Planning application
391 Union Street Aberdeen AB11 6BX
Works: Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation of replacement canopy, lighting, shopfront alterations, granite cleaning and all associated works
As published by the council, reference 250694/DPP
Application record
- Reference
- 250694/DPP
- Type
- Detailed Planning Permission
- Status
- Pending
- Received
- 2 Jul 2025
- Validated
- 2 Jul 2025
- Ward
- Torry/Ferryhill
- Parish
- City Centre
- Postcode
- AB11 6BX
Timeline
Dates from the published record
-
2 Jul 2025
Received by Aberdeen City
-
5 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 27 August 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Aberdeen City took a median of 53 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file
33 applications on PlanIndex · across 4 councils · 70% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Aberdeen City for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
391 Union Street Aberdeen AB11 6BX
93% historically approved · decision due ~27 Aug
Installation of 1 illuminated projecting sign, 2 illuminated letter signs, replacement canopy, lighting, shopfront alterations, granite cleaning and all associated works
Awaiting decision Heritage and listed buildings Windows or glazing 12 docs -
52-60 Langstane Place Aberdeen AB11 6EN
Change of use from class 7 (hotels and hostels) to student accommodation (sui generis)
Granted Full applications 60 docs -
393-395 Union Street Aberdeen AB11 6BX
Change of use of 393 (upper floor) and 395 Union Street from class 1A to a mix of class 1A and class 11 (assembly and leisure)
Granted Full applications 8 docs -
Flat A 8 Bon-accord Terrace Aberdeen AB11 6DP
Change of use of flat to short-term let accommodation with maximum occupancy of 2 people
Granted Full applications 9 docs -
401 Union Street Aberdeen AB11 6DA
Windows alterations including: refurbishment and installation of replacement windows and dormers, removal of chimney; replacement of dormer roof and formation of access window with associated works
Granted Heritage and listed buildings Loft or dormer Windows or glazing 15 docs -
401 Union Street Aberdeen AB11 6DA
Window alterations including: refurbishment and installation of replacement windows and dormers, removal of chimney; replacement of dormer roof and formation of access window with associated works
Granted Full applications Loft or dormer Windows or glazing 13 docs
Other full applications applications
In Aberdeen City
-
260203/DPP Granted
Redmoss Service Station Wellington Circle Aberdeen AB12 3JG
Erection of single storey side/rear extension to ancillary retail unit, installation of bin yard enclosure, alterations to ramped access, installation of balustrade, installation of replacement interceptor and connected vent lines and associated works. (Shell UK Retail Ltd.)
-
260228/DPP Granted
Land At Treetops Grove The Treetops Development Springfield Road Aberdeen AB15 7SA
Erection of retaining wall and associated landscaping (retrospective)
-
260516/DPP Granted
47 Derbeth Park Aberdeen AB15 8TU
Erection of first floor extension above existing garage to side
-
251217/DPP Granted
Unit 14B And 15 Peterseat Drive Aberdeen AB12 3HT
Change of use to vehicle sales and repair facility including alteration and extension to existing building. External works including formation of associated vehicle display area, parking, hard surfacing, wash bay, bin store and security fencing (Retrospective.)
-
251292/DPP Granted
Exceed Energy 1 Rubislaw Terrace Aberdeen AB10 1XE
Installation of replacement windows (retrospective)