Planning application
Whistler House Museum Street York YO1 7DP
Relates to 23/00892/LBC
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Condition 4 (lime repointing sample) of 23/00892/LBC
As published by the council, reference AOD/25/00047
Application record
- Reference
- AOD/25/00047
- Type
- Approval of Details
- Status
- Awaiting decision
- Decision
- Approve Details
- Received
- 7 Feb 2025
- Validated
- 7 Feb 2025
- Decided
- 18 Mar 2025
- Ward
- Guildhall
- Parish
- Guildhall Planning Panel
- Decision by
- Delegated Decision
- Postcode
- YO1 7DP
Site history
Applications at this address on the York register
This site has had 2 applications since 2023: 2 approved, 0 refused.
-
23/00892/LBC Granted
Whistler House Museum Street York YO1 7DP
External alterations including installation of 1no. flood barrier, lime repointing, replacement air bricks and installation of non return valves
Timeline
Dates from the published record
-
7 Feb 2025
Received by York
-
18 Mar 2025
Decision issued: Approve Details
-
13 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
23/00892/LBC Granted
Whistler House Museum Street York YO1 7DP
External alterations including installation of 1no. flood barrier, lime repointing, replacement air bricks and installation of non return valves
Who's behind it
Company information only, from the register and Companies House
Agent on file
170 applications on PlanIndex · across 16 councils · 96% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
York granted permission on 18 March 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
The Boatyard Lendal Bridge York YO1 7DP
Display of three non-illuminated post mounted signs at Lendal Hill, Lendal Tower and Lendal Landing (Revised Scheme)
Granted Advertising 5 docs -
Whistler House Museum Street York YO1 7DP
External alterations including installation of 1no. flood barrier, lime repointing, replacement air bricks and installation of non return valves
Granted Heritage and listed buildings 11 docs -
Rushbond Plc River House 17 Museum Street York YO1 7DJ
Condition 4 - 17/00847/LBC
Granted Conditions 3 docs -
The Star Inn The City Lendal Engine House Museum Street York YO1 7DR
Display of 2no. non-illuminated post mounted signs
Refused Advertising 6 docs -
Rustique 2A Lendal York YO1 8AA
Retention of suspended ceiling to ground floor
Granted Heritage and listed buildings 8 docs -
The Environment Agency Ground Floor The Hub Station Wellington Row York YO1 6BE
Conditions 2 (plans), 5 (management plan) and 6 (evacuation plan) of 24/00046/GRG3
Granted Conditions 6 docs
Other condition discharge and variation applications
In York
-
AOD/26/00082 Withdrawn
Axcel Hospitality (York) Limited 36 Piccadilly York YO1 9NX
Condition 5 (External Materials) of 24/01499/FUL
-
AOD/26/00093 Granted
Dean Court Hotel 1 - 6 Duncombe Place York YO1 7EF
Condition 3 (bats) of 22/01053/FUL
-
AOD/26/00089 Granted
The Milner Station Road York YO24 1AY
Condition 3 (materials) of 22/02629/FULM
-
AOD/26/00062 Granted
10 St Marys York YO30 7DD
Condition 3 of 25/02059/FUL
-
AOD/26/00090 Granted
Tang Hall Cp School Sixth Avenue York YO31 0UT
Conditions 3 (Bio-diversity Gain Plan), 4 (Habitat Management and Monitoring Plan), 7 (Detailed method of works/Construction Traffic Managment Plan), 8 (Construction Environmental Management Plan), 9 (Arboricultural Method Statement), and 22 (Remediation Strategy) of of 24/00857/FULM