Skip to content
PlanIndex Get alerts
Menu

Planning application

Dovecotes Primary School Ryefield Wolverhampton West Midlands WV8 1TX

Granted Wolverhampton 24/00900/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of a new boundary fence and gates along the boundary of Reapers Walk (Revised proposal re-location of the proposed fence)

As published by the council, reference 24/00900/FUL

Application record

Reference
24/00900/FUL
Type
Full Application
Status
Decided
Decision
Grant
Received
23 Aug 2024
Validated
16 Oct 2024
Decided
6 Dec 2024
Ward
Oxley
Decision by
Delegated Decision
Postcode
WV8 1TX

Timeline

Dates from the published record

  1. 23 Aug 2024

    Received by Wolverhampton

  2. 16 Oct 2024

    Validated

    Checked as complete and ready for consideration.

  3. 6 Dec 2024

    Decision issued: Grant

  4. 6 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

9 applications on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 9 Barnwood Road Wolverhampton West Midlands WV8 1UN

    22/00874/FUL Submitted 29 Jul 2022 219m away

    Proposed change of use from Dwelling (C3) to Children's Care Home (C2) for 2 children aged between 8 and 16.

    Granted Full applications 7 docs
    Domestic
  • 26 Catisfield Crescent Wolverhampton West Midlands WV8 1XQ

    07/01719/FUL Submitted 6 Dec 2007 225m away

    Single storey front/side extension to create garage.

    Granted Full applications Extension 6 docs
    Small domestic
  • 1 Harvesters Walk Wolverhampton West Midlands WV8 1UG

    26/00902/CPL Submitted 24 Aug 2026 249m away

    95% historically approved · decision due ~19 Oct

    Change of use from a single dwellinghouse (Use Class C3) to a small children's residential care home (Use Class C2), providing accommodation for up to two children alongside two adult carers on a 24-hour basis.

    Awaiting decision Lawful development
    Domestic
  • 9 Crofters Walk Wolverhampton West Midlands WV8 1UT

    22/01565/FUL Submitted 21 Dec 2022 268m away

    Erection of a 1.30m (4ft) fence in the front garden to support the safety, health and comfort of a disabled person (altered description)

    Granted Full applications 5 docs
    Small domestic
  • 20 The Glade Wolverhampton West Midlands WV8 1UU

    21/01030/PDPA Submitted 7 Jul 2021 291m away

    Ground floor rear extension measuring 6m in depth beyond the rear original wall, having a maximum height of 2.8m and height to the eaves of 2.5m

    Granted Prior approval Extension 5 docs
  • 1 Harvesters Walk Wolverhampton West Midlands WV8 1UG

    26/00337/FUL Submitted 7 Apr 2026 296m away

    Change of use of residential dwelling house (C3) into children's care home (C2)

    Refused Full applications 7 docs
    Domestic

In Wolverhampton

  • 26/00370/FUL Refused

    146 Probert Road Wolverhampton West Midlands WV10 6UA

    Proposed single storey rear extension, roof alterations and loft conversion

    14 Apr 2026 Full applications
  • 25/00406/FUL Granted

    Garage Site Behind 6 To 20 Pace Crescent Wolverhampton West Midlands

    Five new dwellings.

    1 Apr 2025 Full applications
  • 26/00621/FUL Granted

    43 Marshall Road Wolverhampton West Midlands WV13 3PB

    Single storey side and rear extension with loft conversion and new dormer. (Amended description)

    4 Jun 2026 Full applications
  • 26/00536/FUL Granted

    24 Springfield Lane Wolverhampton West Midlands WV10 6PX

    Two storey side extension

    14 May 2026 Full applications
  • 26/00740/FUL Granted

    32 Danescourt Road Wolverhampton West Midlands WV6 9BG

    Single storey rear extension

    6 Jul 2026 Full applications