Planning application
10 Woodhall Road Wolverhampton West Midlands WV4 4DJ
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Single storey side and two storey rear extension
As published by the council, reference 21/01699/FUL
Application record
- Reference
- 21/01699/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Granted As published: Grant
- Received
- 8 Dec 2021
- Validated
- 8 Dec 2021
- Decided
- 11 Mar 2022
- Ward
- Penn
- Decision by
- Delegated Decision
- Postcode
- WV4 4DJ
Timeline
Dates from the published record
-
8 Dec 2021
Received by Wolverhampton
-
11 Mar 2022
Decision issued: Grant
-
20 Nov 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Building Designs & Technical Services Agent, a design practice
125 applications on PlanIndex · across 6 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
7 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What this grant of permission means
Wolverhampton granted permission on 11 March 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
8 Woodhall Road Wolverhampton West Midlands WV4 4DJ
Single storey rear and side extension and two storey rear extension
Refused Full applications Extension 6 docsSmall domestic -
8 Woodhall Road Wolverhampton West Midlands WV4 4DJ
Two storey extension to side and single storey extension to rear.
Withdrawn Full applications Extension 4 docsSmall domestic -
14 Pinfold Lane Wolverhampton West Midlands WV4 4EE
Single storey rear extension.
Granted Full applications Extension 6 docsSmall domestic -
434 Penn Road Wolverhampton West Midlands WV4 4DH
T1 - Lime Tree - Crown lift tree to 3m from ground level. Cut back limbs from power cables to give 2m clearance. Remove epicormic growth also.
Granted Trees 2 docs -
434 Penn Road Wolverhampton West Midlands WV4 4DH
T1 - Pine - Crown lift tree to 3.5m above ground level. This is due to lowest branches over neighbours sheds causing damage and complaints. lowest ring of branches to be removed leaving the tree looking more symmetrical. Earlier this year storm damaged branches had to been removed from tree please see pictures.
Granted Trees 5 docs -
Woodlands Paddock Penn Road Wolverhampton West Midlands
Crown lift 1 Fir tree to 3.5 metres
Granted Trees 1 doc
Other full applications
In Wolverhampton
-
26/00019/FUL Granted
88A Hordern Road Wolverhampton West Midlands WV6 0HP
Boundary Wall (Partly Retrospective) and entrance gates
-
26/01145/FUL Granted
25 The Chase Wolverhampton West Midlands WV6 0WZ
Single storey side extension to create a garage.
-
26/01242/FUL Awaiting decision
31 Avenue Road Wolverhampton West Midlands WV3 9JS
Engineering works and retaining wall located in the rear garden (Partly Retrospective)
-
26/01235/FUL Awaiting decision
6 Woodthorne Road Wolverhampton West Midlands WV6 8TP
Single-storey side extension to replace the existing storage room and veranda.
-
26/01130/FUL Granted
Ramgarhia Sabha Sikh Temple 343 - 344 Newhampton Road East Wolverhampton West Midlands WV1 4AD
Proposed rear extension and new access ramp