Skip to content
PlanIndex Get alerts
Menu

Planning application

21/00773/FUL

Kimberley House Lancaster Road Out Rawcliffe Preston Lancashire PR3 6BN

Granted Wyre Full Application

Proposal

Single storey rear extension

As published by the council, reference 21/00773/FUL

Timeline

Dates from the published record

  1. 11 Jun 2021

    Received by Wyre

  2. 5 Aug 2021

    Decision issued: Application Permitted

  3. 30 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/00420/FUL Awaiting decision

    Hattersbrick Farm Lancaster Road Out Rawcliffe Preston Lancashire PR3 6BN

    Formation of a surface water attenuation pond (retrospective)

    18 May 2026 58m away Full applications
  • 22/01226/FUL Granted

    The Kirklands Lancaster Road Out Rawcliffe Preston Lancashire PR3 6BN

    Extension to existing private riding arena, floodlights and realignment of internal track

    29 Nov 2022 97m away Full applications
  • 26/00518/LAWP Awaiting decision

    Crook Farm Lancaster Road Out Rawcliffe Lancashire

    Lawful development certificate for the proposed siting of a caravan on the land for residential occupation, required temporarily in connection with and for the duration of the operations being carried out on the adjoining land for the construction works associated with planning permission 23/00828/FUL

    23 Jun 2026 226m away Lawful development
  • 26/00512/FUL Awaiting decision

    Tudor Farm Lancaster Road Out Rawcliffe Preston Lancashire PR3 6BN

    Removal of existing lawful static caravan and erection of building to be used for staff room, office and WC for welfare facilities

    22 Jun 2026 281m away Full applications

In Wyre

  • 26/00456/FUL Granted

    4 Stoneygate Thornton Cleveleys Lancashire FY5 3TN

    Conversion of garage to habitable space, removal of garage door and installation of window, and Velux window to rear roof slope

    29 May 2026 Full applications
  • 26/00387/FUL Refused

    Summerdale Head Dyke Lane Pilling Preston Lancashire PR3 6SJ

    Change of use of vacant office (E(c)(ii) to dwelling (C3) and alterations to windows and doors, including provision of balcony, and change of use of agricultural land to residential garden in association with the dwelling.

    8 May 2026 Full applications
  • 26/00616/FUL Awaiting decision

    Bodkin Hollins Lane Forton Preston Lancashire PR3 0AA

    Replacement of flat roof to pitched roof on existing two storey extension, demolition of existing conservatory and erection of side and rear single storey pitched roof extension and erection of canopy to the rear.

    24 Jul 2026 Full applications
  • 26/00348/FUL Granted

    Stonecross Cottage 28 Bonds Lane Barnacre With Bonds Lancashire PR3 1ZB

    Erection of 2 No. front dormers, rear hip to gable roof extension, single storey rear extension and erection of detached double garage

    27 Apr 2026 Full applications
  • 26/00410/FUL Granted

    Church Farm Chapel Lane Out Rawcliffe Preston Lancashire PR3 6TB

    Erection of agricultural storage building (Retrospective)

    13 May 2026 Full applications