Planning application

Land Opposite Junction Of Mammoth Drive With Coxwell Avenue Wolverhampton West Midlands

Granted Wolverhampton 07/01449/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of 2 No. four storey office buildings and 1 No. five storey office building, including associated car parking and landscaping.

As published by the council, reference 07/01449/FUL

Application record

Reference
07/01449/FUL
Type
Full Application
Status
Decided
Decision
Grant
Received
12 Oct 2007
Validated
26 Oct 2007
Decided
24 Jan 2008
Ward
Bushbury South And Low Hill
Decision by
Committee Decision

Timeline

Dates from the published record

  1. 12 Oct 2007

    Received by Wolverhampton

  2. 26 Oct 2007

    Validated

    Checked as complete and ready for consideration.

  3. 24 Jan 2008

    Decision issued: Grant

  4. 25 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Wolverhampton Science Park Coxwell Avenue Wolverhampton West Midlands

    25/01021/OUT Submitted 9 Sep 2025 9m away

    Outline planning application for a multi-phased, severable commercial development of up to 19,245 square metres of light industrial, research and development, and office floorspace (Use Class E), including a limited proportion of B2 General industrial and B8 Storage and Distribution uses, with ancillary car and cycle parking, creation of public realm, highway works, drainage attenuation, landscaping and associated infrastructure works. All matters reserved except for means of access. Please note that this Outline Planning Application forms part of a Hybrid Planning Application and should be read in conjunction with the accompanying Full Planning Permission (LPA reference 25/01020/FUL).

    Granted Outline 34 docs
  • Lock Number 13 Coxwell Avenue Wolverhampton West Midlands

    24/01148/LBC Submitted 25 Oct 2024 34m away

    At locks 2 and 13 ladder recess extension, new ladder with continuous hoops, alteration of handrails to swan neck handrails and treads on lock quadrants. At lock 13 repairs to the timber ties and approach walls.

    Granted Heritage and listed buildings Extension 9 docs
  • Land At And Adjoining Wolverhampton Science Park Coxwell Avenue Wolverhampton West Midlands

    25/01020/FUL Submitted 9 Sep 2025 86m away

    Full planning permission for multi-phased site enabling works including demolition, site clearance, ground remediation, excavation and reprofiling works, site access and associated infrastructure works. Please note that this Full Planning Application forms part of a Hybrid Planning Application and should be read in conjunction with the accompanying Outline Planning Application (LPA reference 25/01021/OUT).

    Granted Full applications Demolition 29 docs
  • Former Cadent Gas Stafford Road Wolverhampton West Midlands WV10 6HZ

    22/01065/DEM Submitted 13 Sep 2022 121m away

    Demolition of main office building, garage, store and training room

    Granted Other Demolition 3 docs
  • McDonalds Restaurant 90 Stafford Road Wolverhampton West Midlands WV10 6JF

    25/00715/FUL Submitted 23 Jun 2025 143m away

    Installation of two rapid electric vehicle charging stations and ancillary equipment within the car park

    Granted Full applications 18 docs
  • McDonalds Restaurant 90 Stafford Road Wolverhampton West Midlands WV10 6JF

    19/01411/ADV Submitted 5 Dec 2019 145m away

    The installation of 5 new digital freestanding signs and 1 new 15" digital booth screen.

    Granted Advertising 6 docs

In Wolverhampton

  • 26/00370/FUL Refused

    146 Probert Road Wolverhampton West Midlands WV10 6UA

    Proposed single storey rear extension, roof alterations and loft conversion

    14 Apr 2026 Full applications
  • 25/00406/FUL Granted

    Garage Site Behind 6 To 20 Pace Crescent Wolverhampton West Midlands

    Five new dwellings.

    1 Apr 2025 Full applications
  • 26/00621/FUL Granted

    43 Marshall Road Wolverhampton West Midlands WV13 3PB

    Single storey side and rear extension with loft conversion and new dormer. (Amended description)

    4 Jun 2026 Full applications
  • 26/00536/FUL Granted

    24 Springfield Lane Wolverhampton West Midlands WV10 6PX

    Two storey side extension

    14 May 2026 Full applications
  • 26/00740/FUL Granted

    32 Danescourt Road Wolverhampton West Midlands WV6 9BG

    Single storey rear extension

    6 Jul 2026 Full applications