Landscapers · BT21
5 potential projects within 5 miles of BT21.
From the planning register, over the last 12 months, matched to the work landscapers do. Every one of these is a real application at a real address.
Your patch is quiet, so we widened the window to the last 12 months rather than show you a near-empty quarter. The radius is unchanged: 5 miles is what the Trade plan watches.
What kind of work it is
Over the last 12 months
| Kind of application | Near you |
|---|---|
| Conditions | 5 |
A few of them
Approvals first, because an approval is a budget looking for a builder
-
Lands to rear of 38 High Street Donaghadee with access adjacent to 11-13 New Street Donaghadee
Discharge of Condition 7 of previously approved application LA06/2017/0959/F which states:- No development shall take place until full details of all proposed tree and shrub planting and a programme of works, have been submitted to and approved in writing by the Council and all tree and shrub planting shall be carried out in accordance with those details and at those times. Reason: To ensure the provision, establishment, and maintenance of a high standard of landscape. Please describe which part of the condition this application relates to: This Landscape Proposal presents a design scheme prepared by a qualified landscape architect, and will provide for the provision and establishment of a high standard of landscape. TSA Covering Letter Landscaping Proposal Site Location Plan Decision Notice
Decided Conditions Trees 6 docs -
Lands To Rear Of No.38 High Street Donaghadee With Access Adjacent To Nos. 11-13 New Street Donaghadee
Discharge of Condition 11 of previously approved application LA06/2017/0959/F which states:- Prior to the commencement of works, samples of the proposed stone and brick for use on the new proposed buildings and boundary walls shall be submitted to and agreed in writing by the Council in conjunction with Historic Environment Division. The works shall thereafter be carried out solely in accordance with the approved samples. A sample of the stone and brick shall be retained on site until the project is complete Reason: To ensure that special regard is paid to protecting the special architectural and historic interest and integrity of the building under Section 80 of The Planning Act (NI) 2011. Photo samples of the proposed stone and brick for use on the new proposed buildings and boundary walls. The two panels are located within the site
Granted Conditions 6 docs -
Ward Park, Hamilton Road, Bangor, BT20 4LG
96% historically approved · decision due ~18 Aug
Discharge of condition 2 of previously approved application LA06/2016/1108/F which states : All hard and soft landscape works shall be carried out in accordance with the approved plans Drawing Nos. 08A and 09A bearing the date stamp 15 December 2020 and Drawing No. 10 bearing the date stamp 14 October 2016, and the appropriate British Standard or other recognised Codes of Practice and shall be retained thereafter. A specification detailing the timing for the implementation of hard and soft landscaping works shall be submitted to and approved in writing by the Council prior to commencement of any works on the site. All l hard and soft landscaping shall be carried out in accordance with the approved specification. Reason: To ensure the provision, establishment and maintenance of a high standard of landscape. Discharge of condition 7 of previously approved application LA06/2016/1108/F which states : A Final Construction Environmental Management Plan (CEMP) shall be submitted to and approved by the Council in writing prior to the commencement of any works on site. This final CEMP shall contain all the mitigation as described in the Outline Construction Environmental Management Plan completed by Doran Consulting, dated November 2019 and shall be implemented as approved during the construction phase to the satisfaction of the Council. Reason: To ensure that the appointed contractor is aware of and implements the appropriate environmental mitigation during improvements construction phase. Discharge of condition 11 of previously approved application LA06/2016/1108/F which states : A revised Noise Impact Assessment /Noise Management Plan for this development shall be submitted to and agreed by the Council in writing prior to any development works commencing on site. This report shall include: An assessment of the potential noise from construction activities which must have reference to BS 5228-1:2009+A1:2014 and include confirmation that the construction works will not exceed the Category A limit (65 dB LAeq daytime). An outline of the ongoing noise monitoring programme during all construction works, (including locations/ frequency) to verify compliance with the set levels. Details of all mitigation measures to control the construction noise from the site. The noise mitigation measures shall be implemented as approved during the construction phase to the satisfaction of the Council. Reason: In the interests of amenity.
Awaiting decision Conditions 8 docs -
50 Main Street and lands to rear of 38-48 Main Street Carrowdore
Discharge of Conditions 12 and 13 of LA06/2022/0881/F, in relation to plots 1 - 13 - Condition 12 - Prior to the occupation of the proposed development, a Verification Report shall be submitted to and agreed in writing by the Council. This report shall demonstrate the successful completion of remediation works and demonstrate that the site is now fit for end-use, including details of: a) Capping system • An appropriate capping system shall be installed within the garden and landscaped areas. A 600mm capping system is required in garden and landscaping areas with a minimum of 200mm crushed stone capillary break in the base overlain with 400mm of clean material above subsoil and topsoil. The report must include details of the methodology and programme of the capping system. • Photographs and records of any excavation works within the source area including photographs showing depths to accommodate the capping layer. • Records and photographs of the clean material being used and placed on the source area, also showing depths being placed. • Details of the materials that were used for the capping system along with laboratory certificates and results which confirm that the materials are suitable for use. b) Gas Protection measures • The measures must demonstrate compliance with the requirements of CS2 as prescribed in guidance within CIRIA C665 and attain a gas protection score of at least 3.5 with the report including. • Final designs of building gas protection measures • Details of any specific products used. • records from the installation process including photographic records of: • the installation of the under-floor void • the construction of the concrete floor • membrane installation works and • Records of inspection of installed gas protection measures Reason: Protection of human health Condition 13 - If during the development works, new contamination or risks are encountered which have not previously been identified, works shall cease and the Council shall be notified immediately. This new contamination shall be fully investigated in accordance with the Model Procedures for the Management of Land Contamination (CLR11). In the event of unacceptable risks being identified, a remediation strategy shall be agreed with the Council in writing, and subsequently implemented and verified to its satisfaction. Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
Decided Conditions 12 docs -
The Paddocks Development, 50 Main Street and lands to rear of 38-48 Main Street Carrowdore
Discharge of Conditions 9 and 10 of previously approved application LA06/2022/1076/F, in relation to plots 61-67. Condition 9 - Prior to the occupation of the proposed development, a Verification Report shall be submitted to and agreed in writing by the Council. This report shall demonstrate the successful completion of remediation works and demonstrate that the site is now fit for end-use, including details of: a) Capping system • The report shall demonstrate that an appropriate capping system has been installed within the garden and landscaped areas. This must comprise a 600mm capping system with a minimum of 200mm crushed stone capillary break in the base overlain with 400mm of clean material above subsoil and topsoil. The report must include details of the methodology and programme of the capping system. • Photographs and records of any excavation works within the source area including photographs showing depths to accommodate the capping layer. • Records and photographs of the clean material being used and placed on the source area, also showing depths being placed. • Details of the materials that were used for the capping system along with laboratory certificates and results which confirm that the materials are suitable for use. b) Gas Protection measures • The measures must demonstrate compliance with the requirements of CS2 as prescribed in guidance within CIRIA C665 and attain a gas protection score of at least 3.5 with the report including. • Final designs of building gas protection measures • Details of any specific products used. • Records from the installation process including photographic records of: • The installation of the under-floor void • The construction of the concrete floor • Membrane installation works and • Records of inspection of installed gas protection measures Reason: Protection of human health. Condition 10 - If during the development works, new contamination or risks are encountered which have not previously been identified, works shall cease and the Council shall be notified immediately. This new contamination shall be fully investigated in accordance with the Model Procedures for the Management of Land Contamination (CLR11). In the event of unacceptable risks being identified, a remediation strategy shall be agreed with the Council in writing, and subsequently implemented and verified to its satisfaction. Reason: To ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other off site receptors. PLOTS 61-62-63-64-65-66-67 ONLY RSK REPORT FOR PLOTS 61-62-63-64-65-66-67 ONLY
Decided Conditions 8 docs
Start your 14-day Trade trial and watch this patch.
We'll email you when a new one appears near you, and again the day one is approved. You can see everything above from your first sign-in.
A card is needed to start, and nothing is charged for 14 days. Cancel in one click before then and you pay nothing.
Founding rate, first 50 trades. 48 places left at £29 a month. £49 a month once they're gone. Keep the plan and your rate never moves.