Land At Inchgarth Road Cults Aberdeen

Decided Aberdeen City 250936/ESP EIA Scoping Request

Works: New dwelling

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Proposed residential development with associated open space, landscaping, infrastructure including link road and engineering works

As published by the council, reference 250936/ESP

Application record

Reference
250936/ESP
Type
EIA Scoping Request
Status
Opinion Issued
Decision
EIA scope (scoping opinion)
Received
29 Aug 2025
Validated
29 Aug 2025
Decided
9 Oct 2025
Ward
Lower Deeside
Parish
Cults, Bieldside And Milltimber
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 29 Aug 2025

    Received by Aberdeen City

  2. 9 Oct 2025

    Decision issued: EIA scope (scoping opinion)

  3. 22 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

After the decision

Aberdeen City has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Aberdeen City

  • 260664/S36 Awaiting decision

    Morven South Offshore Wind Array Approximately 86 Km Off The Aberdeenshire Coast

    Construction and operation of generating station

    3 Jun 2026 Outline
  • 260663/S36 Awaiting decision

    Morven North Offshore Wind Array Approximately 61 Km Off The Aberdeenshire Coast

    Construction and operation of generating station

    3 Jun 2026 Outline
  • 260550/S36 Awaiting decision

    Bowdun Offshore Wind Farm 38 Kilometres To The East Of The Aberdeenshire Coast

    Construction and operation of generating station

    7 May 2026 Outline
  • 260495/S37 Awaiting decision

    Peterhead, Persley And Kintore

    Reconductoring of approximately 51 kilometres (km) of an existing 275 kilovolt (kV) overhead line (OHL), connecting substations between Peterhead and Kintore to enable operation at 400 kV, and approximately 12 km of existing 132 kV OHL connecting the existing Persley Tee to Persley Substation to enable operation at 275 kV

    29 Apr 2026 Outline
  • 250930/S36 Decided

    Green Volt Offshore Windfarm East Of Aberdeenshire Coast

    Variation to S36 and marine licence for the windfarm and offshore transmission infrastructure for the export cable to landfall

    27 Aug 2025 Outline