Skip to content
PlanIndex Get alerts
Menu

Planning application

Land To The North Of The Altens Industrial Estate AB12 3WN

Decided Aberdeen City 221573/ESC EIA Screening Request

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Erection of 1 onshore hydrogen storage facility, 1 onshore hydrogen pipeline and HDD for offshore hydrogen pipeline and associated works

As published by the council, reference 221573/ESC

Application record

Reference
221573/ESC
Type
EIA Screening Request
Status
Opinion Issued
Decision
EIA not required (screening opinion)
Received
23 Dec 2022
Validated
23 Dec 2022
Decided
27 Feb 2023
Ward
Kincorth/Nigg/Cove
Parish
Cove And Altens
Decision by
Delegated Decision
Postcode
AB12 3WN

Timeline

Dates from the published record

  1. 23 Dec 2022

    Received by Aberdeen City

  2. 27 Feb 2023

    Decision issued: EIA not required (screening opinion)

  3. 12 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

After the decision

Aberdeen City has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Land At Doonies Farm Aberdeen

    251048/MSC Submitted 3 Oct 2025 208m away

    Approval of matters specified in conditions 42 b (demolition justification), d (site cross-sections), e (topographical survey), f (cut and fill operations), h (granite reuse), i (site plan), j (layout and finish of roads and access junctions), k (swept path analysis), 45 (biodiversity plan), 46 (landscaping scheme), 48 (CEMP), 49 (surface and foul drainage), 52 (transport assessment), 54 (archaeological works), 55 (protective fencing), 56 (standing buildings survey) of application 231371/PPP for site preparation and enabling works including the construction of a link road and associated accesses, formation of development plots, drainage infrastructure, hard and soft landscaping and associated development

    Granted Conditions Demolition 57 docs
  • Land To North And East Of Altens Industrial Site Hareness Road Aberdeen

    221532/ESC Submitted 16 Dec 2022 365m away

    Development of hydrogen production and re-fuelling facility, solar farm and solar grid connection: Phase 1. (Aberdeen Hydrogen Hub)(BP Aberdeen Hydrogen Energy Ltd.)

    Decided Outline 9 docs

In Aberdeen City

  • 260550/S36 Awaiting decision

    Bowdun Offshore Wind Farm 38 Kilometres To The East Of The Aberdeenshire Coast

    Construction and operation of generating station

    7 May 2026 Outline
  • 260495/S37 Awaiting decision

    Peterhead, Persley And Kintore

    Reconductoring of approximately 51 kilometres (km) of an existing 275 kilovolt (kV) overhead line (OHL), connecting substations between Peterhead and Kintore to enable operation at 400 kV, and approximately 12 km of existing 132 kV OHL connecting the existing Persley Tee to Persley Substation to enable operation at 275 kV

    29 Apr 2026 Outline
  • 260211/ESC Decided

    Cityview Craigshaw Drive Aberdeen AB12 3BE

    Proposed demolition of offices and associated structures

    27 Feb 2026 Outline
  • 260033/ESC Decided

    Old Wellington Road/Old Stonehaven Road/Cove Road Aberdeen

    Proposed upgraded travel facilities to include footway, cycle track and all associated works

    20 Jan 2026 Outline
  • 260070/S36 Awaiting decision

    MarramWind Ltd 75 And 110 Kilometres Off The North-east Coast Of Scotland

    Construction and operation of generating station comprise up to 225 wind turbines, associated floating units (including mooring lines and anchors), array cables, subsea distribution centres and cable and scour protection

    20 Jan 2026 Outline