Skip to content
PlanIndex Get alerts
Menu

Planning application

Law Courts Clifford Street York YO1 9RD

Granted York AOD/12/00325 Approval of Details

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Condition 3a (cross section drawings) condition 3b (full details of the proposed alterations to the safe) 12/03122/LBC

As published by the council, reference AOD/12/00325

Application record

Reference
AOD/12/00325
Type
Approval of Details
Status
Permitted
Decision
Approve Details
Received
20 Dec 2012
Validated
20 Dec 2012
Decided
25 Jan 2013
Ward
Guildhall
Parish
Guildhall Planning Panel
Postcode
YO1 9RD

Site history

Applications at this address on the York register

This site has had 8 applications since 2003: 4 approved, 0 refused.

  • 26/01165/LBC Awaiting decision

    Law Courts Clifford Street York YO1 9RD

    External alterations including removal of 3no. external boiler flues and installation of 2no. taller replacement flues.

    Submitted 25 Jun 2026 Heritage and listed buildings
  • 26/01164/FUL Awaiting decision

    Law Courts Clifford Street York YO1 9RD

    Removal of 3no. external boiler flues and installation of 2no. taller replacement flues.

    Submitted 25 Jun 2026 Full applications
  • 26/00952/FUL Awaiting decision

    Law Courts Clifford Street York YO1 9RD

    External works to part replace and repair existing roof and installation of the new thermal and water proofing covering, access steps between roof no.1 and no.2, replacement roof lanterns, repair and replacement of existing guttering, down pipes and hoppers and repairs, replacement and blocking up of existing windows. Internal works to repair cornicing, pilasters, and lime plaster repairs to courts no.1 and 2.

    Submitted 26 May 2026 Full applications
  • 26/00927/LBC Awaiting decision

    Law Courts Clifford Street York YO1 9RD

    External works to part replace and repair existing roof and installation of the new thermal and water proofing covering, access steps between roof no.1 and no.2, replacement roof lanterns, repair and replacement of existing guttering, down pipes and hoppers and repairs, replacement and blocking up of existing windows. Internal works to repair cornicing, pilasters, and lime plaster repairs to courts no.1 and 2.

    Submitted 20 May 2026 Heritage and listed buildings
  • 22/01337/LBC Granted

    Law Courts Clifford Street York YO1 9RD

    Internal works including upgrading of fire compartmentation

    Decided 20 Dec 2022 Heritage and listed buildings
  • AOD/10/00017 Granted

    Law Courts Clifford Street York YO1 9RD

    Discharge of condition revised drawing for proposed secure fines counter (09/02150/LBC)

    Decided 12 Feb 2010 Conditions
  • 03/00988/LBC Granted

    Law Courts Clifford Street York YO1 9RD

    Internal alterations

    Decided 13 May 2003 Heritage and listed buildings

Timeline

Dates from the published record

  1. 20 Dec 2012

    Received by York

  2. 25 Jan 2013

    Decision issued: Approve Details

  3. 6 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

2 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

York granted permission on 25 January 2013, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

In York

  • AOD/26/00082 Withdrawn

    Axcel Hospitality (York) Limited 36 Piccadilly York YO1 9NX

    Condition 5 (External Materials) of 24/01499/FUL

    17 Mar 2026 Conditions
  • AOD/26/00093 Granted

    Dean Court Hotel 1 - 6 Duncombe Place York YO1 7EF

    Condition 3 (bats) of 22/01053/FUL

    31 Mar 2026 Conditions
  • AOD/26/00089 Granted

    The Milner Station Road York YO24 1AY

    Condition 3 (materials) of 22/02629/FULM

    27 Mar 2026 Conditions
  • AOD/26/00062 Granted

    10 St Marys York YO30 7DD

    Condition 3 of 25/02059/FUL

    2 Mar 2026 Conditions
  • AOD/26/00090 Granted

    Tang Hall Cp School Sixth Avenue York YO31 0UT

    Conditions 3 (Bio-diversity Gain Plan), 4 (Habitat Management and Monitoring Plan), 7 (Detailed method of works/Construction Traffic Managment Plan), 8 (Construction Environmental Management Plan), 9 (Arboricultural Method Statement), and 22 (Remediation Strategy) of of 24/00857/FULM

    27 Mar 2026 Conditions