Aspen Lease Area 84 Km From The Scottish Coast Of Peterhead North Sea

Granted Aberdeen City 250990/S36 Consultation (S.36 Electricity Act)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Construction and operation of an offshore generating station and offshore transmission infrastructure, comprising of up to 72 wind turbine generators, with an anticipated generating capacity of 1000 megawatts

As published by the council, reference 250990/S36

Application record

Reference
250990/S36
Type
Consultation (S.36 Electricity Act)
Status
Pending
Decision
Granted As published: Granted subject to conditions
Received
8 Sep 2025
Validated
8 Sep 2025
Decided
1 Oct 2025
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 8 Sep 2025

    Received by Aberdeen City

  2. 1 Oct 2025

    Decision issued: Granted subject to conditions

  3. 22 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

73 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Aberdeen City granted permission on 1 October 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

In Aberdeen City

  • 260664/S36 Awaiting decision

    Morven South Offshore Wind Array Approximately 86 Km Off The Aberdeenshire Coast

    Construction and operation of generating station

    Received 3 Jun, published by the council 22 Jul 2026 Outline
  • 260663/S36 Awaiting decision

    Morven North Offshore Wind Array Approximately 61 Km Off The Aberdeenshire Coast

    Construction and operation of generating station

    Received 3 Jun, published by the council 22 Jul 2026 Outline
  • 260550/S36 Awaiting decision

    Bowdun Offshore Wind Farm 38 Kilometres To The East Of The Aberdeenshire Coast

    Construction and operation of generating station

    Received 7 May, published by the council 22 Jul 2026 Outline
  • 260495/S37 Awaiting decision

    Peterhead, Persley And Kintore

    Reconductoring of approximately 51 kilometres (km) of an existing 275 kilovolt (kV) overhead line (OHL), connecting substations between Peterhead and Kintore to enable operation at 400 kV, and approximately 12 km of existing 132 kV OHL connecting the existing Persley Tee to Persley Substation to enable operation at 275 kV

    Received 29 Apr, published by the council 22 Jul 2026 Outline
  • 250930/S36 Decided

    Green Volt Offshore Windfarm East Of Aberdeenshire Coast

    Variation to S36 and marine licence for the windfarm and offshore transmission infrastructure for the export cable to landfall

    Received 27 Aug, published by the council 22 Jul 2026 Outline