Council hub · Yorkshire and The Humber
York planning applications
Page 242 of 256, newest first. The York hub carries the figures, decision times and common questions.
Applications
Page 242 of 256
-
AOD/09/00212 Granted
St Peters School Clifton York YO30 6AB
Condition 13 (community use agreement) (08/00863/FULM)
-
AOD/09/00209 Granted
R S Cockerill York Limited Stamford Bridge Road Dunnington York YO19 5AE
Condition 4 (details of materials to be used) condition 6 (BREEAM design) (08/00856/FULM)
-
09/01765/FUL Granted
Bathrooms By Design Unit 3 Bentley Park Osbaldwick Link Road Osbaldwick York YO10 3JA
Change of use to use classes D2 (Assembly and leisure) and D1 (Non-residential Institutions) to include installation of mezzanine floor.
-
AOD/09/00208 Granted
48 The Village Haxby York YO32 2HX
Condition 3 (details of windows and doors) condition 4 (details of velux rooflights) condition 5 (large scale drawings of sash windows) condition 6 (details of the design of the internal door connecting the utility room and the sun room) (09/00711/LBC)
-
AOD/09/00207 Granted
58 Crossways York YO10 5JQ
Condition 4 (details of cycle storage) (06/02270/FUL)
-
AOD/09/00218 Granted
23 St Pauls Square York YO24 4BD
Discharge of Conditions 3 (Bricks); 4 (Windor and door details) and 5 (Archeological Watching Brief) relating to Application No. 09/00070/LBC
-
AOD/09/00205 Granted
14 Grange Garth York YO10 4BS
Condition 5 (details of cycle parking areas and means of enclosure) (08/00121/FUL)
-
09/01687/FUL Granted
National Railway Museum Leeman Road York YO26 4XD
Installation of air conditioning unit and extend safety barrier
-
AOD/09/00200 Split decision
Holgate Hill Hotel 124 Holgate Road York YO24 4BB
Condition 4 (means of enclosure to the site boundary) (05/00671/FUL)
-
AOD/09/00199 Split decision
P Gowland Electrical Services 18A Livingstone Street York YO26 4YJ
Condition 5 (structural survey) condition 6 (method of construction, airborne/impact sound) condition 7,8,9,10,11 (desk study) condition 12 (timetable of works) (08/00731/FUL)
-
AOD/09/00198 Split decision
22A Huntington Road York YO31 8RD
Condition 1 (the development shall begin no later than 3 years from the date of the permission) condition 2 (the development shall be carried out in accordance with approved plans) condition 3 (details of cill, dimensions, location and materials) condition 4 (all new windows shall have sliding type openings) condition 5 (details of materials to be used externally) condition 6 (sample of brick work) condition 7 (bay windows to front elevation shall be retained) condition 8 (details of soil and vent stacks, heating and air conditioning plant etc) condition 9 (the boundary wall shall be reinstated in accordance with the approved details) condition 10 (sustainability statement) condition 11 (all windows in bedrooms and lounges with a facade onto huntington road shall be insulated to provide sound attenuation) condition 12 (details for public open space facilities or alternative arrangements have been submitted) (08/00351/FUL
-
09/01645/TPO Granted
37 Ashbourne Way York YO24 2SW
Reduce from rear of property by 15 - 20%, crown balence and clean Oak (T1), Tree protected by Tree Preservation Order TPO 26
-
AOD/09/00191 Granted
St Saviourgate Chapel St Saviourgate York YO1 8NQ
Condition 3 (specification for cover plate) (08/02349/LBC)
-
AOD/09/00194 Granted
St Barnabas Voluntary Primary School Bright Street York YO26 4XS
Conditions 2 (large scale details), 3 (Sample materials), 4 (Landscaping), 5 (means of enclosure), 6 (door details), 7 (external lighting details), 9 (areas surfaced), 11 (Sustainability statement) (09/00648/REM)
-
09/01567/EIASP Decided
North Selby Mine New Road To North Selby Mine Wheldrake York YO19 6EZ
Scoping opinion for North Selby Mine
-
AOD/09/00186 Granted
39 Goodramgate York City Of York YO1 7LS
Condition 3 (details of colour and finish to signage) condition 7 (noise management scheme) (09/00655/FUL)
-
AOD/09/00189 Granted
Cedar Court Grand Hotel Station Rise York YO1 6GD
Condition 10 (schedule of works) (08/00292/LBC)
-
09/01532/ADV Granted
31A Bootham York YO30 7BT
Display of 1no non illuminated fascia sign
-
09/01533/ADV Granted
University Of York University Road Heslington York YO10 5DD
Erection of 3 no. fascia signs and 1 no. projecting sign on the central Nucleus building at Goodricke College
-
AOD/09/00179 Split decision
Elliots Hotel 2 Sycamore Place York YO30 7DW
Condition 1 (the development shall be begun not later than the expiration of the three years from the date of this permission) condition 2 (the development shall be carried out in accordance with approved plans) condition 3 (details of external materials) condition 4 (sample of brick work) condition 5 (large scale details external windows and openings) condition 6 (all new windows and doors shall be of timber construction) condition 7 (the design, finish and colour of all new rainwater goods shall be submitted) condition 8 (landscaping scheme) condition 9 (the existing railings around the perimeter of the site shall be retained) condition 10 (details of cycle parking areas) condition 11 (plans for parking and manoeuvring vehicles) condition 12 (no gates or doors shall be fitted to open outwards onto the public highway) condition 13 (method of works statement) condition 14 (details of provision of public open space) condition 15 (development in classes a to e shall not be carried out without prior notification) condition 16 (hours of work) condition 17 (sustainable design and construction statement) (07/00846/FUL)
-
AOD/09/00182 Granted
Morrisons Front Street York YO24 3BZ
Condition 7 (details of all machinery, plant and equipment and their effects on noise levels) (08/00557/FUL)
-
AOD/09/00178 Granted
Heworth C Of E Primary School Heworth Road York YO31 0AA
Condition 5 (sample panel of the brick work to be used) condition 6 (details of external materials to be used) condition 7 (details of number, design and location of lighting units) (09/00949/FUL)
-
AOD/09/00176 Granted
R S Cockerill York Limited Stamford Bridge Road Dunnington York YO19 5AE
Condition 3 (landscaping details) Condition 4 - material samples (08/00856/FULM)
-
AOD/09/00211 Granted
Middlethorpe Grange Sim Balk Lane York YO23 2UE
Condition 8 (Landscaping) - 04/00203/FUL
-
AOD/09/00167 Split decision
York Cricket And Rugby Union Football Club Shipton Road Clifton York YO30 5RE
Condition 19 (details of external lighting) condition 21 (details of all machinery, plant and equipment to be installed) (08/01930/FULM)
-
AOD/09/00163 Granted
University Of York University Road Heslington York YO10 5DD
Condition 5 (details of cycle parkig areas) (08/02807/FULM)
-
09/01419/LBC Granted
Station Building Railway Station Station Road York YO24 1AY
Alterations to waiting room including removal of window and installation of roller shutter and new timber flooring
-
AOD/09/00154 Awaiting decision
180 Fulford Road York YO10 4DA
Condition 3a (method of closing off internal door openings) condition 3b (retention of existing tiles to entrance hall) condition 3c (retention of existing timber sashand case windows) condition 3d (fire seperation measures) condition 3e (details of dry lining) condition 3f (location of flues associated with heating system) condition 3g (location and design of new fire surrounds) condition 3h (removal of lowered ceilings) condition 4 (details of insulation) condition 6a (desk study of potentially contaminative uses) condition 6b (site investagation) condition 6c (risk based remedial stratagy) condition 8 (details of parking) condition 9 (vehicle turning area) condition 10 (details of proposed materials) condition 11 (details for provision of public open space) condition 12 (details of obscure windows) condition 13 (details of landscaping scheme) condition 15 (method of works statement) (08/00317/FULM)
-
AOD/09/00156 Granted
12 Cameron Grove York YO23 1LE
Condition 2 (details of materials to be used) and Condition 4 (dropped kerb) (09/00451/FUL)
-
09/01365/FUL Granted
Postern Tower Tanners Moat York YO1 6HU
Variation of condition 3 of permission 03/03709/FUL for change of use to sale of ice-cream to allow extension of opening hours from 09:00 to19:00 to 07:00 to 19:00 on any day
-
AOD/09/00155 Granted
St Peters School Clifton York YO30 6AB
Condition 17 (Management plan detailing parking arrangements) (08/00863/FULM)
-
AOD/09/00149 Granted
69 Reighton Avenue York YO30 5QS
Condition 4 (details of cycle parking areas) (09/00601/FUL)
-
AOD/09/00148 Granted
26 Carr Lane York YO26 5HU
Condition 3 (details of external materials) condition 10 (drainage report) condition 11 (details of provision for public open space) (09/00032/FUL)
-
AOD/09/00147 Granted
Prudential House 28 - 40 Blossom Street York YO24 1AJ
Condition 8 (Details of travel plan) (08/01067/FULM)
-
AOD/09/00144 Granted
Castlemere Unit 16 Kettlestring Lane York YO30 4XF
Condition 4 (details of accomodation for delivery and service vehicles) (08/00983/FUL)
-
09/01241/REM Granted
University Of York University Road Heslington York YO10 5DD
Reserved matters application for the construction of central movement spine following previous approval of outline application 04/01700/OUT
-
09/01236/OUT Refused
Viewlands 227 Malton Road Huntington York YO32 9TD
Outline application for the erection of a dwelling
-
AOD/09/00133 Refused
University Of York University Road Heslington York YO10 5DD
Condition 12 (details of foul and suraface water drainage)
-
AOD/09/00138 Granted
110 Boroughbridge Road York YO26 6AB
Condition 3 (details of materials) (07/00304/FUL)
-
AOD/09/00130 Split decision
Park House Farm Pottery Lane Strensall York YO32 5TJ
Condition 4 (large scale details of ancillary buildings layout of pitches) condition 5 (landscaping details) condition 6 (discharge of foul or contaminated drainage) condition 7 (provision of surface water works) condition 8 (flood warning notices) condition 9 (details of the internal access road) condition 16 (detail of surface of access road) (04/01105/FUL)
-
AOD/09/00122 Granted
The National Science Learning Centre Alcuin Way Heslington York YO10 5DD
Condition 5 (details of the cycle parking areas) (08/02267/FUL)
-
AOD/09/00124 Granted
University Of York University Road Heslington York YO10 5DD
Condition 2 (details of materials to be used) (08/02807/FULM)
-
AOD/09/00126 Granted
1 Princess Road Strensall York YO32 5UE
Condition 3 (details of external materials) condition 4 (details of brickwork) condition 5 (details of windows and doors) condition 10 (details of cycle parking areas) condition 19 (details of surface water disposal) condition 20 (CHS design stage assessment) (08/02144/FUL)
-
AOD/09/00117 Granted
Ace Hotel 88 - 90 Micklegate York YO1 6JX
Comdition 2 (development to be carried out in accordance with approved plans) conditon 3 (large scale details of steel staircase) condition 4 (colour of steel staircase) condition 5 (details of basement level) condition 6 (colour of cabling) condition 7 (details of ventilation grills) (09/00346/FUL)
-
AOD/09/00114 Granted
125 Bad Bargain Lane York YO31 0PF
Condition 1 (details of scheme to show hours of operation) (09/00431/FUL)
-
09/01070/FUL Granted
2 Maple Grove York YO10 4EH
Replacement garage to side
-
AOD/09/00120 Granted
Harewood Whin Tinker Lane Rufforth York YO23 3RR
Condition 3 (details of foul and surface water drainage) (09/00303/FUL)
-
AOD/09/00115 Granted
Cedar Court Grand Hotel Station Rise York YO1 6GD
Condition 4, I (adaptations to corridor openings) (08/00292/LBC)
-
AOD/09/00116 Granted
Cedar Court Grand Hotel Station Rise York YO1 6GD
Condition 4, F (new doors onto terrace) condition 4, L (new internal doors) condition 8 (large scale details new and blocked openings, details of joinery) (08/00292/LBC)
-
AOD/09/00112 Granted
8A Minster Yard York YO1 7HH
Condition 3 (details of rooflights) (08/02680/FUL)