Planning application
Aspen Lease Area 84 Km From The Scottish Coast Of Peterhead North Sea
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Construction and operation of an offshore generating station and offshore transmission infrastructure, comprising of up to 72 wind turbine generators, with an anticipated generating capacity of 1000 megawatts
As published by the council, reference 250990/S36
Application record
- Reference
- 250990/S36
- Type
- Consultation (S.36 Electricity Act)
- Status
- Pending
- Decision
- Granted As published: Granted subject to conditions
- Received
- 8 Sep 2025
- Validated
- 8 Sep 2025
- Decided
- 1 Oct 2025
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
8 Sep 2025
Received by Aberdeen City
-
1 Oct 2025
Decision issued: Granted subject to conditions
-
22 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
73 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Aberdeen City granted permission on 1 October 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Other outline applications
In Aberdeen City
-
260664/S36 Awaiting decision
Morven South Offshore Wind Array Approximately 86 Km Off The Aberdeenshire Coast
Construction and operation of generating station
-
260663/S36 Awaiting decision
Morven North Offshore Wind Array Approximately 61 Km Off The Aberdeenshire Coast
Construction and operation of generating station
-
260550/S36 Awaiting decision
Bowdun Offshore Wind Farm 38 Kilometres To The East Of The Aberdeenshire Coast
Construction and operation of generating station
-
260495/S37 Awaiting decision
Peterhead, Persley And Kintore
Reconductoring of approximately 51 kilometres (km) of an existing 275 kilovolt (kV) overhead line (OHL), connecting substations between Peterhead and Kintore to enable operation at 400 kV, and approximately 12 km of existing 132 kV OHL connecting the existing Persley Tee to Persley Substation to enable operation at 275 kV
-
250930/S36 Decided
Green Volt Offshore Windfarm East Of Aberdeenshire Coast
Variation to S36 and marine licence for the windfarm and offshore transmission infrastructure for the export cable to landfall