Planning application
15 Ashfield Road Finchfield Wolverhampton West Midlands WV3 9DP
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Proposed two storey side extension and porch
As published by the council, reference 21/00665/FUL
Application record
- Reference
- 21/00665/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Grant
- Received
- 6 May 2021
- Validated
- 6 May 2021
- Decided
- 19 Jul 2021
- Ward
- Tettenhall Wightwick
- Decision by
- Delegated Decision
- Postcode
- WV3 9DP
Timeline
Dates from the published record
-
6 May 2021
Received by Wolverhampton
-
19 Jul 2021
Decision issued: Grant
-
25 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Glaisher Drive
154 applications on PlanIndex · across 13 councils · 87% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
15 Ashfield Road Finchfield Wolverhampton West Midlands WV3 9DP
Section 73 application to vary conditions 2 and 3 of application 21/00665/FUL (to alter the materials from the conditioned matching materials to part brickwork and render on the front elevation, render to the rear elevation, grey UPVC windows and new grey slate roof tiles).
Granted Conditions Roofing Windows or glazing 4 docs -
15 Ashfield Road Finchfield Wolverhampton West Midlands WV3 9DP
Section 73 application to vary conditions 2 and 3 of application 21/00665/FUL (to alter the materials from the conditioned matching materials to part brickwork and render on the front elevation, render to the rear elevation, grey UPVC windows and new grey slate roof tiles).
Granted Conditions Roofing Windows or glazing 4 docs -
15 Ashfield Road Finchfield Wolverhampton West Midlands WV3 9DP
New tarmac driveway and extended drop kerb
Granted Full applications 5 docs -
19A Ashfield Road Finchfield Wolverhampton West Midlands WV3 9DP
Raise existing roof, 3 dormer windows on front elevation, rear sky lights and window in side facing elevation.
Granted Full applications Loft or dormer Windows or glazing 4 docs -
21 Ashfield Road Finchfield Wolverhampton West Midlands WV3 9DP
90% historically approved · decision due ~15 Oct
Single storey front extension into car port and external works to existing porch.
Awaiting decision Full applications ExtensionSmall domestic -
29 Compton Road West Wolverhampton West Midlands WV3 9DW
a large mature beech on the boundry of the above property there is a siginifant overhang over clients property garden which he would like remove the severe overhang over the highway is not included actual specimen has a heavy lean so actual limbs for removal are carrying excessive weight including roadside on to a public highway which doe need to be addressed sooner or later not actually growing uniform shape we have not dones yet a visual or ariel check for any cavitys or fungus at stump ground level the speficied parts for removal are on attached pictures
Refused Trees 3 docs
Other full applications applications
In Wolverhampton
-
26/00370/FUL Refused
146 Probert Road Wolverhampton West Midlands WV10 6UA
Proposed single storey rear extension, roof alterations and loft conversion
-
26/00951/FUL Awaiting decision
158 Warstones Road Wolverhampton West Midlands WV4 4LH
First floor side extension.
-
25/00406/FUL Granted
Garage Site Behind 6 To 20 Pace Crescent Wolverhampton West Midlands
Five new dwellings.
-
26/00621/FUL Granted
43 Marshall Road Wolverhampton West Midlands WV13 3PB
Single storey side and rear extension with loft conversion and new dormer. (Amended description)
-
26/00956/FUL Awaiting decision
21 Field Head Place Wolverhampton West Midlands WV6 8XE
Replacement of windows