Skip to content
PlanIndex Get alerts
Menu

Planning application

241 Aldersley Road Wolverhampton West Midlands WV6 9NL

Granted Wolverhampton 21/00662/FUL Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Two storey side and rear extension, and single storey rear extension

As published by the council, reference 21/00662/FUL

Application record

Reference
21/00662/FUL
Type
Full Application
Status
Decided
Decision
Grant
Received
4 May 2021
Validated
4 May 2021
Decided
9 Aug 2021
Ward
Tettenhall Regis
Decision by
Delegated Decision
Postcode
WV6 9NL

Timeline

Dates from the published record

  1. 4 May 2021

    Received by Wolverhampton

  2. 9 Aug 2021

    Decision issued: Grant

  3. 6 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Wolverhampton

7 applications on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 241 Aldersley Road Aldersley Wolverhampton West Midlands WV6 9NL

    07/00911/FUL Submitted 26 Jun 2007 2m away

    Single storey rear/side extension

    Granted Full applications Extension 6 docs
    Small domestic
  • 1 Kestrel Rise Wolverhampton West Midlands WV6 9LU

    TREE/0179/07/TR Submitted 20 Aug 2007 54m away

    T1: 1 No Oak: Remove dead branches & dead wood throughout. Trim branches - shorten ends to raise to 5.2m. Check site of old lightning strike.T2: 1 No Oak: Cut back nearest property to reduce growth, to give 1.5m Clearance. Remove deadwood. Remove epicormic growth.T3: Remove epicormic growth & deadwood. T4: Check site of old branch, removal.

    Granted Trees 2 docs
  • 1 Kestrel Rise Wolverhampton West Midlands WV6 9LU

    22/01107/TR Submitted 6 Sep 2022 55m away

    06/00534/TPO (G1) - T1 - Oak tree closest to Kestrel Rise - Crown reduce radial branch spread by no more than 1.5 metres back to appropriate pruning points. T2 & T3 - Two oak trees close together in rear garden - Remove epicormic growth up to a height of no more than 5.5 metres; T4 - Oak Tree located centrally in rear garden - Crown reduce radial branch spread by no more than 1 - 1.5 metres back to appropriate pruning points.

    Granted Trees 2 docs
  • 31 Crossland Crescent Wolverhampton West Midlands WV6 9LG

    21/00125/CPL Submitted 2 Feb 2021 70m away

    Lawful development certificate for the single storey rear extension and separate side extension

    Granted Lawful development Extension 3 docs
    Small domestic
  • 296 Aldersley Road Wolverhampton West Midlands WV6 9NP

    24/00766/TR Submitted 12 Jul 2024 85m away

    07/00012/TPO (T1) Reduce the crown by no more than 5m or back to the previous pruning points to reshape and restore the balance in the tree. Cut lower new branches (see photos) and branches touching the roof of property (overhanging). Cut back branches growing into the road.

    Refused Trees 14 docs
  • 296 Aldersley Road Aldersley Wolverhampton West Midlands WV6 9NP

    07/00642/FUL Submitted 3 May 2007 106m away

    Two storey side and rear extensions.

    Refused Full applications Extension 6 docs

In Wolverhampton

  • 26/00370/FUL Refused

    146 Probert Road Wolverhampton West Midlands WV10 6UA

    Proposed single storey rear extension, roof alterations and loft conversion

    14 Apr 2026 Full applications
  • 25/00406/FUL Granted

    Garage Site Behind 6 To 20 Pace Crescent Wolverhampton West Midlands

    Five new dwellings.

    1 Apr 2025 Full applications
  • 26/00621/FUL Granted

    43 Marshall Road Wolverhampton West Midlands WV13 3PB

    Single storey side and rear extension with loft conversion and new dormer. (Amended description)

    4 Jun 2026 Full applications
  • 26/00536/FUL Granted

    24 Springfield Lane Wolverhampton West Midlands WV10 6PX

    Two storey side extension

    14 May 2026 Full applications
  • 26/00740/FUL Granted

    32 Danescourt Road Wolverhampton West Midlands WV6 9BG

    Single storey rear extension

    6 Jul 2026 Full applications