Planning application
Royal Wolverhampton School Penn Road Wolverhampton West Midlands WV3 0EG
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
New gates and railings.
As published by the council, reference 07/01032/FUL
Application record
- Reference
- 07/01032/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Grant
- Received
- 19 Jul 2007
- Validated
- 25 Jul 2007
- Decided
- 1 Oct 2007
- Ward
- Blakenhall
- Decision by
- Delegated Decision
- Postcode
- WV3 0EG
Site history
Applications at this address on the Wolverhampton register
This site has had 6 applications since 2007: 4 approved, 0 refused.
-
26/00672/FUL Granted
Royal Wolverhampton School Penn Road Wolverhampton West Midlands WV3 0EG
Construction of a two storey temporary dormitory building and associated external works for up to 2 years
-
26/00058/REM Awaiting decision
Royal Wolverhampton School Penn Road Wolverhampton West Midlands WV3 0EG
Discharge of condition - Biodiversity Gain Plan, Ecological Management & Monitoring Plan, Biodiversity Statement & Metric Assessment
-
24/01123/FUL Granted
Royal Wolverhampton School Penn Road Wolverhampton West Midlands WV3 0EG
Construction of a two storey primary school building, with associated outdoor recreation areas, parking and infrastructure, the partial demolition, internal refurbishment, new entrance ramp and two storey extension of secondary school buildings (including works affecting a Grade II Listed building), the single storey extension of a modern secondary school building, the redevelopment of a sports hall and construction of sports pitches, construction of temporary accommodation, plus associated landscape and infrastructure.
-
24/00731/TN Awaiting decision
Royal Wolverhampton School Penn Road Wolverhampton West Midlands WV3 0EG
Works to sycamore and lime trees to prune back row off trees along factory units by tennis courts to crown lift the trees both sides to clear roof of factory units by 2/3 metres and tennis courts side and all waste woodchipped and spread on site appropriately, works required due to factory?s at back having roofing replaced by landlord and can?t be replaced without pruning back branches sat on the roof currently as per photos attached, tennis court side is to just up keep with maintenance from the trees touching the netting of the courts themselves, deadwood will be removed as work is carried out to prevent any large diameter deadwood landing on new roof once replaced.
-
24/00496/TN Granted
Royal Wolverhampton School Penn Road Wolverhampton West Midlands WV3 0EG
T1 Lime tree: Reduce to first bifurcation, about 6m. Prune back of other lime tree T2 by 2 metres to clear away from property side only. Sycamore T3: Prune back to boundary. Remove of any dead sycamore trees and deadwood within the group marked G1 on car park side of 16 Goldthorn road property to leave at stump level. Proposal amended from application after discussion with applicant.
Timeline
Dates from the published record
-
19 Jul 2007
Received by Wolverhampton
-
25 Jul 2007
Validated
Checked as complete and ready for consideration.
-
1 Oct 2007
Decision issued: Grant
-
23 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Wolverhampton granted permission on 1 October 2007, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Royal Wolverhampton School Penn Road Wolverhampton West Midlands WV3 0EG
Construction of a two storey temporary dormitory building and associated external works for up to 2 years
Granted Full applications 11 docs -
Hilda Haywood Swimming Pool Goldthorn Road Wolverhampton West Midlands WV2 4QT
Replacement of existing single storey temporary classroom with a two-storey temporary classroom building and ancillary works
Granted Full applications 10 docsSmall domestic -
142 Penn Road Wolverhampton West Midlands WV3 0DZ
Proposed signage for dental practice
Granted Full applications 6 docs -
144 Penn Road Wolverhampton West Midlands WV3 0EE
90% historically approved · decision due ~2 Nov
Change of us from C2 residential care facility to C3 residential dwellinghouse.
Awaiting decision Full applications 5 docsDomestic -
Unit 70 Imex Trading Estate 70 Moorfield Road Wolverhampton WV2 4XD
90% historically approved · decision due ~5 Jun
Proposed use of site for food production (use Class E) including on site sales offering
Awaiting decision Full applications 7 docs -
Unit 4 Villiers Trading Estate Marston Road Wolverhampton West Midlands WV2 4LA
Car dismantling and recycling business
Granted Full applications 8 docs
Other full applications
In Wolverhampton
-
26/00997/FUL Awaiting decision
Rocco Boats Lock Street Wolverhampton West Midlands WV1 1JJ
Erection of a three-bedroom dwellinghouse and a replacement welfare building on part of an existing boatyard site. The remainder of the site is retained in its existing use as a working boatyard.
-
26/00998/FUL Awaiting decision
114 Broad Lane South Wolverhampton West Midlands WV11 3SD
single storey rear double storey rear & side extensions
-
26/00991/FUL Awaiting decision
7 Cherrywood Green Wolverhampton West Midlands WV14 6HL
Erection of a single storey rear extension with a flat roof and roof lantern, together with associated internal alterations.
-
26/00990/FUL Awaiting decision
85 Birches Barn Road Wolverhampton West Midlands WV3 7BJ
Part single, part two storey rear extensions and garage conversion to lounge.
-
26/00877/FUL Granted
Moreton Community School Old Fallings Lane Wolverhampton West Midlands WV10 8BY
Classroom extension block to support local authority need for increased pupil numbers.