Skip to content
PlanIndex Get alerts
Menu

Planning application

3 Greenacres Wolverhampton West Midlands WV6 8SR

Granted Wolverhampton 24/00080/FUL Full Application

Works: Extension Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed rear extensions to dwelling

As published by the council, reference 24/00080/FUL

Application record

Reference
24/00080/FUL
Type
Full Application
Status
Decided
Decision
Grant
Received
22 Jan 2024
Validated
22 Jan 2024
Decided
20 Mar 2024
Ward
Tettenhall Regis
Decision by
Committee Decision
Postcode
WV6 8SR

Timeline

Dates from the published record

  1. 22 Jan 2024

    Received by Wolverhampton

  2. 20 Mar 2024

    Decision issued: Grant

  3. 24 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Glaisher Drive

153 applications on PlanIndex · across 13 councils · 87% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 38C Redhouse Road Wolverhampton West Midlands WV6 8ST

    22/01521/FUL Submitted 12 Dec 2022 41m away

    Extension and alteration to existing garage to form a two storey residential annexe

    Refused Full applications Extension 10 docs
  • 40 Redhouse Road Wolverhampton West Midlands WV6 8ST

    22/00698/TR Submitted 16 Jun 2022 49m away

    06/00495/TPO (T6) - Reduction of oak tree in rear garden of the property by no more then 1.5 - 2 metres of radial lateral branch spread. Crown lift to by the removal of secondary branches to provide no more than 54.75 metres clearance above ground level, and remove lowest secondary branch extending towards Redhouse Road (if not already removed by general crown lift) and pruning of branches away from roof line of both properties to give at least 2 metre clearance. Reason(s): to keep the tree in a manageable size and keep the tree away from buildings as is currently touching both houses. N.B. amended works specification agreed on site with agent on 7th September 2022.

    Granted Trees 2 docs
  • 46 Redhouse Road Wolverhampton West Midlands WV6 8SP

    22/00983/FUL Submitted 23 Aug 2022 82m away

    Ground floor front extension

    Granted Full applications Extension 6 docs
  • 29 Hinckes Road Wolverhampton West Midlands WV6 8RJ

    23/00228/REM Submitted 10 Mar 2023 94m away

    Materials - Smooth Rendered walls - Smooth Concrete Marley Modern Roof - Black UPVC Windows - Rainwater goods Black upvc- White Soffit and fascias. Tarmac Drive with aco Drainage channel Electric Charging Points . Levels Landscaping Method Statement

    Granted Reserved matters Windows or glazing 5 docs
  • 61 Wrottesley Road Tettenhall Wolverhampton West Midlands WV6 8SG

    06/01778/FUL Submitted 28 Dec 2006 109m away

    Residential development comprising demolition of 61 Worttesley Road and erection of two detached dwellings

    Refused Full applications New dwelling Demolition 5 docs
  • 58 Redhouse Road Wolverhampton West Midlands WV6 8SP

    22/01205/FUL Submitted 21 Oct 2022 132m away

    PROPOSED ALTERATIONS TO FRONTAGE INCLUDING SINGLE & THREE STOREY FRONT EXTENSIONS, BALCONY AND ENTRANCE CANOPY AND A SINGLE STOREY REAR EXTENSION & LOFT CONVERSION

    Granted Full applications Extension Loft or dormer 7 docs
    Small domestic

In Wolverhampton

  • 26/00370/FUL Refused

    146 Probert Road Wolverhampton West Midlands WV10 6UA

    Proposed single storey rear extension, roof alterations and loft conversion

    14 Apr 2026 Full applications
  • 25/00406/FUL Granted

    Garage Site Behind 6 To 20 Pace Crescent Wolverhampton West Midlands

    Five new dwellings.

    1 Apr 2025 Full applications
  • 26/00621/FUL Granted

    43 Marshall Road Wolverhampton West Midlands WV13 3PB

    Single storey side and rear extension with loft conversion and new dormer. (Amended description)

    4 Jun 2026 Full applications
  • 26/00536/FUL Granted

    24 Springfield Lane Wolverhampton West Midlands WV10 6PX

    Two storey side extension

    14 May 2026 Full applications
  • 26/00740/FUL Granted

    32 Danescourt Road Wolverhampton West Midlands WV6 9BG

    Single storey rear extension

    6 Jul 2026 Full applications