Planning application
22/01216/PDPA
33 Waite Road Wolverhampton West Midlands WV13 3EZ
Proposal
Single storey rear extension: 6.00m beyond the rear wall of the original dwellinghouse, 3.00m maximum height and 2.80m height at the eaves
As published by the council, reference 22/01216/PDPA
Timeline
Dates from the published record
-
26 Oct 2022
Received by Wolverhampton
-
22 Nov 2022
Decision issued: No Objections Received
-
23 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About prior approval applications
How this application type works
Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.
Nearby applications
Within 500 metres
-
21/00302/FUL Granted
34 Barnett Road Wolverhampton West Midlands WV13 3LD
First floor side extension and conversion of existing garage to habitable use
-
21/00192/FUL Granted
29 Fawley Close Wolverhampton West Midlands WV13 3ER
First floor side extension and single storey rear extension
-
21/00346/FUL Decided
158 Dilloways Lane Wolverhampton West Midlands WV13 3JP
Residential development comprising of an extension and conversion of dwellings at 118-120 Moseley Road into 4no apartments, new built units on the land to the rear of 158 Dilloways Lane to create 19no apartments with associated parking and amenity
-
26/00390/FUL Awaiting decision
Shri Maha Kali Bhameshwari Mandir 158 Dilloways Lane Wolverhampton West Midlands WV13 3JP
Single and two storey side extension and single storey extension to the rear of existing temple to provide for library, storage and amenity space.
-
07/00790/FUL Granted
7 Vaughan Road Portobello Wolverhampton Willenhall West Midlands WV13 3TJ
Single storey extension and conservatory at rear and roof over driveway to create car port
-
26/00611/FUL Granted
32 Hawkswell Drive Wolverhampton West Midlands WV13 3EJ
Two storey side extension
Other prior approval applications
In Wolverhampton
-
26/00691/PDPA Granted
21 Linton Road Wolverhampton West Midlands WV4 4DS
Single storey rear extension: 6.00 metres beyond the rear wall of the original dwellinghouse, 3.00 metres maximum height and 3.00 metres height at the eaves.
-
26/00713/PDPA Granted
116 Ringwood Road Wolverhampton West Midlands WV10 9EP
Single storey rear extension: 6.00 metres beyond the rear wall of the original dwellinghouse, 3.00 metres maximum height and 3.00 metres height at the eaves.
-
26/00706/PDPA Granted
3 Fir Grove Wolverhampton West Midlands WV3 0UR
Single storey rear extension maximum rearward projection beyond the wall of the 'original' dwellinghouse 3.75m, maximum height: 3.75m and height up to eaves: 2.75m
-
26/00692/PDPA Granted
8 Middleway Green Wolverhampton West Midlands WV14 6DJ
Ground floor rear extension measuring 6m in depth beyond the rear original wall, having a maximum height of 3.3m and height to the eaves of 2.5m
-
26/00717/PDPA Granted
39 Five Fields Road Wolverhampton West Midlands WV12 4NZ
Single storey rear extension. Maximum rear projection from the original rear elevation 3.5 m, maximum eaves height 3 m and maximum height 3.5 m