Skip to content
PlanIndex Get alerts
Menu

Planning application

St Bedes Finchfield Gardens Finchfield Wolverhampton West Midlands WV3 9LT

Granted Wolverhampton 07/00378/FUL Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey rear extension

As published by the council, reference 07/00378/FUL

Application record

Reference
07/00378/FUL
Type
Full Application
Status
Decided
Decision
Grant
Received
13 Mar 2007
Validated
5 Apr 2007
Decided
18 May 2007
Ward
Park
Decision by
Delegated Decision
Postcode
WV3 9LT

Timeline

Dates from the published record

  1. 13 Mar 2007

    Received by Wolverhampton

  2. 5 Apr 2007

    Validated

    Checked as complete and ready for consideration.

  3. 18 May 2007

    Decision issued: Grant

  4. 15 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 5 Finchfield Gardens Wolverhampton West Midlands WV3 9LT

    26/00669/CPL Submitted 18 Jun 2026 24m away

    95% historically approved · decision due ~17 Aug

    Rear Velux Roof Light Loft Conversion

    Decided Lawful development Loft or dormer
  • 10 Finchfield Gardens Wolverhampton West Midlands WV3 9LT

    07/01347/FUL Submitted 24 Sep 2007 40m away

    Front garage, porch and rear orangery extensions.

    Refused Full applications Extension 6 docs
    Small domestic
  • 10 Finchfield Gardens Wolverhampton West Midlands WV3 9LT

    08/00110/FUL Submitted 23 Jan 2008 40m away

    Store room to side, Summer house to the rear and front porch

    Granted Full applications Extension 6 docs
    Small domestic
  • Westwood Finchfield Gardens Wolverhampton West Midlands WV3 9LT

    22/01068/TN Submitted 2 Sep 2022 46m away

    Japanese Cedar on front boundary - selectively remove dead branches from within canopy to open up interior of lower crown; cut back previous pruning stubs closer to parent stem where they are close to the public highway. Monitor lean for progression and to help determine if the lean is due to root plate rotation or main limb subsidence; Oak and hazel trees along side boundary - remove small diameter (up to 2 cm diameter) epicormic growth that arises from main trunk as necessary; Birch in rear garden - crown reduce overall by up to 2 metres, prioritising the shortening back of the elongated growth shoots that have developed since previous pruning; Apple - selectively reduce end weight by reducing the end growth arising from the long lateral limbs by up to a maximum one metre, but preferably closer to 60 cm, and cut back to appropriate pruning points above the hedge line to prevent overhang on neighbour's garden at the rear.

    Granted Trees 1 doc
  • 6 Finchfield Gardens Wolverhampton West Midlands WV3 9LT

    22/00907/TN Submitted 3 Aug 2022 50m away

    Remove group of self-set ash saplings along South eastern boundary; Crown lift yew tree by 600mm

    Granted Trees 1 doc
  • 4 Finchfield Gardens Wolverhampton West Midlands WV3 9LT

    24/01107/TN Submitted 17 Oct 2024 58m away

    No more than 1m side reduction of trees to left of house looking from the road, removing material no larger than 25mm in diameter.

    Granted Trees 3 docs

In Wolverhampton

  • 26/00370/FUL Refused

    146 Probert Road Wolverhampton West Midlands WV10 6UA

    Proposed single storey rear extension, roof alterations and loft conversion

    14 Apr 2026 Full applications
  • 26/00951/FUL Awaiting decision

    158 Warstones Road Wolverhampton West Midlands WV4 4LH

    First floor side extension.

    4 Sep 2026 Full applications
  • 25/00406/FUL Granted

    Garage Site Behind 6 To 20 Pace Crescent Wolverhampton West Midlands

    Five new dwellings.

    1 Apr 2025 Full applications
  • 26/00621/FUL Granted

    43 Marshall Road Wolverhampton West Midlands WV13 3PB

    Single storey side and rear extension with loft conversion and new dormer. (Amended description)

    4 Jun 2026 Full applications
  • 26/00956/FUL Awaiting decision

    21 Field Head Place Wolverhampton West Midlands WV6 8XE

    Replacement of windows

    3 Sep 2026 Full applications