Skip to content
PlanIndex Get alerts
Menu

Planning application

U S A M Trading Estate Wood Lane Wolverhampton West Midlands

Granted Wolverhampton 24/00750/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

2no. Industrial Units

As published by the council, reference 24/00750/FUL

Application record

Reference
24/00750/FUL
Type
Full Application
Status
Decided
Decision
Grant
Received
10 Jul 2024
Validated
10 Jul 2024
Decided
20 Sep 2024
Ward
Bushbury North
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 10 Jul 2024

    Received by Wolverhampton

  2. 20 Sep 2024

    Decision issued: Grant

  3. 24 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice

31 applications on PlanIndex · across 5 councils · 97% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 64 Wood Lane Wolverhampton West Midlands WV10 8HQ

    22/00863/PDPA Submitted 6 Jul 2022 102m away

    Single storey rear extension (6.00m projection beyond the rear wall of the original dwelling, 3.65m maximum height, and 2.78m eaves height).

    Granted Prior approval Extension 5 docs
    Small domestic
  • 76 Kipling Road Wolverhampton West Midlands WV10 6BL

    24/00875/PDPA Submitted 15 Aug 2024 147m away

    Single storey rear extension: 5.00m beyond the rear wall of the original dwellinghouse, 3.10m maximum height and 2.80m height at the eaves

    Granted Prior approval Extension 9 docs
    Small domestic
  • Telecommunications Equipment South U S A M Trading Estate Wood Lane Wolverhampton West Midlands

    21/00100/FUL Submitted 28 Jan 2021 155m away

    The removal of existing 20m high Phosco Phase 1 Monopole and the replacement with a 18.60m high Phosco Phase 4.5 Monopole c/w a new 3.4m high headframe; The installation of 9No. replacement Vodafone antennas and 9No. new Telefonica antennas installed on new headframe; The relocation and installation of 1No. 0.3m existing Vodafone dishes fixed to new headframe; The installation of 2No. 0.3m new Telefonica dishes fixed to new headframe; The installation of 1no. Telefonica GPS module fixed to to new headframe above antennas; The installation of 15no. Vodafone and 15No. Telefonica ERS's fixed to new headframe; The installation of 2No. Telefonica equipment racks and 1No. Eltek PSU cabinet on existing concrete base and development ancillary thereto.

    Granted Full applications 9 docs
  • 116 School Lane Wolverhampton West Midlands WV10 8HZ

    21/00278/FUL Submitted 1 Mar 2021 215m away

    Single storey side and rear extension

    Granted Full applications Extension 8 docs
    Small domestic
  • Former Pump House 61 Wood Lane Wolverhampton West Midlands WV10 8HH

    22/01306/FUL Submitted 19 Nov 2022 228m away

    Change of use of existing building to low level storage, new boundary fence, associated parking and loading bays

    Granted Full applications 6 docs
    Small domestic
  • 49 - 51 School Lane Wolverhampton West Midlands WV10 8HY

    25/00536/FUL Submitted 6 May 2025 234m away

    Construction of 4no two bedroom maisonette residential units

    Granted Full applications 29 docs

In Wolverhampton

  • 26/00370/FUL Refused

    146 Probert Road Wolverhampton West Midlands WV10 6UA

    Proposed single storey rear extension, roof alterations and loft conversion

    14 Apr 2026 Full applications
  • 25/00406/FUL Granted

    Garage Site Behind 6 To 20 Pace Crescent Wolverhampton West Midlands

    Five new dwellings.

    1 Apr 2025 Full applications
  • 26/00621/FUL Granted

    43 Marshall Road Wolverhampton West Midlands WV13 3PB

    Single storey side and rear extension with loft conversion and new dormer. (Amended description)

    4 Jun 2026 Full applications
  • 26/00536/FUL Granted

    24 Springfield Lane Wolverhampton West Midlands WV10 6PX

    Two storey side extension

    14 May 2026 Full applications
  • 26/00740/FUL Granted

    32 Danescourt Road Wolverhampton West Midlands WV6 9BG

    Single storey rear extension

    6 Jul 2026 Full applications