Skip to content
PlanIndex Get alerts
Menu

Planning application

University Of York University Road Heslington York YO10 5DD

Granted York 09/01241/REM Approval of Reserved Matters

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Reserved matters application for the construction of central movement spine following previous approval of outline application 04/01700/OUT

As published by the council, reference 09/01241/REM

Application record

Reference
09/01241/REM
Type
Approval of Reserved Matters
Status
Decided
Decision
Approve
Received
24 Jun 2009
Validated
25 Jun 2009
Decided
30 Oct 2009
Parish
Heslington Parish Council
Decision by
Main P & T Committee Decision
Postcode
YO10 5DD

Site history

Applications at this address on the York register

This site has had 32 applications since 2008: 22 approved, 2 refused.

  • AOD/26/00190 Awaiting decision

    University Of York University Road Heslington York YO10 5DD

    Conditions 19 (Surface water) and 25 (Construction details for roads and junctions, footpaths, cycleways/parking, car parking, external lighting and construction routes, working areas for the access road and car parking outside the site) of 20/01270/OUT

    Submitted 15 Jul 2026
  • 26/01051/TCA Decided

    University Of York University Road Heslington York YO10 5DD

    Fell 1no. Lime, 1no. Red Alder, and 2no. Cherry trees; Prune back regrowth from 1no. Oak and reduce 1no. branch back by 3 metres; Reduce height of 1no. Oak by 2 metres and reduce from building by 4 metres - tree works in a Conservation Area.

    Submitted 5 Jun 2026 Trees
  • AOD/24/00228 Granted

    University Of York University Road Heslington York YO10 5DD

    Conditions 6 (annual survey of traffic) and 10 (survey of current on-street parking) of 21/00193/OUT

    Decided 23 Sep 2024 Conditions
  • AOD/23/00325 Granted

    University Of York University Road Heslington York YO10 5DD

    Conditions 6 (traffic surveys) and 10 (parking surveys) of 21/00193/OUT

    Decided 2 Apr 2024 Conditions
  • 23/00507/LBC Withdrawn

    University Of York University Road Heslington York YO10 5DD

    Internal and external alterations including erection of new student centre building with associated landscaping enabling works, including works to the library footbridge, following demolition of 3no. buildings and partial demolition of footbridge.

    Decided 17 Nov 2023 Heritage and listed buildings
  • 23/00506/FULM Withdrawn

    University Of York University Road Heslington York YO10 5DD

    Erection of new student centre building with associated landscaping and enabling works, including works to the library footbridge following demolition of 3no. buildings and partial demolition of footbridge

    Decided 17 Nov 2023 Full applications
  • AOD/22/00383 Granted

    University Of York University Road Heslington York YO10 5DD

    Condition 17 of 20/00532/REMM

    Decided 10 Jan 2023 Conditions
  • AOD/22/00362 Split decision

    University Of York University Road Heslington York YO10 5DD

    Conditions 8 (drainage details) and 14 (cycle parking) of 20/00532/REMM

    Decided 23 Apr 2025 Conditions
  • AOD/22/00324 Awaiting decision

    University Of York University Road Heslington York YO10 5DD

    Condition 8 of 21/00193/OUT

    Submitted 6 Oct 2022 Conditions
  • AOD/22/00279 Awaiting decision

    University Of York University Road Heslington York YO10 5DD

    Conditions 6 of 04/01700/OUT and 6 and 10 of 21/00193/OUT

    Submitted 12 Aug 2022 Conditions

Timeline

Dates from the published record

  1. 24 Jun 2009

    Received by York

  2. 25 Jun 2009

    Validated

    Checked as complete and ready for consideration.

  3. 30 Oct 2009

    Decision issued: Approve

  4. 21 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

2 later applications on the register refer to this one:

  • AOD/10/00274 Granted

    University Of York University Road Heslington York YO10 5DD

    Condition 4 (details of UTS/bus stops) (09/01241/REM)

    Decided 16 Jan 2013 Conditions
  • AOD/10/00177 Granted

    University Of York University Road Heslington York YO10 5DD

    Condition 2 (surface water drainage) condition 5 (temporary turning head) (09/01241/REM)

    Decided 16 Jan 2013 Conditions

Documents

Plans, drawings, consultee responses and the officer's report

22 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

York granted permission on 30 October 2009, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About reserved matters applications

A reserved matters application fills in the detail held back from an earlier outline permission, judged against that permission rather than the principle of development. More in our guide to planning application types.

Nearby applications

Within 500 metres

In York

  • 26/00684/REM Granted

    Disused Mod Camp Site Wheldrake Lane Elvington York

    Reserved matters application for appearance, landscaping, layout and scale of to outline planning permission 24/01478/OUT for the erection of 1no. dwelling

    13 Apr 2026 Reserved matters
  • 26/00308/REM Granted

    York Central Leeman Road York

    Variation of conditions 1, 7, 9, 12 and 15 of permitted application 23/01506/REM for the removal of access ramp from the north-west embankment; redesign and visual improvement of the north-west embankment following removal of access ramp; reconfiguration of the Network Rail Laydown area; connection to vehicular and pedestrian access from Landings Lane under Water End and Severus Road and foot bridges; provision for unhindered pedestrian access, for authorised personnel, from Millennium Green under the ECML Bridge; a 3m strip of land abutting the base of the north-west embankment for maintenance of the embankment, Severus Footbridge, Severus Road Bridge and the ECML Bridge; and provision for additional trees on the top of the embankment

    16 Feb 2026 Reserved matters
  • 25/01693/REMM Granted

    British Sugar Corporation Ltd Plantation Drive York

    Reserved matters application for layout, scale, design / external appearance and landscaping for Phase 1, comprising strategic green infrastructure, landscaping and strategic drainage infrastructure, pursuant to Conditions 1, 5 and 9 of permission reference 23/02302/FUL (amendment to Outline Masterplan permission 15/00534/OUT) as amended by NMA permission 24/02327/NONMAT, together with details of previously approved Main Street access (Phase 1) and details of Plantation Drive access

    28 Aug 2025 Reserved matters
  • 25/01693/REM Granted

    British Sugar Corporation Ltd Plantation Drive York

    Reserved matters application for layout, scale, design / external appearance and landscaping for Phase 1, comprising strategic green infrastructure, landscaping and strategic drainage infrastructure, pursuant to Conditions 1, 5 and 9 of permission reference 23/02302/FUL (amendment to Outline Masterplan permission 15/00534/OUT) as amended by NMA permission 24/02327/NONMAT, together with details of previously approved Main Street access (Phase 1) and details of Plantation Drive access

    28 Aug 2025 Reserved matters
  • 26/00505/REMM Awaiting decision

    Site To The West Of The A1237 And South Of North Lane Huntington York

    Reserved matters application for appearance, landscaping, layout and scale of 170 houses (Phase 3A and 3B) pursuant to outline planning permission 18/00017/OUTM

    17 Mar 2026 Reserved matters