Planning application

Land West Of 301 Lichfield Road Wolverhampton West Midlands

Granted Wolverhampton 22/00966/FUL Full Application

Works: New dwelling Loft or dormer

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Residential Development comprising 7, three bed detached dormer bungalows and 2 x four bed detached dormer bungalows with associated landscaping and parking

As published by the council, reference 22/00966/FUL

Application record

Reference
22/00966/FUL
Type
Full Application
Status
Decided
Decision
Granted As published: Grant
Received
17 Aug 2022
Validated
20 Oct 2022
Decided
21 Oct 2022
Ward
Wednesfield South
Decision by
Delegated Decision

Site history

Applications at this address on the Wolverhampton register

This site has had 2 applications since 2022: 2 approved, 0 refused.

  • 24/01245/RC Granted

    Land West Of 301 Lichfield Road Wolverhampton West Midlands

    Variation of Condition 2 of application 22/00966/FUL -Residential development comprising seven, three bed detached dormer bungalows and two, four bed detached dormer bungalows with associated landscaping and parking. Amendment comprises revisions to site layout as a result of underground National Grid cables

    Decided 11 Sep 2025 Conditions

Timeline

Dates from the published record

  1. 17 Aug 2022

    Received by Wolverhampton

  2. 20 Oct 2022

    Validated

    Checked as complete and ready for consideration.

  3. 21 Oct 2022

    Decision issued: Grant

  4. 25 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

1 later application on the register refers to this one:

  • 24/01245/RC Granted

    Land West Of 301 Lichfield Road Wolverhampton West Midlands

    Variation of Condition 2 of application 22/00966/FUL -Residential development comprising seven, three bed detached dormer bungalows and two, four bed detached dormer bungalows with associated landscaping and parking. Amendment comprises revisions to site layout as a result of underground National Grid cables

    Decided 11 Sep 2025 Conditions

Who's behind it

Company information only, from the register and Companies House

Stoneleigh Architectural Services Ltd Agent, an architecture practice registered in Albrighton

Active · incorporated 2006 · Albrighton

207 applications on PlanIndex · across 7 councils · 90% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

26 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Wolverhampton granted permission on 21 October 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Land West 301 Lichfield Road Wolverhampton West Midlands WV11 3EN

    23/01123/REM Submitted 17 Oct 2023 50 yards away

    3. Prior to above ground construction, details of all materials to be used externallyshall be submitted to and approved in writing by the local planning authority. Schedule of materials - attached 4. No development shall take place until details of all proposed excavations, andexisting and proposed site and slab levels have been submitted to and approved inwriting by the local planning authority. These details shall include the proposed grading of land areas including the levels and contours to be formed, showing therelationship of proposed levels to existing surrounding landform and buildings andareas required for drainage purposes. Structural engineering / site levels / Drainage attached 5. The development shall not be occupied until details of the landscaping of the site(including hard surfaces, boundary treatments and wherever appropriate theretention of existing trees) have been submitted to, and approved in writing by, thelocal planning authority. The approved landscaping scheme shall be fully implemented within one year of thefirst occupation and shall be maintained thereafter for a period of not less than fiveyears. The maintenance shall include the replacement of any tree or shrub which isremoved, destroyed or dies by a tree or shrub or the same size and species as that which it replaces, unless otherwise agreed in writing by the Local Planning Authority. Landscaping drawing attached 6. Prior to the commencement of the development, details for the disposal of foul and surface water shall be submitted to and approved in writing by the local planning authority and the works shall only be carried out in accordance with those details so approved. Such water disposal shall whenever practical be disposed of on site without the need for connection to any mains system. Drainage plans attached 7. The development shall not commence until a Construction Method Statement (to include controls in relation to traffic management, hours of operation, ...

    Withdrawn Reserved matters 28 docs
  • Land West Of 301 Lichfield Road Wolverhampton West Midlands

    24/01245/RC Submitted 21 Nov 2024 50 yards away

    Variation of Condition 2 of application 22/00966/FUL -Residential development comprising seven, three bed detached dormer bungalows and two, four bed detached dormer bungalows with associated landscaping and parking. Amendment comprises revisions to site layout as a result of underground National Grid cables

    Granted Conditions New dwelling Loft or dormer 12 docs
  • 62B Olinthus Avenue Wolverhampton West Midlands WV11 3DH

    20/00207/FUL Submitted 27 Feb 2020 50 yards away

    Extension of a detached outbuilding, for conversion to a habitable room, creation a new parking space

    Granted Full applications Extension 4 docs
  • 57 Olinthus Avenue Wednesfield Wolverhampton West Midlands WV11 3DH

    07/00538/FUL Submitted 13 Apr 2007 100 yards away

    Two storey side extension.

    Granted Full applications Extension 6 docs
  • 88 Lichwood Road Wolverhampton West Midlands WV11 3DJ

    20/00069/FUL Submitted 23 Jan 2020 200 yards away

    Permeable driveway, measuring 6 x 3 metres.

    Refused Full applications 6 docs
  • 35 Lichwood Road Wolverhampton West Midlands WV11 3DL

    23/00056/FUL Submitted 23 Jan 2023 200 yards away

    Two storey side extension following demolition of existing garage to create annex for single parent

    Refused Full applications Extension Demolition 7 docs

In Wolverhampton

  • 26/01122/FUL Awaiting decision

    9A Fourth Avenue Wolverhampton West Midlands WV10 9LY

    Change of Use from Residential garage (C3) to Retail (E) and single storey rear extension (retrospective)

    Received 19 Oct, published by the council 20 Oct 2026 Full applications
  • 26/01123/FUL Awaiting decision

    45 Warstones Crescent Wolverhampton West Midlands WV4 4LQ

    Single storey side and rear extension, single storey front extension and canopy.

    Received 19 Oct, published by the council 20 Oct 2026 Full applications
  • 26/01111/FUL Awaiting decision

    182 Lea Road Wolverhampton West Midlands WV3 0LG

    Retrospective, conversion of single dwelling house in to two self contained flats

    Received 18 Oct, published by the council 20 Oct 2026 Full applications
  • 26/01108/FUL Awaiting decision

    38 Windmill Lane Wolverhampton West Midlands WV3 8HG

    First floor side extension and loft conversion.

    16 Oct 2026 Full applications
  • 26/01107/FUL Awaiting decision

    Madina Food Centre 185 - 189 Wednesfield Road Wolverhampton West Midlands WV10 0EN

    Shopfront proposed Canopy

    Received 16 Oct, published by the council 20 Oct 2026 Full applications