Planning applications in York, September 2009
York recorded 13 planning applications in September 2009, listed newest first. Dates are as received, or as decided where the council publishes no submission date.
Applications, September 2009
Newest first
-
AOD/09/00209 Granted
R S Cockerill York Limited Stamford Bridge Road Dunnington York YO19 5AE
Condition 4 (details of materials to be used) condition 6 (BREEAM design) (08/00856/FULM)
-
09/01765/FUL Granted
Bathrooms By Design Unit 3 Bentley Park Osbaldwick Link Road Osbaldwick York YO10 3JA
Change of use to use classes D2 (Assembly and leisure) and D1 (Non-residential Institutions) to include installation of mezzanine floor.
-
AOD/09/00208 Granted
48 The Village Haxby York YO32 2HX
Condition 3 (details of windows and doors) condition 4 (details of velux rooflights) condition 5 (large scale drawings of sash windows) condition 6 (details of the design of the internal door connecting the utility room and the sun room) (09/00711/LBC)
-
AOD/09/00207 Granted
58 Crossways York YO10 5JQ
Condition 4 (details of cycle storage) (06/02270/FUL)
-
AOD/09/00218 Granted
23 St Pauls Square York YO24 4BD
Discharge of Conditions 3 (Bricks); 4 (Windor and door details) and 5 (Archeological Watching Brief) relating to Application No. 09/00070/LBC
-
AOD/09/00205 Granted
14 Grange Garth York YO10 4BS
Condition 5 (details of cycle parking areas and means of enclosure) (08/00121/FUL)
-
09/01687/FUL Granted
National Railway Museum Leeman Road York YO26 4XD
Installation of air conditioning unit and extend safety barrier
-
AOD/09/00200 Split decision
Holgate Hill Hotel 124 Holgate Road York YO24 4BB
Condition 4 (means of enclosure to the site boundary) (05/00671/FUL)
-
AOD/09/00199 Split decision
P Gowland Electrical Services 18A Livingstone Street York YO26 4YJ
Condition 5 (structural survey) condition 6 (method of construction, airborne/impact sound) condition 7,8,9,10,11 (desk study) condition 12 (timetable of works) (08/00731/FUL)
-
AOD/09/00198 Split decision
22A Huntington Road York YO31 8RD
Condition 1 (the development shall begin no later than 3 years from the date of the permission) condition 2 (the development shall be carried out in accordance with approved plans) condition 3 (details of cill, dimensions, location and materials) condition 4 (all new windows shall have sliding type openings) condition 5 (details of materials to be used externally) condition 6 (sample of brick work) condition 7 (bay windows to front elevation shall be retained) condition 8 (details of soil and vent stacks, heating and air conditioning plant etc) condition 9 (the boundary wall shall be reinstated in accordance with the approved details) condition 10 (sustainability statement) condition 11 (all windows in bedrooms and lounges with a facade onto huntington road shall be insulated to provide sound attenuation) condition 12 (details for public open space facilities or alternative arrangements have been submitted) (08/00351/FUL
-
09/01645/TPO Granted
37 Ashbourne Way York YO24 2SW
Reduce from rear of property by 15 - 20%, crown balence and clean Oak (T1), Tree protected by Tree Preservation Order TPO 26
-
AOD/09/00191 Granted
St Saviourgate Chapel St Saviourgate York YO1 8NQ
Condition 3 (specification for cover plate) (08/02349/LBC)
-
AOD/09/00194 Granted
St Barnabas Voluntary Primary School Bright Street York YO26 4XS
Conditions 2 (large scale details), 3 (Sample materials), 4 (Landscaping), 5 (means of enclosure), 6 (door details), 7 (external lighting details), 9 (areas surfaced), 11 (Sustainability statement) (09/00648/REM)
Other months in 2009
- January 2009 12
- February 2009 14
- March 2009 14
- April 2009 3
- May 2009 16
- June 2009 6
- July 2009 11
- August 2009 9
- September 2009 13
- October 2009 10
- November 2009 12
- December 2009 10