Skip to content
PlanIndex Get alerts
Menu

Planning application

3 Martins Court York YO26 4WS

Granted York AOD/14/00366 Approval of Details

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Condition 25 -99/01927/FUL

As published by the council, reference AOD/14/00366

Application record

Reference
AOD/14/00366
Type
Approval of Details
Status
Permitted
Decision
Permitted
Received
22 Oct 2014
Validated
27 Oct 2014
Decided
13 Nov 2014
Ward
Holgate
Parish
Heworth Planning Panel
Postcode
YO26 4WS

Timeline

Dates from the published record

  1. 22 Oct 2014

    Received by York

  2. 27 Oct 2014

    Validated

    Checked as complete and ready for consideration.

  3. 13 Nov 2014

    Decision issued: Permitted

  4. 6 Sep 2026

    Added to PlanIndex

What this grant of permission means

York granted permission on 13 November 2014, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • York Central Leeman Road York

    23/01506/REM Submitted 1 Aug 2023 43m away

    Variation of condition 1 of permitted application 23/01631/REM to amend the East Coast Main Line Bridge and associated embankments

    Granted Reserved matters 42 docs
  • York Central Leeman Road York

    23/00628/NONMAT Submitted 27 Mar 2023 43m away

    Non-material amendment to consent 20/00710/REMM to alter plans approved under condition 1 relating to the ECML Bridge and Embankments

    Withdrawn Amendments 17 docs
  • York Central Leeman Road York

    26/00308/REM Submitted 16 Feb 2026 43m away

    Variation of conditions 1, 7, 9, 12 and 15 of permitted application 23/01506/REM for the removal of access ramp from the north-west embankment; redesign and visual improvement of the north-west embankment following removal of access ramp; reconfiguration of the Network Rail Laydown area; connection to vehicular and pedestrian access from Landings Lane under Water End and Severus Road and foot bridges; provision for unhindered pedestrian access, for authorised personnel, from Millennium Green under the ECML Bridge; a 3m strip of land abutting the base of the north-west embankment for maintenance of the embankment, Severus Footbridge, Severus Road Bridge and the ECML Bridge; and provision for additional trees on the top of the embankment

    Granted Reserved matters Trees 16 docs
  • Howarth Timber Ltd Leeman Road York YO26 4XH

    23/01458/ADV Submitted 26 Jul 2023 136m away

    Display of 1no. non illuminated totem sign

    Granted Advertising 5 docs
  • 45 Aldborough Way York YO26 4UX

    24/01493/FUL Submitted 20 Aug 2024 168m away

    Use of land adjacent to garage (use class C3) as a food bank - retrospective

    Granted Full applications 19 docs
  • 43 Aldborough Way York YO26 4UX

    22/02145/FUL Submitted 13 Oct 2022 175m away

    First floor side and single storey side and rear extension

    Granted Full applications Extension 8 docs
    Small domestic

In York

  • AOD/26/00082 Withdrawn

    Axcel Hospitality (York) Limited 36 Piccadilly York YO1 9NX

    Condition 5 (External Materials) of 24/01499/FUL

    17 Mar 2026 Conditions
  • AOD/26/00093 Granted

    Dean Court Hotel 1 - 6 Duncombe Place York YO1 7EF

    Condition 3 (bats) of 22/01053/FUL

    31 Mar 2026 Conditions
  • AOD/26/00089 Granted

    The Milner Station Road York YO24 1AY

    Condition 3 (materials) of 22/02629/FULM

    27 Mar 2026 Conditions
  • AOD/26/00062 Granted

    10 St Marys York YO30 7DD

    Condition 3 of 25/02059/FUL

    2 Mar 2026 Conditions
  • AOD/26/00090 Granted

    Tang Hall Cp School Sixth Avenue York YO31 0UT

    Conditions 3 (Bio-diversity Gain Plan), 4 (Habitat Management and Monitoring Plan), 7 (Detailed method of works/Construction Traffic Managment Plan), 8 (Construction Environmental Management Plan), 9 (Arboricultural Method Statement), and 22 (Remediation Strategy) of of 24/00857/FULM

    27 Mar 2026 Conditions