Planning application
4B Finchfield Road Wolverhampton West Midlands WV3 9LS
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Resubmission of 22/00804/FUL - Proposed two storey rear extension, first floor rear extension, single storey rear extension and new parking area to frontage.
As published by the council, reference 23/00144/FUL
Application record
- Reference
- 23/00144/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Grant
- Received
- 16 Feb 2023
- Validated
- 16 Feb 2023
- Decided
- 24 Mar 2023
- Ward
- Park
- Decision by
- Delegated Decision
- Postcode
- WV3 9LS
Timeline
Dates from the published record
-
16 Feb 2023
Received by Wolverhampton
-
24 Mar 2023
Decision issued: Grant
-
6 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice
133 applications on PlanIndex · across 8 councils · 85% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
4B Finchfield Road Wolverhampton West Midlands WV3 9LS
Proposed two storey rear extension , first floor rear extension, single storey rear extension and new parking area to frontage
Granted Full applications Extension 14 docsSmall domestic -
Treetops 39 Finchfield Gardens Wolverhampton West Midlands WV3 9LT
Cedar - 30% reduction of crown as tree is situated roughly 6metres from the property and is at risk of a failure; Cyprus - 35% reduction of crown as this tree is also situated 6 metres from the property, however is a little taller so plan would be to bring them down to similar heights; Cyprus - Fell . this tree is situated roughly 1metre away from the property and would need to come out as is 3foot in diameter and is encroaching on the property, its drains and its foundations.
Granted Trees 2 docs -
Dutch House Finchfield Gardens Wolverhampton West Midlands WV3 9LT
Two storey side and rear extension, first floor rear extension and ground floor extension amended proposal
Granted Full applications Extension 12 docs -
Dutch House Finchfield Gardens Wolverhampton West Midlands WV3 9LT
Fell group of conifers and maple in rear garden (as shown in photo)
Granted Trees 1 doc -
4 Finchfield Gardens Wolverhampton West Midlands WV3 9LT
No more than 1m side reduction of trees to left of house looking from the road, removing material no larger than 25mm in diameter.
Granted Trees 3 docs -
4 Finchfield Gardens Wolverhampton West Midlands WV3 9LT
Reduce crown of cherry tree by one third.
Granted Trees 2 docs
Other full applications applications
In Wolverhampton
-
26/00370/FUL Refused
146 Probert Road Wolverhampton West Midlands WV10 6UA
Proposed single storey rear extension, roof alterations and loft conversion
-
26/00951/FUL Awaiting decision
158 Warstones Road Wolverhampton West Midlands WV4 4LH
First floor side extension.
-
25/00406/FUL Granted
Garage Site Behind 6 To 20 Pace Crescent Wolverhampton West Midlands
Five new dwellings.
-
26/00621/FUL Granted
43 Marshall Road Wolverhampton West Midlands WV13 3PB
Single storey side and rear extension with loft conversion and new dormer. (Amended description)
-
26/00956/FUL Awaiting decision
21 Field Head Place Wolverhampton West Midlands WV6 8XE
Replacement of windows