Planning application
York Neuroimaging Centre York Biocentre Innovation Way Heslington York YO10 5NY
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Condition 5 - 15/00864/FUL
As published by the council, reference AOD/15/00355
Application record
- Reference
- AOD/15/00355
- Type
- Approval of Details
- Status
- Permitted
- Decision
- Granted As published: Approve Details
- Received
- 8 Oct 2015
- Validated
- 12 Oct 2015
- Decided
- 22 Oct 2015
- Ward
- Hull Road
- Parish
- Heslington Parish Council
- Decision by
- Delegated Decision
- Postcode
- YO10 5NY
Timeline
Dates from the published record
-
8 Oct 2015
Received by York
-
12 Oct 2015
Validated
Checked as complete and ready for consideration.
-
22 Oct 2015
Decision issued: Approve Details
-
13 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
York granted permission on 22 October 2015, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Skippko Arts Team 1 Innovation Close Heslington York YO10 5ZF
Erection of compounds for air source heat pump and associated plant room following demolition of existing structures
Granted Full applications Demolition 10 docs -
The IT Centre Innovation Way Heslington York YO10 5NP
85% historically approved · decision due ~3 Dec
Change of use office space (use class E) to a higher education teaching and research facility (use class F.1), external alterations including the installation of solar panels, plant equipment, external store and compound
Awaiting decision Full applications -
David Lloyd Clubs Windmill Lane York YO10 3LG
Development of spa garden to rear on basketball court with external lighting
Granted Full applications 17 docs -
Block C Chemistry Department Alcuin Way Heslington York YO10 5NB
Condition 4 (landscaping) 11/03412/FULM
Granted Conditions 2 docs -
Block C Chemistry Department Alcuin Way Heslington York YO10 5NB
Condition 3 (details of materials) condition 6 (details of foul and surface water drainage) 11/03412/FULM
Granted Conditions 1 doc -
Block C Chemistry Department Alcuin Way Heslington York YO10 5NB
Condition 5 (tree protection management plan) condition 7 (traffic management procedure) 11/03412/FULM
Granted Conditions Trees 3 docs
Other condition discharge and variation applications
In York
-
AOD/26/00099 Granted
Dakota Hotel Rougier Street York YO1 6HZ
Condition 10 (materials) of 24/02021/FULM
-
AOD/26/00171 Granted
Dakota Hotel Rougier Street York YO1 6HZ
Conditions 6 (Landscaping), 7 (Biodiversity), 10 (Materials), 11 (Brick sample panel), and 12 (Window reveals) of 24/02021/FULM
-
AOD/26/00207 Granted
The Dales Wheldrake Lane Elvington York YO41 4AY
Conditions 3 (cycle parking), 5 (landscaping), 6 (mud on highway) and 9 (method of works) of 26/00684/REM
-
AOD/26/00233 Awaiting decision
York Sports Village Lakeside Way Heslington York YO10 5FG
Conditions 3, 4 and 10 of 26/01187/FUL
-
AOD/26/00227 Awaiting decision
The Retreat 107 Heslington Road York YO10 5BN
Condition 18 (audit of internal spaces) of 22/02257/FULM for the Central Wing, South East Wing, and Recreation Hall of the Main Block