Planning application
Orchard House 8 Hamilton Drive East York YO24 4EF
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Conditions 3, 4, 6, 7, 9 and 11 - 18/00381/FUL
As published by the council, reference AOD/18/00121
Application record
- Reference
- AOD/18/00121
- Type
- Approval of Details
- Status
- Permitted
- Decision
- Approve Details
- Received
- 25 Apr 2018
- Validated
- 25 Apr 2018
- Decided
- 27 Apr 2018
- Ward
- Holgate
- Parish
- Holgate Planning Panel
- Decision by
- Application deferred
- Postcode
- YO24 4EF
Site history
Applications at this address on the York register
This site has had 3 applications since 2011: 3 approved, 0 refused.
-
22/00643/TCA Granted
Orchard House 8 Hamilton Drive East York YO24 4EF
Fell 1no. Apple tree in a Conservation Area.
-
AOD/11/00086 Granted
Orchard House 8 Hamilton Drive East York YO24 4EF
Condition 3 (details of materials) condition 7 (measures to prevent egress of mud, water and other detritus onto the public highway) condition 8 (height of development shall not exceed 8.1 metres) condition 9 (provision for public open space) condition 11 (flood storage works) condition 12 (details of foul and surface water drainage) (10/00466/FUL)
Timeline
Dates from the published record
-
25 Apr 2018
Received by York
-
27 Apr 2018
Decision issued: Approve Details
-
6 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
York granted permission on 27 April 2018, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
-
Orchard House 8 Hamilton Drive East York YO24 4EF
Condition 3 (details of materials) condition 7 (measures to prevent egress of mud, water and other detritus onto the public highway) condition 8 (height of development shall not exceed 8.1 metres) condition 9 (provision for public open space) condition 11 (flood storage works) condition 12 (details of foul and surface water drainage) (10/00466/FUL)
Granted Conditions 1 doc -
28 Hamilton Drive East York YO24 4EF
Fell Sycamore protected by Tree Preservation Order No 39
Granted Trees 8 docs -
50 Hamilton Drive East York YO24 4EF
Crown lift 1no. Oak by 3m, crown reduce by 20% away from the existing canopy by 2m - protected by Tree Preservation Order no.39
Granted Trees 2 docs -
9 Holly Bank Road York YO24 4DS
Certificate of lawfulness for use as House in Multiple Occupation for up to 6no. occupants, within Use Class C4
Granted Lawful development 14 docs -
19 Barbara Grove York YO24 4DP
Two storey side extension and single storey side, front and rear extension
Granted Full applications Extension 7 docsSmall domestic
Other condition discharge and variation applications
In York
-
AOD/26/00082 Withdrawn
Axcel Hospitality (York) Limited 36 Piccadilly York YO1 9NX
Condition 5 (External Materials) of 24/01499/FUL
-
AOD/26/00093 Granted
Dean Court Hotel 1 - 6 Duncombe Place York YO1 7EF
Condition 3 (bats) of 22/01053/FUL
-
AOD/26/00089 Granted
The Milner Station Road York YO24 1AY
Condition 3 (materials) of 22/02629/FULM
-
AOD/26/00062 Granted
10 St Marys York YO30 7DD
Condition 3 of 25/02059/FUL
-
AOD/26/00090 Granted
Tang Hall Cp School Sixth Avenue York YO31 0UT
Conditions 3 (Bio-diversity Gain Plan), 4 (Habitat Management and Monitoring Plan), 7 (Detailed method of works/Construction Traffic Managment Plan), 8 (Construction Environmental Management Plan), 9 (Arboricultural Method Statement), and 22 (Remediation Strategy) of of 24/00857/FULM