Planning application
2 Glen Court Wolverhampton West Midlands WV3 9JW
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Single storey rear extension
As published by the council, reference 21/00772/FUL
Application record
- Reference
- 21/00772/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Grant
- Received
- 24 May 2021
- Validated
- 30 Jun 2021
- Decided
- 10 Aug 2021
- Ward
- Park
- Decision by
- Delegated Decision
- Postcode
- WV3 9JW
Timeline
Dates from the published record
-
24 May 2021
Received by Wolverhampton
-
30 Jun 2021
Validated
Checked as complete and ready for consideration.
-
10 Aug 2021
Decision issued: Grant
-
6 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Wolverhampton
7 applications on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
23 Glen Court Wolverhampton West Midlands WV3 9JW
Pruning of the Lime tree by the removal of sucker growth to allow a minimum of 3m over the footpath & 5.2m over the highway. G1.
Granted Trees 2 docs -
9 Glen Court Wolverhampton West Midlands WV3 9JW
02/2/006 (G1) T1 - Lime, reduce crown by 1/3 because of deadwood and signs of crown die back which could possibly fall on footpath or public highway.
Refused Trees 2 docs -
163 Compton Road Finchfield Wolverhampton West Midlands WV3 9JN
Two storey and single storey rear extensions
Granted Full applications Extension 5 docsSmall domestic -
59 Glen Court Wolverhampton West Midlands WV3 9JW
Retrospective application - single storey dining room extension, garage conversion and single storey side garage/storage extension
Granted Full applications Extension 5 docsSmall domestic -
86 Compton Road West Compton Wolverhampton West Midlands WV3 9DT
Amendment to previous planning permissions 06/0867/FP/R and 06/01336/FUL, comprising single storey link from conservatory to garage and larger ridge projection to front gable
Granted Full applications Extension 6 docsSmall domestic -
31 Avenue Road Wolverhampton West Midlands WV3 9JS
06/00273/TPO (T8) - Cedar Tree - Fell. Reason(s): Huge tree approx. 100ft; Blocks lighting to my house and surrounding houses; Pine needles and Pine cones contantly falling; Soil in surrounding garden - unable to plant or grow vegetation; Surrounding walls of garden and house become impacted by roots; Poses health risk for my family; My child suffers from extreme excema and dry skin; Branches are always falling from the tree onto my neighbors house; Future works in jeopardy for example building and outhouse; Recently parts of the tree have fallen with high winds :- 28/12/20; Causing cost to me and posing a health and safety risk danger to my neighbors and our family; A crack has appeared in the main trunk of the tree. (Work proposal confirmed on site with applicant on 11/01/21)
Granted Trees 2 docs
Other full applications applications
In Wolverhampton
-
26/00370/FUL Refused
146 Probert Road Wolverhampton West Midlands WV10 6UA
Proposed single storey rear extension, roof alterations and loft conversion
-
26/00951/FUL Awaiting decision
158 Warstones Road Wolverhampton West Midlands WV4 4LH
First floor side extension.
-
25/00406/FUL Granted
Garage Site Behind 6 To 20 Pace Crescent Wolverhampton West Midlands
Five new dwellings.
-
26/00621/FUL Granted
43 Marshall Road Wolverhampton West Midlands WV13 3PB
Single storey side and rear extension with loft conversion and new dormer. (Amended description)
-
26/00956/FUL Awaiting decision
21 Field Head Place Wolverhampton West Midlands WV6 8XE
Replacement of windows