Planning application
Millcroft 79 Mill Lane Tettenhall Wood Wolverhampton West Midlands WV6 8HE
Works: Extension Loft or dormer
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Two storey rear extension, loft conversion ans ourbuilding
As published by the council, reference 24/00338/FUL
Application record
- Reference
- 24/00338/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Grant
- Received
- 21 Mar 2024
- Validated
- 21 Mar 2024
- Decided
- 9 May 2024
- Ward
- Tettenhall Wightwick
- Decision by
- Delegated Decision
- Postcode
- WV6 8HE
Timeline
Dates from the published record
-
21 Mar 2024
Received by Wolverhampton
-
9 May 2024
Decision issued: Grant
-
24 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Albrighton
160 applications on PlanIndex · across 6 councils · 91% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
81 Mill Lane Tettenhall Wood Wolverhampton West Midlands WV6 8HE
Single storey front extension, single storey rear extension and first floor side/rear extension.
Granted Full applications Extension 12 docsSmall domestic -
17 Dippons Mill Close Wolverhampton West Midlands WV6 8HH
Beech Tree: Prune lower canopy by up to 3 metres. Prune upper canopy by 2.3m as appropriate. see app: 0094/08 17 dippons mill
Withdrawn Trees -
17 & 21 Dippons Mill Close Wolverhampton West Midlands WV6 8HH
06/00105/TPO (W11) - T1 - Swedish Whitebeam (next to garage of 21 Dippons Mill Close) - Crown reduce by up to 1 metres to reshape and balance. Crown lift to 2.5 metres. Reason: to provide appropriate clearance above garage and over garden. T2 - Ash (nearest 21 Dippons Mill Road) - Reduce height by up to 3 metres and reduce overhang over garden / house of 21 Dippons Mill Close by no more than 2 metres. T3 - Ash - Crown reduce branch overhanging road back to appropriate pruning point at the boundary between the lawned area and the pavement. Reduce by no more than 2 metres in height. Beech (Rear garden of 21 Dippons Mill Close) - Prune branches growing 'in front' of holly tree by 2.5 metres back to appropriate pruning points in accordance with BS 3998.
Granted Trees 2 docs -
23 Dippons Mill Close Wolverhampton West Midlands WV6 8HH
Single storey side extension.
Granted Full applications Extension 4 docsSmall domestic -
62 Mount Road Tettenhall Wood Wolverhampton West Midlands WV6 8HQ
Two storey side extension including dormer extension to front and side elevations and single storey extension to rear with a conservatory
Granted Full applications Extension Loft or dormer 6 docsSmall domestic -
3 Dippons Mill Close Wolverhampton West Midlands WV6 8HH
Single storey rear extension with flat roof.
Granted Full applications Extension 7 docsSmall domestic
Other full applications applications
In Wolverhampton
-
26/00370/FUL Refused
146 Probert Road Wolverhampton West Midlands WV10 6UA
Proposed single storey rear extension, roof alterations and loft conversion
-
26/00951/FUL Awaiting decision
158 Warstones Road Wolverhampton West Midlands WV4 4LH
First floor side extension.
-
25/00406/FUL Granted
Garage Site Behind 6 To 20 Pace Crescent Wolverhampton West Midlands
Five new dwellings.
-
26/00621/FUL Granted
43 Marshall Road Wolverhampton West Midlands WV13 3PB
Single storey side and rear extension with loft conversion and new dormer. (Amended description)
-
26/00956/FUL Awaiting decision
21 Field Head Place Wolverhampton West Midlands WV6 8XE
Replacement of windows