Planning application
17 The Burrow Wolverhampton West Midlands WV3 9DD
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Single storey side extension and conversion of garage to create a self-contained annexe, single storey rear extension and new two storey rear extension
As published by the council, reference 25/00418/FUL
Application record
- Reference
- 25/00418/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Grant
- Received
- 3 Apr 2025
- Validated
- 3 Apr 2025
- Decided
- 24 Apr 2026
- Ward
- Tettenhall Wightwick
- Decision by
- Delegated Decision
- Postcode
- WV3 9DD
Timeline
Dates from the published record
-
3 Apr 2025
Received by Wolverhampton
-
24 Apr 2026
Decision issued: Grant
-
24 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Wolverhampton
51 applications on PlanIndex · across 11 councils · 96% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
15 The Burrow Wolverhampton West Midlands WV3 9DD
Erection of conservatory to rear.
Granted Full applications Extension 6 docs -
Ashwood House 15 The Burrow Wolverhampton West Midlands WV3 9DD
1. Beech (0449) - felling to ground level/stump grind. 2. Sycamore(small to rear of cherry laurel) - felling to ground level/stump grind. 3. Sycamore x2 (small - far left corner) - felling to ground level/stump grind. 4. Ash (small - twin stemmed) 7.0m from boundary fence - felling to ground level/stump grind. 5. Hawthorn (426 near fence) - Stub removal, shape improvement. 6. Birch x2 (isalnd bed) fell to ground level. 7. Beech (0489) fell to ground level. 8. Ash (0488) Reduction of weight 50% from low limb. 9. Sycamore (against boundary fence) fell to ground level. 10. Hawthorn - remove stubs/shape improvement.
Granted TreesSmall domestic -
Ashwood House 15 The Burrow Wolverhampton West Midlands WV3 9DD
1. Beech (0449) - felling to ground level/stump grind. 2. Sycamore(small to rear of cherry laurel) - felling to ground level/stump grind. 3. Sycamore x2 (small - far left corner) - felling to ground level/stump grind. 4. Ash (small - twin stemmed) 7.0m from boundary fence - felling to ground level/stump grind. 5. Hawthorn (426 near fence) - Stub removal, shape improvement. 6. Birch x2 (isalnd bed) fell to ground level. 7. Beech (0489) fell to ground level. 8. Ash (0488) Reduction of weight 50% from low limb. 9. Sycamore (against boundary fence) fell to ground level. 10. Hawthorn - remove stubs/shape improvement.
Granted Trees 2 docsSmall domestic -
2 The Burrow Wolverhampton West Midlands WV3 9DD
Fell 1 tree, coppice 3x Field Maples and various pruning - FULL DETAILS WITHIN REPORT
Granted Trees 2 docs -
2 The Burrow Wolverhampton West Midlands WV3 9DD
86% historically approved · decision due ~8 Sep
2/2/32 (T29) Crown lift to 2.5m all round by reducing and removing branch tips. Reduce tree height by approximately 2m from outer canopy extent; reduce northern / eastern crown radius by 1 - 1.75m from outer extent and southern and western crown radius by 0.75-1.5m.
Decided Trees -
17 The Burrow Wolverhampton West Midlands WV3 9DD
89% historically approved · decision due ~31 Aug
Variation of condition 2 of application 25/00418/FUL to allow for the addition of a plant room and shower area to the proposed pool building.
Awaiting decision Reserved matters
Other full applications applications
In Wolverhampton
-
26/00370/FUL Refused
146 Probert Road Wolverhampton West Midlands WV10 6UA
Proposed single storey rear extension, roof alterations and loft conversion
-
26/00951/FUL Awaiting decision
158 Warstones Road Wolverhampton West Midlands WV4 4LH
First floor side extension.
-
25/00406/FUL Granted
Garage Site Behind 6 To 20 Pace Crescent Wolverhampton West Midlands
Five new dwellings.
-
26/00621/FUL Granted
43 Marshall Road Wolverhampton West Midlands WV13 3PB
Single storey side and rear extension with loft conversion and new dormer. (Amended description)
-
26/00956/FUL Awaiting decision
21 Field Head Place Wolverhampton West Midlands WV6 8XE
Replacement of windows