weeks. Over the last year Aberdeen City's median decision took 53 days. More in our guide to how long planning decisions take.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Aberdeen City

  • 260664/S36 Awaiting decision

    Morven South Offshore Wind Array Approximately 86 Km Off The Aberdeenshire Coast

    Construction and operation of generating station

    Received 3 Jun, published by the council 22 Jul 2026 Outline
  • 260663/S36 Awaiting decision

    Morven North Offshore Wind Array Approximately 61 Km Off The Aberdeenshire Coast

    Construction and operation of generating station

    Received 3 Jun, published by the council 22 Jul 2026 Outline
  • 260550/S36 Awaiting decision

    Bowdun Offshore Wind Farm 38 Kilometres To The East Of The Aberdeenshire Coast

    Construction and operation of generating station

    Received 7 May, published by the council 22 Jul 2026 Outline
  • 260495/S37 Awaiting decision

    Peterhead, Persley And Kintore

    Reconductoring of approximately 51 kilometres (km) of an existing 275 kilovolt (kV) overhead line (OHL), connecting substations between Peterhead and Kintore to enable operation at 400 kV, and approximately 12 km of existing 132 kV OHL connecting the existing Persley Tee to Persley Substation to enable operation at 275 kV

    Received 29 Apr, published by the council 22 Jul 2026 Outline
  • 250930/S36 Decided

    Green Volt Offshore Windfarm East Of Aberdeenshire Coast

    Variation to S36 and marine licence for the windfarm and offshore transmission infrastructure for the export cable to landfall

    Received 27 Aug, published by the council 22 Jul 2026 Outline